Loading…
Loading…
| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹8.2 LAdmitted-Finance | L1 | Admitted-Finance | ||
| 2 | L2₹8.4 L+₹16,924.30 (2.07%)Admitted-Finance | L2 | Admitted-Finance | ||
| 3 | L3₹8.4 L+₹19,039.84 (2.33%)Admitted-Finance | L3 | Admitted-Finance | ||
| 4 | Rejected-Technical | - | Rejected-Technical ok |
Tender Value
₹8.5 L
EMD Value
₹84,622
Closing Date
6 Mar 2026, 12:00 pmClosed
CHIEF ENGINEER
NAGAR NIGAM AGRA
ha Mandi Zone Cell No. 21 Construction of drain and CC flooring from Monu house in Barah Khambha to Azad house via Guddu house.
2026_DOLBU_1117715_1
12-02-2026/NAGAR NIGAM AGRA/06-03-2026/58
Open Tender
Construction Works
Percentage
90 days
AGRA
Please refer Tender documents.
2 documents required · 2 mandatory
₹590
NAGAR NIGAM
₹84,622
16 Mar 2026
23 Feb 2026
6 Mar 2026
23 Feb 2026
6 Mar 2026
23 Feb 2026
Earth work in Filling in ordinary soil (loam, clay or sand) including, lift up to 1.50 m and lead up to 30m and including filling watering and ramming of oxcavated the building and the sides of foundation trenches or into the plinth and removal and disposal of surplus earth as directed by the engineer-in-charge up to a distance of 8km. form the foundation trenches including royalty@ 9.00 per cum. (Chapter No.4 PWD.SCH.-253(a)+ CPTR No. 3 1 to 8 Km.)
Dismantling of stone flagged or interlocking tiled floor including stacking of material as directed by E/IC within distance of 60 meters. (SI No. 697)
Cartage of ballast, Kankar, Coat, Grit or sand etc. including loading and unloading but excluding stacking on pucca roads.up to 8 Km distance
Providing and laying cement concrete in 1:5:10 (1 cement : 5 coarse sand : 10 graded stone aggregate 40 mm nominal size) and curing complete, including cost of form work in foundation and floors. (DSR SN-4.1.10)
Class-150 (Non Modular) brick work in 1:4 cement and Coarse sand mortar in foundation and plinth including supply of all material, labor T&P etc. required for proper completion of work. (S.No. 6.1.1)
12mm thick cement plaster in single coat of fair side of single of half brick wall for interior plastering up to floor two level including internal rounded angles chamfers and rounded angles not excluding 80mm in girth and finished even and smooth. No extra for mixing any additive. (c) 1 cement : 4 Coarse sand. (Chapter No. 13 S.I. No.-582(ii))
Providing and laying cement concrete in 1:2:4 (1 cement : 2 coarse sand : 4 graded stone aggregate 20 mm nominal size) and curing complete, including cost of form work in foundation and floors. (DSR SN-4.1.3)
R.C.C. work Providing and laying in position specified grade of renforced cement concrete, including the cost of centering, shuttering, finishing and excluding reinforcement. All work up to plinth level : 1:2:4 (1 cement : 2 coarse sand : 4 graded stone aggregate 20 mm nominal size) (S.I. No. 5.1.3)
mild steel or iron in plain work such as reinforced concrete or reinforced brick work
Raising & re-fixing of manhole including all material labor T&P etc. all complete. (NS)
Supply & fixing of R.C.C. manhole frame and cover including all complete. (NS)
Supply & Fixing Granite Board 2.5"x4" Size Display Board including Painting, Lettering etc. all complete. (None Schedule)
Sub Total (A)
Add / Deduction For Estimate Figure Amount Match
Grand Total
stage.html
html • 0.03 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 8.45 MB
BOQ_2081389.xls
BOQ • 0.29 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .