Loading…
Loading…
| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹1.4 LAdmitted-Fee/PreQual/Technical/Finance | -1.01% | ₹1.4 L | L1 | Admitted-Fee/PreQual/Technical/Finance |
| 2 | L2₹1.4 L+₹1,273.21 (0.92%)Admitted-Fee/PreQual/Technical/Finance | -0.10% | ₹1.4 L+₹1,273.21 (0.92%) | L2 | Admitted-Fee/PreQual/Technical/Finance |
| 3 | L3₹1.4 L+₹1,413.12 (1.02%)Admitted-Fee/PreQual/Technical/Finance | +0.00% | ₹1.4 L+₹1,413.12 (1.02%) | L3 | Admitted-Fee/PreQual/Technical/Finance |
Tender Value
₹1.4 L
EMD Value
₹4,197
Closing Date
12 Aug 2026, 6:00 pmClosed
Office of the Executive Engineer REW Anantnag
Office of the Executive Engineer REW Anantnag
CONSTRUCTION OF WASHROOM FOR GOVT. MIDDLE SCHOOL GADVAIL BLOCK LARNOO
2026_RDPR_319330_55
ENIT85of2026-27
Open Tender
Civil Works
Percentage
30 days
Anantnag
Please refer Tender documents.
2 documents required · 2 mandatory
₹200
Office of the Executive Engineer REW Anantnag
₹4,197
16 Aug 2026
5 Aug 2026
13 Aug 2026
5 Aug 2026
12 Aug 2026
5 Aug 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earth work in excavation by manual means in trenches for foundations,
drains, pipes, cables etc. (not exceeding 1.5 m in width) and for shafts,
wells, cesspits and the like not exceeding 10 sqm on plan, including
dressing of sides and ramming of bottoms lift upto 1.5 m, including getting
out excavated earth and disposal of surplus excavated earth as directed All kinds of soil : | 1 | Cum | - | - |
| 2 | P/L of nllah muck soling hand packed for foundation i/c carriage . complete job.(I/C 10% Deduction of voids) | 1 | Cum | - | - |
| 3 | Dry random rubble masonry with hard stone in foundation and plinth Without bond stone | - | Cum | - | - |
| 4 | Providing and laying in position cement concrete of specified grade including curing but excluding the cost of centring and shuttering. All work upto plinth level with: in 1:3:6 using 40mm nominal size aggregate.with 20% Plum | - | Cum | - | - |
| 5 | PLUMS | - | Cum | - | - |
| 6 | Providing and laying in position cement concrete of specified grade including curing but excluding the cost of centring and shuttering. All work upto plinth level with: 1:4:8 (1 cement : 4 coarse sand : 8 graded stone aggregate 40 mm nominal size) for foundation. | - | Cum | - | - |
| 7 | Brick work with common burnt clay (non-modular) bricks of class designation 7.5 in foundation and plinth including curing in : Cement mortar 1:6 ( 1 cement : 6 coarse sand) | 1 | Cum | 1 | ₹1 |
| 8 | 12mm Cement plaster of mix: 1 : 6 | - | sqm | 1 | - |
| 9 | Providing and laying in position specified grade of reinforced cement concrete includingcuring but excluding the cost of centering, shuttering, finishing and reinforcement. All works upto plinth level: 1:2:4 (1 cement : 2 coarse sand : 4 graded stone aggregate 20 mm nominal size) | - | cum | - | - |
| 10 | Centering and Shuttering etc and removal of formwork | 1 | Sm | - | - |
stage.html
html • 0.02 MB
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.27 MB
BOQ_1057792.xls
BOQ • 0.33 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .