| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹12.3 LAccepted-AOC | ₹12.3 L | L1 | Accepted-AOC L1 |
| 2 | L2₹14.0 LRejected-AOC NEHRU NAGAR DHARMAPURI | DHARMAPURI | TAMIL NADU | 635106 | ₹14.0 L | L2 | Rejected-AOC L2 |
| Sl No | Description | Qty | Unit | Sri Sanjana Constructions L1 | CHINNAMUTHU CONTRACTORS L2 |
|---|---|---|---|---|---|
| 1.00Rejuvenation of Kuppangarai eri H/o.Kalappanahalli | |||||
| 2.00 | Clearing the Scrub jungle (based on standard schedule of rates Annexure III Vid., S.No.W003) | 21,911 | Sqm | 6.36 ₹1.4 L | 8 ₹1.8 L |
| 3.00 | Earth work in all soils except hard rock requiring blasting and conveying for formation of bund with lead of 0 to 100 metre deploying earth moving machinery and tippers including benching, formation of bunds, breaking clods, sectioning etc., complete | 6,605 | Cum | 63.35 ₹4.2 L | 70 ₹4.6 L |
| 4.00 | Add to relevant T.N.D.S,S. N0 20.A, rates for new tank bands and Closing breaches for extra watering and consolidation By Power roller (W0070) | 1,559 | Cum | 45.85 ₹71,480.15 | 50 ₹77,950 |
| 5.00 | Earth work deploying earth moving machinery for desilting channel and forming bund on either side and depositing the earth on banks including jungle clearance etc complete.having width of 3m -10m(W0088) | 375 | Cum | 45.8 ₹17,175 | 50 ₹18,750 |
| 6.00 | Providing Boundry Stone | 22 | Nos. | 1,107 ₹24,354 | 1,150 ₹25,300 |
| 7.00 | Provision for Name Board | 1 | Nos. | 3,000 ₹3,000 | 8,000 ₹8,000 |
| 8.00Rejuvenation of Bethankuttai Eri H/o.Begarahalli | |||||
| 9.00 | Clearing the Scrub jungle (based on standard schedule of rates Annexure III Vid., S.No.W003) | 13,611 | Sqm | 6.36 ₹86,565.96 | 8 ₹1.1 L |
| 10.00 | Earth work in all soils except hard rock requiring blasting and conveying for formation of bund with lead of 0 to 100 metre deploying earth moving machinery and tippers including benching, formation of bunds, breaking clods, sectioning etc., complete | 3,800 | Cum | 63.35 ₹2.4 L | 70 ₹2.7 L |
Tender Value
₹13.1 L
EMD Value
₹14,000
Closing Date
16 Sept 2025, 3:00 pmClosed
The Joint Director/ Project Director
DRDA, Dharmapuri
1.Rejuvenation of Kuppangarai eri H/o.Kalappanahalli 2.Rejuvenation of Bethankuttai Eri H/o.Begarahalli
2025_RDTN_598512_1
Roc.No.3191/2024/R10 MI Tank P32
Open Tender
Civil Works
120 days
DRDA
Can be seen in the tender documents
2 documents required · 2 mandatory
₹0
₹14,000
Yes
DRDA, Dharmapuri
29 Dec 2025
29 Aug 2025
16 Sept 2025
29 Aug 2025
16 Sept 2025
3 Sept 2025
3 Sept 2025
Amount
Rejuvenation of Kuppangarai eri H/o.Kalappanahalli
Clearing the Scrub jungle (based on standard schedule of rates Annexure III Vid., S.No.W003)
Earth work in all soils except hard rock requiring blasting and conveying for formation of bund with lead of 0 to 100 metre deploying earth moving machinery and tippers including benching, formation of bunds, breaking clods, sectioning etc., complete
Add to relevant T.N.D.S,S. N0 20.A, rates for new tank bands and Closing breaches for extra watering and consolidation By Power roller (W0070)
Earth work deploying earth moving machinery for desilting channel and forming bund on either side and depositing the earth on banks including jungle clearance etc complete.having width of 3m -10m(W0088)
Providing Boundry Stone
Provision for Name Board
Rejuvenation of Bethankuttai Eri H/o.Begarahalli
Clearing the Scrub jungle (based on standard schedule of rates Annexure III Vid., S.No.W003)
Earth work in all soils except hard rock requiring blasting and conveying for formation of bund with lead of 0 to 100 metre deploying earth moving machinery and tippers including benching, formation of bunds, breaking clods, sectioning etc., complete
Add to relevant T.N.D.S,S. N0 20.A, rates for new tank bands and Closing breaches for extra watering and consolidation By Power roller (W0070)
Earth work deploying earth moving machinery for desilting channel and forming bund on either side and depositing the earth on banks including jungle clearance etc complete.having width of 3m -10m(W0088)
Providing Boundry Stone
Provision for Name Board
GST Amount for providing Service to Government Contract Works for the above Construction Works. { GST Amount is the Total GST Amount for total overall quoted amount above this row in column "BB" for all works in this package}
CHINNAMUTHU CONTRACTORS (BID ID -1457135)
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx