Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | FIRST₹16.4 LAccepted-AOC NO 68 ANJANEYA TEMPLE CROSS OPP M S RAMAIAH HOSPITAL NEW BEL ROAD BANGALORE 560 094 | BENGALURU URBAN | KARNATAKA | 560094 | FIRST | Accepted-AOC BEING LOWEST | |
| 2 | THIRD₹20.7 LRejected-Finance 606 80 FEET ROAD 7TH BLOCK 2ND PHASE BANASHANKARI 3RD STAGE BANGALORE 560 085 | BENGALURU URBAN | KARNATAKA | 560085 | THIRD | Rejected-Finance BEING NOT LOWEST | |
| 3 | SECOND₹1.2 CrRejected-Finance 39 SR LAYOUT MAIN ROAD NAL WING TUNNEL ROAD MURUGESH PALYA BANGALORE 560 017 | BENGALURU URBAN | KARNATAKA | 560017 | SECOND | Rejected-Finance BEING NOT LOWEST | |
| 4 | Rejected-Technical 42 A 9TH MAIN 1ST CROSS BTM LAYOUT IST STAGE BENGALURU KARNATAKA 560029 | BENGALURU URBAN | KARNATAKA | 560029 | - | Rejected-Technical NOT ADMITTED DUE TO REQUISITE DOCUMENT NOT SUBMITTED |
Tender Value
₹19.9 L
EMD Value
₹39,800
Closing Date
4 Nov 2021, 6:00 pmClosed
GE (AF) MARATHAHALLI
GE AF MARATHAHALLI WIND TUNNEL ROAD, KEMPAPURA, YEMALUR POST, BANGALORE. PIN- 560037
COMPREHENSIVE MAINTENANCE OF UPS SYSTEM AND SERVO VOLTAGE STABILISERS AT VARIOUS LOCATIONS UNDER GE AF MARATHAHALLI BANGALORE
2021_MES_480585_1
8908/E8
Open Tender
Electrical and Maintenance Works
Item Rate
365 days
GE (AF) MARATHAHALLI
AS PER ENIT
7 documents required · 7 mandatory
₹500
GE (AF) MARATHAHALLI
₹39,800
Yes
4 Mar 2022
8 Oct 2021
9 Nov 2021
8 Oct 2021
4 Nov 2021
22 Oct 2021
Amount
Comprehensive maintenance of UPS 3 KVA (03 Nos) any make at various locations with complete calibration of systems, including all parameter as per manufacurer design servicing rectification of defects replacement of required parts etc servicing carried in a three months all as directed . Note :- (i) The report shall be submit to the Engr-in-Charge duly signed by the users. (ii) The complaint should be attended with in 04 to 06 hrs after giving the complaint by Mobile. (iii) The Battery will be measured and paid seperately. (iv) The rate inclusive of all defects parts. Note : (i) 03 Nos UPS of 03 KVA will be measured as one job.
Comprehensive maintenance of UPS 4 to 5 KVA (01 No) any make at various locations with complete calibration of systems, including all parameter as per manufacurer design servicing rectification of defects replacement of required parts etc servicing carried in a three months all as directed. Note :- (i) The service report shall be submit to the Engr-in-Charge duly signed by the users. (ii) The complaint should be attended with in 04 to 06 hrs after giving the complaint by Mobile. (iii) The Battery will be measured and paid seperately. (iv) The rate inclusive of all defects parts.
Comprehensive maintenance of UPS 6 to 8 KVA (01 No) any make at various locations with complete calibration of systems, including all parameter as per manufacurer design servicing rectification of defects replacement of required parts etc servicing carried in a three months all as directed . Note :- (i) The service report shall be submit to the Engr-in-Charge duly signed by the users. (ii) The complaint should be attended with in 04 to 06 hrs after giving the complaint by Mobile. (iii) The Battery will be measured and paid seperately. (iv) The rate inclusive of all defects parts.
Comprehensive maintenance of UPS 10 KVA (04 Nos) any make at various location with complete calibration of systems, including all parameter as per manufacurer design servicing rectification of defects replacement of required parts etc servicing carried in a three months all as directed . Note :- (i) The service report shall be submit to the Engr-in-Charge duly signed by the users. (ii) The complaint should be attended with in 04 to 06 hrs after giving the complaint by Mobile. (iii) The Battery will be measured and paid seperately. (iv) The rate inclusive of all defects parts. Note : (i) 04 Nos UPS of 10 KVA will be measured as one job.
Comprehensive maintenance of UPS 15 KVA (01 No) any make at various location with complete calibration of systems, including all parameter as per manufacurer design servicing rectification of defects replacement of required parts etc servicing carried in a three months all as directed . Note :- (i) The service report shall be submit to the Engr-in-Charge duly signed (ii) The complaint should be attended with in 04 to 06 hrs after giving the complaint by Mobile. (iii) The Battery will be measured and paid seperately. (iv) The rate inclusive of all defects parts.
Comprehensive maintenance of UPS 20 KVA (02 Nos) any make at various locations with complete calibration of systems, including all parameter as per manufacurer design servicing rectification of defects replacement of required parts etc servicing carried in a three months all as directed by . Note :- (i) The service report shall be submit to the Engr-in-Charge duly signed by the users. (ii) The complaint should be attended with in 04 to 06 hrs after giving the complaint by Mobile. (iii) The Battery will be measured and paid seperately. (iv) The rate inclusive of all defects parts. Note : (i) 02 Nos UPS of 20 KVA will be measured as one job.
Comprehensive maintenance of UPS 30 KVA (02 No) any make at various locations with complete calibration of systems, including all parameter as per manufacurer design servicing rectification of defects replacement of required parts etc servicing carried in a three months all as directed . Note :- (i) Theservice report shall be submit to the Engr-in-Charge duly signed (ii) The complaint should be attended with in 04 to 06 hrs after giving the complaint by Mobile. (iii) The Battery will be measured and paid seperately. (iv) The rate inclusive of all defects parts. Note : (i) 02 Nos UPS of 30 KVA will be measured as one job.
Comprehensive maintenance of UPS 60 KVA (01 No) any make at various locations with complete calibration of systems, including all parameter as per manufacurer design servicing rectification of defects replacement of required parts etc servicing carried in a three months all as directed . Note :- (i) The quarterly service report shall be submit to the Engr-in-Charge duly signed (ii) The complaint should be attended with in 04 to 06 hrs after giving the complaint by Mobile. (iii) The Battery will be measured and paid seperately. (iv) The rate inclusive of all defects parts.
Comprehensive maintenance of UPS 80 KVA (01 No) any make at various locations with complete calibration of systems, including all parameter as per manufacurer design servicing rectification of defects replacement of required parts etc servicing carried in a three months all as directed . Note :- (i) The service report shall be submit to the Engr-in-Charge duly signed (ii) The complaint should be attended with in 04 to 06 hrs after giving the complaint by Mobile. (iii) The Battery will be measured and paid seperately. (iv) The rate inclusive of all defects parts.
Repair and maintenance of servo voltage stabilizer oil cooled/Air cooled 1 KVA to 15 KVA any make at various locations with complete calibration of systems, including all parameter as per manufacturer design servicing rectification of defects replacement of required parts etc the parts measured in relevant schedule are in servicing three months all as directed . Note : (i) The service report shall be submit to Engr-in-Charge duly signed. (ii) Parts to be measured and paid seperately.
Repair and maintenance of servo voltage stabilizer oil cooled/air cooled 16 KVA to 50 KVA any make at various locations with complete calibration of systems, including all parameter as per manufacturer design servicing rectification of defects replacement of required parts etc the parts measured in relevant schedule are in servicing three months all as directed . Note : (i) The service report shall be submit to Engr-in-Charge duly signed. (ii) Parts to be measured and paid seperately.
Repair and maintenance of servo voltage stabilizer oil cooled/air cooled 55 KVA to 100 KVA any make at various locations with complete calibration of systems, including all parameter as per manufacturer design servicing rectification of defects replacement of required parts etc the parts measured in relevant schedule are in servicing three months all as directed . Note : (i) The service report shall be submit to Engr-in-Charge duly signed. (ii) Parts to be measured and paid seperately.
Repair and maintenance of servo voltage stabilizer oil cooled/air cooled 100 KVA to 500 KVA any make at various locationswith complete calibration of systems, including all parameter as per manufacturer design servicing rectification of defects replacement of required parts etc the parts measured in relevant schedule are in servicing three months all as directed . Note : (i) The service report shall be submit to Engr-in-Charge duly signed. (ii) Parts to be measured and paid seperately.
Ref above Sl item No 1 to 13 Auto transformer of any capacity complete all as specified and as directed. (a) Auto Transformer 2 /4/6/8/10 Amps
All as per item 14 above,but, (b) Auto Transformer 12/15/18/20 Amps complete all as specified and as directed.
All as per item 14 above,but, (c) Auto Transformer 23/28 Amps complete all as specified and as directed.
All as per item 14 above,but,(d) Auto Transformer 32/35 Amps complete all as specified and as directed.
Ref above sl item No 1 to 13 Buck Boost Transformer of any capacity complete all as specified and as directed. (a) Book Boost Tx 2/4/6/8/10 Amps
All as per item 18 above,but, (b) Book Boost Transformer 12/15/18/20 Amps complete all as specified and as directed.
All as per item 18 above,but , (c) Book Boost Transformer 23/28 Amps complete all as specified and as directed.
All as per item 18 above,but , (d) Book Boost Transformer 35/45 Amps complete all as specified and as directed.
All as per item 18 above,but, (e) ''Buck boost transformer 60/100 Amps " complete all as specified and as directed.
Ref above Sl item No 1 TO 13 Control transformer of any capacity (a) Control transformer PS Sensing Tx complete all as specified and as directed.
All as per item 23 above, but , (b) Control transformer Ph Re Sensing 3 Ph Tx complete all as specified and as directed.
All as per item 23 above, but, (c) Control Transformer DPS Sensing Tx (each) complete all as specified and as directed.
All as per item 23 above, but, (d) Control Transformer DC Motor sensing Tx complete all as specified and as directed.
Ref above Sl item No 1 TO 13 Meters of any capacity (a) 0-300 v local 72 Sqmm complete all as specified and as directed.
All as per item 27 above, but,(b) 0-500 v local 96 sqmm complete all as specified and as directed.
All as per item 27 above, but,(c) 0-300 Voltmeter AE 72 Sqmm complete all as specified and as directed.
All as per item 27 above, but,(d) 0-500 Voltmeter AE 96 Sqmm complete all as specified and as directed.
All as per item 27 above, but,(e) DPM Volt & Amp Meter complete all as specified and as directed.
All as per item 27 above, but, (f) CT Coils complete all as specified and as directed.
Ref above Sl item No 1 TO 13 Carbon Brushes of any capacity (a) Carbon Brush upto 30k/75k
All as per item 33 above, but, (b) Carbon Brush upto 200k complete all as specified and as directed.
Ref above Sl item No 1 to 13PCBs of any capacity complete all as specified and as directed. (a) 2K2R & 2K5R PCB
All as per item 35 above, but, (b) SCVS2 PCB complete all as specified and as directed.
All as per item 35 above, but, (c) DGDPS Control PCB complete all as specified and as directed.
All as per item 35 above, but, (d) Phase reversal PCB complete all as specified and as directed.
All as per item 35 above, but, (e) E Over load PCB complete all as specified and as directed.
All as per item 35 above, but, (f) DC Motor control PCB complete all as specified and as directed.
All as per item 35 above, but, (g) 3 Phase cutoff PCB complete all as specified and as directed.
All as per item 35 above, but, (h) 3mm LED strip 5 lights complete all as specified and as directed.
All as per item 35 above, but, (j) 2K2/2K5 Control PCB complete all as specified and as directed.
All as per item 35 above, but, (k) 5/ 10 mm LED strip complete all as specified and as directed.
All as per item 35 above, but, (l) DPS LED PCBS complete all as specified and as directed.
All as per item 35 above, but, (m) 2K6R New control PCB complete all as specified and as directed.
All as per item 35 above, but, (n) LED Strips complete all as specified and as directed.
Ref above Sl item No 1 TO 13 Motors (DC & AC) of any capacity complete all as specified and as directed. (a) 12V DC Motor Big
All as per item 48 above, but, (b) 3Kg Stepper Motor complete all as specified and as directed.
All as per item 48 above, but, (c) 10 Kg Stepper Motor complete all as specified and as directed.
All as per item 48 above, but, (d) 3Kg/10 kg RC Network complete all as specified and as directed.
Ref above Sl item No 1to 13 Control switches of any capacity complete all as specified and as directed. (a) SPST Switch (I&D)
All as per item 52 above, but,(b) DPDT Switch (A.M) complete all as specified and as directed.
All as per item 52 above, but, (c) Spring loaded switch complete all as specified and as directed.
All as per item 52 above, but, (d) Salzer switch (A&V) complete all as specified and as directed.
All as per item 52 above, but,(e) Pot meter 1K Ohms complete all as specified and as directed.
All as per item 52 above, but, (f) Surg/Spike Sentry Box complete all as specified and as directed.
Ref above Sl item No 1 to 13 Coupling gears of any capacity complete all as specified and as directed. (a) Main gear upto 30/75/80 kva
All as per item 58 above, but, (b) Pinon Gears (8 & 10mm) complete all as specified and as directed.
Ref above Sl item No 12 to 15 Electricity Components of any capacity complete all as specified and as directed. (a) BT-136 TRAIC
All as per item 60 above, but, (b) IC 741 & 555 BEL complete all as specified and as directed.
Ref above Sl item No 1 to 13 Connectors of any capacity (a) 8 way Blank type complete all as specified and as directed.
All as per item 62 above, but, (b) 22 pin Edge connectors complete all as specified and as directed.
All as per item 62 above, but, (c) PCB connector complete all as specified and as directed.
All as per item 62 above, but, (d) 4 way connector complete all as specified and as directed.
Taking out the sample of isolation transformer oil from bottom of each items installed at various locations for checking die elecric strength & acidity test of oil and carrying out dehydration (Filtration) of cooling/ insulating oil of LT switch gears through straight line oil filtration plant for removing carbon deposit, extracting moisture content etc. After filtration, the oil shall withstand 40 KV for one minute die electric strength. Die elecric strength & acidity to be tested before and after filtration and submit the test results all as specified.
Supply only insulating /cooling oil suitable for isolation transformers / switch gear etc having die electric strength of more than 40 KV for filling / topping up complete all as specified and as directed.
Taking down electrical chimney filter for cleaning and reassembling complete including testing and commissioning to the entire satisfaction complete all as specified and as directed.
Material only for battery 42 AH alongwith necessary suitable fitting complete all as specified and as directed.
Material only for battery 26 AH alongwith necessary suitable fitting complete all as specified and as directed.
Material only for battery 75 AH alongwith necessary suitable fitting complete all as specified and as directed.
Material only for battery 65 AH alongwith necessary suitable fitting complete all as specified and as directed.
Repair and maint of isolation transformer upto 250 KVA drain out old oil and after filtration the oil and checking the winding of transformer and refilling the same after rectified the problem and change the parts complete all as specified and as directed.
GKR and CO
Lucky Enterprises
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .