Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | 1₹9.8 LAccepted-Finance | 1 | Accepted-Finance LOWEST1 | |
| 2 | 2₹12.4 L+₹2.6 L (26.4%)Accepted-Finance | 2 | Accepted-Finance LOWEST2 | |
| 3 | 3₹12.8 L+₹2.9 L (29.6%)Accepted-Finance | 3 | Accepted-Finance LOWEST3 | |
| 4 | 4₹14.5 L+₹4.7 L (47.7%)Accepted-Finance | 4 | Accepted-Finance LOWEST4 |
Tender Value
Refer Docs
Closing Date
29 Mar 2021, 4:30 pmClosed
XEN REW Kathua
XEN REW Kathua
Construction of Synthetic Volleyball court at HSS Bani, Kathua Under YSS Scheme
2021_RDPR_121152_1
Construction of Synthetic Volleyball court at HSS
Open Tender
Civil Works
Item Rate
40 days
Bani
as per SBD
4 documents required · 4 mandatory
₹1,000
Yes
XEN REW Kathua
Exempted
20 Apr 2021
23 Mar 2021
30 Mar 2021
24 Mar 2021
29 Mar 2021
24 Mar 2021
Amount
Earth work in bulk excavation by manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 m2 on plan) including disposal of excavated earth lead upto 50 meters and lift upto 1.5 m, All kind of soil.
Earth work in excavation by manual means in trenches for foundations, drains, pipes, cables etc. (not exceeding 1.5 m in width) and for shafts, wells, cesspits and the like not exceeding 10 sqm on plan, including dressing of sides and ramming of bottoms lift upto 1.5 m, including getting out excavated earth and disposal of surplus excavated earth as directed:
Providing and laying in position cement concrete of specified grade including curing but excluding the cost of centring and shuttering. All work upto plinth level with:1:5:10 (1 cement : 5 coarse sand : 10 graded stone aggregate 40 mm nominal size)
Providing and laying in position cement concrete of specified grade including curing but excluding the cost of centring and shuttering. All work upto plinth level with:1:3:6 (1 cement : 3 coarse sand : 6 graded stone aggregate 20 mm nominal size)
Hand Packed stones filling including supply of stones:
Providing and laying in position specified grade of reinforced cement concrete including curing but excluding the cost of centering, shuttering, finishing and reinforcement. All works upto plinth level 1:1½:3 (1 cement : 1½ coarse sand : 3 graded stone aggregate 20 mm nominal size)
Steel Reinforcement for R.C.C. work including straightening, cutting, bending, placing in position and binding all complete above plinth level
Dry random rubble masonry with hard stone in foundation and plinth: Without bond stone
FORM WORK Centering and shuttering including strutting, propping etc. and removal of form for:
Foundations, footings, bases of columns etc. for mass concrete
Providing and laying damp-proof Course 50 mm thick with cement concrete 1:2:4 (1 cement:2 coarse sand: 4 graded stone aggregate 20 mm nominal size) and curing complete
20mm Cement plaster of mix:1 : 6 ( 1 cement : 6 fine sand)
Providing and laying of Synthetic coating to smoothing the surface in 8 layers.
2 Layers of Re surfacer.
4 Layers of crushioning ( rubber).
2 Layer of colour coating acrylic rubber .
Line marking .
Supply and fixing of Volley Ball Poles and Net as per FIVA specifications complete job .
Carriage of material by M.T & A.T
Carriage of Cement av. 3 KM by M.T
Carriage of Sand av. 160 KM by M.T
Carriage of Stone Agg. av. 160 KM by M.T
Carriage of Stones av. 10 KM by M.T
RATTAN CHAND GOVT CONTRACTOR
mohd arshid
M/S BODH RAJ GOVT CONTRACTOR
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .