Loading…
Loading…
Tender Value
₹2.3 L
EMD Value
₹4,647
Closing Date
1 Sept 2026, 3:00 pmDue tomorrow
EXECUTIVE ENGINEER
EMD-6 DDA SEED BED PARK SHAKARPUR DELHI-92
D/O Sanjay Lake (Ph.-II) i/c Eco-restoration Plan at Mayur Vihar, Ph.-II.SH-Repair and maintenance of treated effluent water supply line already laid from Vasundhra Enclave to Sanjay lake for supply of treated effluent STP Water.
2026_DDA_923335_1
21/EE/EMD-6/DDA/2026-27
Open Tender
Civil Works
Percentage
365 days
EMD-6 DDA SEED BED PARK SHAKARPUR DELHI-92
Please refer Tender documents.
12 documents required · 12 mandatory
₹0
₹4,647
22 Aug 2026
22 Aug 2026
2 Sept 2026
22 Aug 2026
1 Sept 2026
22 Aug 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Demolishing cement concrete manually/ by mechanical means including disposal of material within 50 metres lead as per direction of Engineer - in - charge.
a) Nominal concrete 1:3:6 or richer mix (i/c equivalent design mix). | 6.8 | Cum. | 2,434.25 | ₹16,552.9 |
| 2 | Demolishing brick work manually/ by mechanical means including stacking of serviceable material and disposal of unserviceable material within 50 metres lead as per direction of Engineer-in-charge. a) In cement mortar | 0.5 | cum | 2,060.2 | ₹1,030.1 |
| 3 | Earth work in excavation by mechanical means (Hydraulic excavator) / manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan), including dressing of sides and ramming of bottoms, lift upto 1.5 m, including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50 m.
a) All kinds of soil. | 62 | cum | 260.3 | ₹16,138.6 |
| 4 | Cutting road and making good the same including supply of extra quantities of materials i.e. aggregate, moorum screening, red bajri and labour required.
a) Bituminous portion. | 3.6 | Cum. | 5,032.25 | ₹18,116.1 |
| 5 | Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level a) 1:2:4 (1 cement : 2 coarse sand (zone-III) including manufactured sand derived from Recycled Concrete Aggregate (RCA) upto 25% : 4 graded stone aggregate 20 mm nominal size Recycled Concrete Aggregate (RCA) upto 25%) | 5 | cum | 7,654.85 | ₹38,274.25 |
| 6 | Providing and laying S&S C.I. Standard specials suitable for mechanical jointing as per IS : 13382 :
a) Up to 300 mm dia. | 0.5 | Qtl. | 13,764.35 | ₹6,882.18 |
| 7 | Providing and laying D.I. Specials of Class K - 12 suitable for mechanical jointing as per IS : 9523 :
a) Up to 600 mm dia. | 1.3 | Qtl. | 21,290.1 | ₹27,677.13 |
| 8 | Providing push-on-joints to Centrifugally (Spun) Cast Iron Pipes or Ductile Iron Pipes including testing of joints and the cost of rubber gasket :
a) 200 mm dia pipes. | 40 | Per Joint | 280.85 | ₹11,234 |
| 9 | Supply of ductile iron Class K-7 pipe conforming to IS:8329 a) 200mm dia. | 22 | Mtr. | 2,275.53 | ₹50,061.66 |
| 10Supply of labour (As and when required). | |||||
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.27 MB
BOQ_970283.xls
BOQ • 0.29 MB
td21.pdf
Tender Documents • 2.81 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at [email protected].