| 1 | 1₹47.0 LAccepted-Finance | 1 | Accepted-Finance Based on the BOQ | |
| 2 | 2₹47.4 L+₹40,663.74 (0.86%)Accepted-Finance | 2 | Accepted-Finance Based on the BOQ |
Tender Value
Refer Docs
EMD Value
₹48,000
Closing Date
14 Jul 2022, 4:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
Project Director
Integrated Office Complex for Rural Development Department , 1st floor, DRDA, Theni
Renovation of 7 No.s of water bodies under AGAMT II scheme in Theni Block of Theni District for the year 2021-22
2022_RDTN_238705_1
2635/2021/AGAMT II Dt 28.06.2022
Open Tender
Civil Works - Others
Item Rate
180 days
Theni
As per tender document
3 documents required · 3 mandatory
₹0
₹48,000
1st floor, DRDA, Theni
31 Jan 2023
1 Jul 2022
14 Jul 2022
1 Jul 2022
14 Jul 2022
6 Jul 2022
6 Jul 2022
Amount
Construction of Bathing Ghate and retaining wall at Koolappa goundar oorani unjampatti pt Earth work excavation for foundation in all soils and sub-soils to full depth as may be directed except in hard rock requiring blasting but inclusive of shoring, strutting and bailing out water wherever necessary and refilling the sides of foundation with excavated earth in layers of not more than 15 cm thick well rammed and consolidate and depositing the surplus earth in all places shown by the departmental officers with initial lead and lift etc., complying with standard specification asperSS20 B.
Plain Cement Concrete 1:4:8 using 40 mm HBG metal for basement and flooring layers not more than 15 cm thick including cost and conveyance of materials to site and all other labour charges including consolidation as per standard specification
Centering shuttering including necessary support for plane surface in Foundation and Basement and in all floors using mild steel sheets of size 90x60 cm and 10 gauge stiffened, welded with steel angles of size 25mmx25mm x3mm for boarding laid over silver oak (country wood) joints of 10cm size x6.5cm size spaced at about 90 cm center to center and supported casuarina props of 10 cm to 13 cm dia spaced at 75 cm center to center complete complying with standard specification.
Plain Cement Concrete 1:3:6 using 40 mm HBG metal for basement and flooring layers not more than 15 cm thick including cost and conveyance of materials to site and all other labour charges including consolidation as per standard specification
Provision for name board
Construction of Bathing Ghate at manthaioorani koduvilarpatty pt
Earth work excavation for foundation in all soils and sub-soils to full depth as may be directed except in hard rock requiring blasting but inclusive of shoring, strutting and bailing out water wherever necessary and refilling the sides of foundation with excavated earth in layers of not more than 15 cm thick well rammed and consolidate and depositing the surplus earth in all places shown by the departmental officers with initial lead and lift etc., complying with standard specification asperSS20 B.
Plain Cement Concrete 1:4:8 using 40 mm HBG metal for basement and flooring layers not more than 15 cm thick including cost and conveyance of materials to site and all other labour charges including consolidation as per standard specification
Centering shuttering including necessary support for plane surface in Foundation and Basement and in all floors using mild steel sheets of size 90x60 cm and 10 gauge stiffened, welded with steel angles of size 25mmx25mm x3mm for boarding laid over silver oak (country wood) joints of 10cm size x6.5cm size spaced at about 90 cm center to center and supported casuarina props of 10 cm to 13 cm dia spaced at 75 cm center to center complete complying with standard specification.
Plain Cement Concrete 1:3:6 using 40 mm HBG metal for basement and flooring layers not more than 15 cm thick including cost and conveyance of materials to site and all other labour charges including consolidation as per standard specification
Provision for name board
Construction of Bathing Ghate at kavalkaradu oorani koduvilarpatty pt
Earth work excavation for foundation in all soils and sub-soils to full depth as may be directed except in hard rock requiring blasting but inclusive of shoring, strutting and bailing out water wherever necessary and refilling the sides of foundation with excavated earth in layers of not more than 15 cm thick well rammed and consolidate and depositing the surplus earth in all places shown by the departmental officers with initial lead and lift etc., complying with standard specification asperSS20 B.
Plain Cement Concrete 1:4:8 using 40 mm HBG metal for basement and flooring layers not more than 15 cm thick including cost and conveyance of materials to site and all other labour charges including consolidation as per standard specification
Centering shuttering including necessary support for plane surface in Foundation and Basement and in all floors using mild steel sheets of size 90x60 cm and 10 gauge stiffened, welded with steel angles of size 25mmx25mm x3mm for boarding laid over silver oak (country wood) joints of 10cm size x6.5cm size spaced at about 90 cm center to center and supported casuarina props of 10 cm to 13 cm dia spaced at 75 cm center to center complete complying with standard specification.
Plain Cement Concrete 1:3:6 using 40 mm HBG metal for basement and flooring layers not more than 15 cm thick including cost and conveyance of materials to site and all other labour charges including consolidation as per standard specification
Provision for name board
Construction of Bathing Ghate at Perumal kovil kanmai thappukundu pt
Earth work excavation for foundation in all soils and sub-soils to full depth as may be directed except in hard rock requiring blasting but inclusive of shoring, strutting and bailing out water wherever necessary and refilling the sides of foundation with excavated earth in layers of not more than 15 cm thick well rammed and consolidate and depositing the surplus earth in all places shown by the departmental officers with initial lead and lift etc., complying with standard specification asperSS20 B.
Plain Cement Concrete 1:4:8 using 40 mm HBG metal for basement and flooring layers not more than 15 cm thick including cost and conveyance of materials to site and all other labour charges including consolidation as per standard specification
Centering shuttering including necessary support for plane surface in Foundation and Basement and in all floors using mild steel sheets of size 90x60 cm and 10 gauge stiffened, welded with steel angles of size 25mmx25mm x3mm for boarding laid over silver oak (country wood) joints of 10cm size x6.5cm size spaced at about 90 cm center to center and supported casuarina props of 10 cm to 13 cm dia spaced at 75 cm center to center complete complying with standard specification.
Plain Cement Concrete 1:3:6 using 40 mm HBG metal for basement and flooring layers not more than 15 cm thick including cost and conveyance of materials to site and all other labour charges including consolidation as per standard specification
Provision for name board
Construction of Bathing Ghate at Arasamarathu oorani thappukundu pt
Earth work excavation for foundation in all soils and sub-soils to full depth as may be directed except in hard rock requiring blasting but inclusive of shoring, strutting and bailing out water wherever necessary and refilling the sides of foundation with excavated earth in layers of not more than 15 cm thick well rammed and consolidate and depositing the surplus earth in all places shown by the departmental officers with initial lead and lift etc., complying with standard specification asperSS20 B.
Plain Cement Concrete 1:4:8 using 40 mm HBG metal for basement and flooring layers not more than 15 cm thick including cost and conveyance of materials to site and all other labour charges including consolidation as per standard specification
Centering shuttering including necessary support for plane surface in Foundation and Basement and in all floors using mild steel sheets of size 90x60 cm and 10 gauge stiffened, welded with steel angles of size 25mmx25mm x3mm for boarding laid over silver oak (country wood) joints of 10cm size x6.5cm size spaced at about 90 cm center to center and supported casuarina props of 10 cm to 13 cm dia spaced at 75 cm center to center complete complying with standard specification.
Plain Cement Concrete 1:3:6 using 40 mm HBG metal for basement and flooring layers not more than 15 cm thick including cost and conveyance of materials to site and all other labour charges including consolidation as per standard specification
Provision for name board
Construction of Bathing Ghate at Nilaviyal oorani thadicheri pt
Earth work excavation for foundation in all soils and sub-soils to full depth as may be directed except in hard rock requiring blasting but inclusive of shoring, strutting and bailing out water wherever necessary and refilling the sides of foundation with excavated earth in layers of not more than 15 cm thick well rammed and consolidate and depositing the surplus earth in all places shown by the departmental officers with initial lead and lift etc., complying with standard specification asperSS20 B.
Plain Cement Concrete 1:4:8 using 40 mm HBG metal for basement and flooring layers not more than 15 cm thick including cost and conveyance of materials to site and all other labour charges including consolidation as per standard specification
Centering shuttering including necessary support for plane surface in Foundation and Basement and in all floors using mild steel sheets of size 90x60 cm and 10 gauge stiffened, welded with steel angles of size 25mmx25mm x3mm for boarding laid over silver oak (country wood) joints of 10cm size x6.5cm size spaced at about 90 cm center to center and supported casuarina props of 10 cm to 13 cm dia spaced at 75 cm center to center complete complying with standard specification.
Plain Cement Concrete 1:3:6 using 40 mm HBG metal for basement and flooring layers not more than 15 cm thick including cost and conveyance of materials to site and all other labour charges including consolidation as per standard specification
Provision for name board
Construction of Bathing Ghate at Dharmathu oorani thadicheri pt
Earth work excavation for foundation in all soils and sub-soils to full depth as may be directed except in hard rock requiring blasting but inclusive of shoring, strutting and bailing out water wherever necessary and refilling the sides of foundation with excavated earth in layers of not more than 15 cm thick well rammed and consolidate and depositing the surplus earth in all places shown by the departmental officers with initial lead and lift etc., complying with standard specification asperSS20 B.
Plain Cement Concrete 1:4:8 using 40 mm HBG metal for basement and flooring layers not more than 15 cm thick including cost and conveyance of materials to site and all other labour charges including consolidation as per standard specification
Centering shuttering including necessary support for plane surface in Foundation and Basement and in all floors using mild steel sheets of size 90x60 cm and 10 gauge stiffened, welded with steel angles of size 25mmx25mm x3mm for boarding laid over silver oak (country wood) joints of 10cm size x6.5cm size spaced at about 90 cm center to center and supported casuarina props of 10 cm to 13 cm dia spaced at 75 cm center to center complete complying with standard specification.
Plain Cement Concrete 1:3:6 using 40 mm HBG metal for basement and flooring layers not more than 15 cm thick including cost and conveyance of materials to site and all other labour charges including consolidation as per standard specification
Provision for name board
GST Amount for providing Service to Government Contract Works for the above Construction Works. { GST Amount is the Total GST Amount for total overall quoted amount above this row in column "BB" for all works in this package}
M.Muthuramalingam
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .