Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹81.8 LAdmitted-Finance NO 25 OTTHAVADA STREET NEAR NEW BUS STAND ARAKKONAM 631 001 | ARAKKONAM | RANIPET | TAMIL NADU | 631001 | L1 | Admitted-Finance | |
| 2 | L2₹82.0 L+₹13,806 (0.17%)Admitted-Finance NO 2 98 TRICHY MAIN ROAD PIDAGAM POST VILLPURAM TALUK 605401 | PIDAGAM | VILLUPURAM | TAMIL NADU | 605401 | L2 | Admitted-Finance | |
| 3 | L3₹84.7 L+₹2.9 L (3.51%)Admitted-Finance PLOT NO 27 PADAMAVATHY NAGAR MAIN ROAD NALUR BRANCH POST MINJUR 601 203 | MINJUR | THIRUVALLUR | TAMIL NADU | 601203 | L3 | Admitted-Finance | |
| 4 | L4₹88.0 L+₹6.1 L (7.51%)Admitted-Finance | L4 | Admitted-Finance | |
| 5 | L5₹90.1 L+₹8.3 L (10.2%)Admitted-Finance 19B CHIDAMBARANATHAPURAM DEVAKOTTAI SIVAGANGAI DISTRICT | PUDUKKOTTAI | TAMIL NADU | 621308 | L5 | Admitted-Finance |
| Sl No | Description | Qty | Unit | D RAVI L1 | K DHINAKARAN L2 | M/s.V.APPU ENTERPRISES L3 | Dillibabu L4 | S S AND CO L5 | K S CONSTRUCTION L6 | K.RAMESH L7 |
|---|---|---|---|---|---|---|---|---|---|---|
| 1.00 | Earth work excavation for foundation including all labour charges including initial lead, lift, etc., complete.for Hard Gravelly soil SS | 1,275 | cum | - | - | - | - | - | - | - |
| 2.00 | Earth work excavation for foundation including all labour charges including initial lead, lift, etc., complete.for SDR NOT REQUIRING BLASTING | 141 | cum | - | - | - | - | - | - | - |
| 3.00 | Supplying and filling river sand for foundation and basement including watering and consolidation in 15 cm ayers including cost of sand all labour, lead, lift, etc., complete. | 74 | cum | - | - | - | - | - | - | - |
| 4.00 | PCC 1:3:6 mix using 12 - 20mm HBG machine crushed metal for foundation without form work concrete including cost of all labour,materials ,lead, lift, curing etc.complete | 74 | cum | - | - | - | - | - | - | - |
| 5.00 | RCC 1:1.5:3, using 12 to 20 mm HBG machine crushed metal for Raft concrete with formwork including cost of cement and all lead, lift , curing etc., complete but excluding cost of steel reinforcement. (By using mixer machine and vibrators) and as directed by the Engineer-in-charge at site. | 198 | m3 | - | - | - | - | - | - | - |
| 6.00 | RCC 1:1.5:3, using 12 to 20 mm HBG machine crushed metal for cover slab with formwork including cost of cement and all lead, lift , curing etc., complete but excluding cost of steel reinforcement. (By using mixer machine and vibrators) and as directed by the Engineer-in-charge at site. | 74 | m3 | - | - | - | - | - | - | - |
| 7.00 | RCC 1:1.5:3, using 12 to 20 mm HBG machine crushed metal for cable duct side walls with formwork including cost of cement and all lead, lift , curing etc., complete but excluding cost of steel reinforcement. (By using mixer machine and vibrators) and as directed by the Engineer-in-charge at site. | 253 | m3 | - | - | - | - | - | - | - |
| 8.00 | Supplying and fabricating and placing in position of MS/RTS steel reinforcement for RCC works including labour for cutting , bending , tying and fixing in position as per specification including cost of all materials ,lead ,lift ,labour ,cost of binding wire etc.comlete and as directed by the Engineer-in-charge at site. | 49 | MT | - | - | - | - | - | - | - |
| 9.00 | Supplying, fabricating in GI angle/flats including cost of MS angle ,Flats , as per drawing and specification and galvanising ,placing in position , including cost of all materials, galvanizing charges , transportation, labour, lead, lift etc complete as directed by the dept. Engr at site | 15 | MT | - | - | - | - | - | - | - |
| 10.00 | Supplying and fixing of casing pipe line for laying cable to breaker plinths with 110 mm dia PVC pipe 6 kg/cm2 including all specials and cost of all material, lead, lift, etc., complete as per standard specification. | 50 | RM | - | - | - | - | - | - | - |
Tender Value
₹1.1 Cr
EMD Value
₹1.1 L
Closing Date
3 Sept 2020, 2:00 pmClosed
CE/TP-I/CHN
A10,GUINDY IND ESTATE ,CHENNAI -32
Construction of RCC A Type cable duct for the 230 Kv and 110 KV UG cable to be laid inside the sub station premises for the proposed Mambakkam 230/110 KV SS
2020_EB_176134_1
TP1-025/2020-21
Open Tender
Civil Works
Works
120 days
Guindy
Please refer Tender documents.
2 documents required · 2 mandatory
₹0
₹1.1 L
Yes
7 Oct 2020
19 Aug 2020
4 Sept 2020
19 Aug 2020
3 Sept 2020
19 Aug 2020
Amount
Earth work excavation for foundation including all labour charges including initial lead, lift, etc., complete.for Hard Gravelly soil SS
Earth work excavation for foundation including all labour charges including initial lead, lift, etc., complete.for SDR NOT REQUIRING BLASTING
Supplying and filling river sand for foundation and basement including watering and consolidation in 15 cm ayers including cost of sand all labour, lead, lift, etc., complete.
PCC 1:3:6 mix using 12 - 20mm HBG machine crushed metal for foundation without form work concrete including cost of all labour,materials ,lead, lift, curing etc.complete
RCC 1:1.5:3, using 12 to 20 mm HBG machine crushed metal for Raft concrete with formwork including cost of cement and all lead, lift , curing etc., complete but excluding cost of steel reinforcement. (By using mixer machine and vibrators) and as directed by the Engineer-in-charge at site.
RCC 1:1.5:3, using 12 to 20 mm HBG machine crushed metal for cover slab with formwork including cost of cement and all lead, lift , curing etc., complete but excluding cost of steel reinforcement. (By using mixer machine and vibrators) and as directed by the Engineer-in-charge at site.
RCC 1:1.5:3, using 12 to 20 mm HBG machine crushed metal for cable duct side walls with formwork including cost of cement and all lead, lift , curing etc., complete but excluding cost of steel reinforcement. (By using mixer machine and vibrators) and as directed by the Engineer-in-charge at site.
Supplying and fabricating and placing in position of MS/RTS steel reinforcement for RCC works including labour for cutting , bending , tying and fixing in position as per specification including cost of all materials ,lead ,lift ,labour ,cost of binding wire etc.comlete and as directed by the Engineer-in-charge at site.
Supplying, fabricating in GI angle/flats including cost of MS angle ,Flats , as per drawing and specification and galvanising ,placing in position , including cost of all materials, galvanizing charges , transportation, labour, lead, lift etc complete as directed by the dept. Engr at site
Supplying and fixing of casing pipe line for laying cable to breaker plinths with 110 mm dia PVC pipe 6 kg/cm2 including all specials and cost of all material, lead, lift, etc., complete as per standard specification.
GST for bidders within TamilNadu
GST for bidders outside TamilNadu (IGST)
K DHINAKARAN
M/s.V.APPU ENTERPRISES
Dillibabu
S S AND CO
K S CONSTRUCTION
K.RAMESH
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.38 MB
BOQ_210983.xls
BOQ • 0.24 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .