Loading…
Loading…
| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹1.9 LAdmitted-Fee/PreQual/Technical/Finance | L1 | Admitted-Fee/PreQual/Technical/Finance | ||
| 2 | L2₹2.2 L+₹28,254.60 (15.1%)Admitted-Fee/PreQual/Technical/Finance | L2 | Admitted-Fee/PreQual/Technical/Finance |
Tender Value
₹2.9 L
EMD Value
₹5,822
Closing Date
25 Sept 2026, 4:00 pmClosed
Executive Engineer RNB Division vailoo
office of Executive Engineer RNB Division vailoo
Construction of Boundary wall for Model Higher Secondary School Chitterrgul
2026_PWDJK_324939_2
eNIT44DivisionVailoo
Open Tender
Civil Works
Percentage
20 days
vailoo
Please refer Tender documents.
2 documents required · 2 mandatory
₹200
Yes
Centralized Designated Pooling Account
₹5,822
Yes
29 Sept 2026
17 Sept 2026
26 Sept 2026
17 Sept 2026
25 Sept 2026
17 Sept 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earth work in excavation by mechanical means (Hydraulic excavator)/manual means in foundation trenches or drains (not exceeding 1.5 m width or 10 sqm on plan), including dressing of sites and ramming of bottoms, lift upto 1.5 m, including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50 m . All kinds of soil | 7.2 | CUM | 225.18 | ₹1,621.28 |
| 2 | Prroviding and laying stone soiling of speceifed size duely hand packed including all carrages loading / unloading | 0.69 | cum | 847.46 | ₹584.75 |
| 3 | Providing and laying in position cement concrete of 1:4:8 ratio excl cost of centering shuttering and carraige all work in foundation using coarse sand and 40mm nominal size aggregates complete job | 0.43 | CUM | 4,561.36 | ₹1,961.38 |
| 4 | Providing and laying in position specified grade of reinforced cement concrete including curing but excluding the cost of centering , shuttering , finishing and reinforcement . All works upto plinth level 1:11/2 :3 ( 1 cement : 1 1/2 coarse sand : 3 graded stone agg. 20 mm nominal size | 2.96 | cum | 6,828.05 | ₹20,211.03 |
| 5 | Reinforcment for RCC work including straighting , cutting , bending , placing in position and binding all complete (Thermo- mechanically treated bars) | 296.29 | kg | 108.01 | ₹32,001.99 |
| 6 | Providing and laying in position cement concrete of 1:2:4 ratio excl cost of centering shuttering and carraige all work in foundation using coarse sand and 20mm nominal size aggregates complete job | 12.92 | cum | 5,778.52 | ₹74,658.44 |
| 7 | Brick work with FPS bricks 75 in foundation and plinth in cement mortar 1:6 1 cement : 6 coarse sand with extra for brick work in super structure above plinth upto floor five level including all coats and carriage by MT and HL | 9.74 | cum | 8,050.85 | ₹78,415.26 |
| 8 | Demolishing brick work manually by mechanically means including stacking of servicable and disposal of unservicable material within 50 m lead as per direction of Engineer in charge . | 6.67 | cum | 1,278.62 | ₹8,528.39 |
| 9 | Centering and shuttering including strutting , propping etc. and removal of the same for foundations above plinth level . | 55.64 | sqm | 251.04 | ₹13,967.98 |
| 10 | Back filling behind walls by way of granular material/ Nallah muck including all coats and carriages | 4.35 | cum | 762.71 | ₹3,317.8 |
stage.html
html • 0.02 MB
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.64 MB
BOQ_1096610.xls
BOQ • 0.44 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .