| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹37.4 LAdmitted-Finance | ₹37.4 L | L1 | Admitted-Finance |
| 2 | L2₹41.2 L+₹3.8 L (10.1%)Admitted-Finance ZIRAKPUR PUNJAB | S A S NAGAR | PUNJAB | 140103 | ₹41.2 L+₹3.8 L (10.1%) | L2 | Admitted-Finance |
| 3 | L3₹44.6 L+₹7.2 L (19.4%)Admitted-Finance H NO 312 B D C OPP PLOT NO 23 TRANSPORT AREA SECTOR 26 CHANDIGARH | CHANDIGARH | CHANDIGARH | CHANDIGARH | ₹44.6 L+₹7.2 L (19.4%) | L3 | Admitted-Finance |
| 4 | L4₹45.0 L+₹7.6 L (20.4%)Admitted-Finance HOUSE NO 172 A CANAL ROAD SUJANPUR TEH DISTT PATHANKOT 145001 PUNJAB | PATHANKOT | PUNJAB | 145001 | ₹45.0 L+₹7.6 L (20.4%) | L4 | Admitted-Finance |
| Sl No | Description | Qty | Unit | SS BUILDERS L2 | OJHA ENTERPRISES L3 | M/S SATYA SAI CONSTRUCTION L4 | Ms OK ENTERPRISES L1 |
|---|---|---|---|---|---|---|---|
| 1.00 | Taking down eaves gutters and rain water pipes (any size or pattern), including all fittings, heads, shoes, bends, swan-necks, etc., and removal from site complete all as specified and directed by Engineer-in-Charge. | 300 | RUNNING METRE | 50 ₹15,000 | 30 ₹9,000 | 111 ₹33,300 | 20 ₹6,000 Lowest |
| 2.00 | Taking down steel tubing and connections of 15 mm bore in pipe with all fittings from walls,ceilings and floors and removal from site complete all as specified and directed by Engineer-in-Charge. | 110 | RUNNING METRE | 20 ₹2,200 Lowest | 30 ₹3,300 | 111 ₹12,210 | 50 ₹5,500 |
| 3.00 | Taking down steel tubing and connections of 20 mm bore in pipe with all fittings from walls,ceilings and floors and removal from site complete all as specified and directed by Engineer-in-Charge. . | 80 | RUNNING METRE | 25 ₹2,000 Lowest | 40 ₹3,200 | 111 ₹8,880 | 60 ₹4,800 |
| 4.00 | Taking down Cement plaster or cement lime plaster on brick or stone walls including raking out joints, hacking for key & scrubbing down with water etc including disposal of unservicable rubbish outside Cantt area all as specified and directed by Engineer-in-Charge. | 1,000 | SQUARE METRE | 25 ₹25,000 | 30 ₹30,000 | 55 ₹55,000 | 20 ₹20,000 Lowest |
| 5.00 | Demolition of brick work or stone/boulder masonary built in cement mortar incl all quions arches, pillar or any other descrption etc complete including disposal of unserviceable rubbish outside cantt area all as specified and directed by Engineer-in-Charge. | 5 | CUBIC METRE | 400 ₹2,000 | 300 ₹1,500 Lowest | 555 ₹2,775 | 500 ₹2,500 |
| 6.00 | Demolition of cement concrete (reinforced) (reinforcement cut as required to facilitate demolition) as in roofs, floors (other than ground floors) beams, slabs, staircases, landing, chajjas and similar suspended work complete at any height including disposal of unservicable rubbish outside Cantt area all as specified and directed by Engineer-in-Charge. | 1 | CUBIC METRE | 600 ₹600 | 400 ₹400 Lowest | 555 ₹555 | 500 ₹500 |
| 7.00 | Dismantling floor, hearth or wall tiling including cement mortar bedding including disposal of unservicable rubbish outside Cantt area all as specified and directed by Engineer-in-Charge. | 186 | SQUARE METRE | 30 ₹5,580 Lowest | 30 ₹5,580 Lowest | 33 ₹6,138 | 30 ₹5,580 Lowest |
| 8.00 | Dismantling Stone slabs and tiles of any description or thickness in floors, aprons etc, complete including disposal of unservicable rubbish outside Cantt area all as specified and directed by Engineer-in-Charge. | 1 | 10 SQUARE METRE | 400 ₹400 | 300 ₹300 Lowest | 555 ₹555 | 300 ₹300 Lowest |
| 9.00 | Demolition of lime/Cement concrete unreinforced as in Ground Floor and paving exc. 15cm thick (above or below G.L.) complete including china mozaic,WC ,disposal of unservicable rubbish outside Cantt area all as specified and directed by Engineer-in-Charge. | 2 | CUBIC METRE | 400 ₹800 Lowest | 400 ₹800 Lowest | 555 ₹1,110 | 500 ₹1,000 |
| 10.00 | Dismanting of wrought iron or mild steel of any description not otherwise provided for in any location and any position complete including disposal of unservicable rubbish outside Cantt area all as specified and directed by Engineer-in-Charge. | 5.5 | QUINTAL | 200 ₹1,100 | 100 ₹550 | 444 ₹2,442 | 40 ₹220 Lowest |
Tender Value
₹40 L
EMD Value
₹80,000
Closing Date
13 Aug 2026, 6:00 pmClosed
GE CHANDIGARH
GE CHANDIGARH N AREA OLD AIRPORT CHOWK CHANDIGARH 160003
MISC B / R REPAIR AND PERIODICAL SERVICES OF CERTAIN ACCN AT K AREA UNDER GE CHANDIGARH
2026_MES_779296_1
GE/CHD/T-39/2026-27
Open Tender
Civil Works
Item Rate
180 days
HALLOMAJRA
Please refer Tender documents.
8 documents required · 8 mandatory
₹500
GE CHANDIGARH
₹80,000
Yes
20 Aug 2026
17 Jul 2026
15 Aug 2026
17 Jul 2026
13 Aug 2026
1 Aug 2026
18 Jul 2026 - 25 Jul 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Taking down eaves gutters and rain water pipes (any size or pattern), including all fittings, heads, shoes, bends, swan-necks, etc., and removal from site complete all as specified and directed by Engineer-in-Charge. | 300 | RUNNING METRE | 100 | ₹30,000 |
| 2 | Taking down steel tubing and connections of 15 mm bore in pipe with all fittings from walls,ceilings and floors and removal from site complete all as specified and directed by Engineer-in-Charge. | 110 | RUNNING METRE | 100 | ₹11,000 |
| 3 | Taking down steel tubing and connections of 20 mm bore in pipe with all fittings from walls,ceilings and floors and removal from site complete all as specified and directed by Engineer-in-Charge. . | 80 | RUNNING METRE | 10 | ₹800 |
| 4 | Taking down Cement plaster or cement lime plaster on brick or stone walls including raking out joints, hacking for key & scrubbing down with water etc including disposal of unservicable rubbish outside Cantt area all as specified and directed by Engineer-in-Charge. | 1,000 | SQUARE METRE | 10 | ₹10,000 |
| 5 | Demolition of brick work or stone/boulder masonary built in cement mortar incl all quions arches, pillar or any other descrption etc complete including disposal of unserviceable rubbish outside cantt area all as specified and directed by Engineer-in-Charge. | 5 | CUBIC METRE | 10 | ₹50 |
| 6 | Demolition of cement concrete (reinforced) (reinforcement cut as required to facilitate demolition) as in roofs, floors (other than ground floors) beams, slabs, staircases, landing, chajjas and similar suspended work complete at any height including disposal of unservicable rubbish outside Cantt area all as specified and directed by Engineer-in-Charge. | 1 | CUBIC METRE | 10 | ₹10 |
| 7 | Dismantling floor, hearth or wall tiling including cement mortar bedding including disposal of unservicable rubbish outside Cantt area all as specified and directed by Engineer-in-Charge. | 186 | SQUARE METRE | 10 | ₹1,860 |
| 8 | Dismantling Stone slabs and tiles of any description or thickness in floors, aprons etc, complete including disposal of unservicable rubbish outside Cantt area all as specified and directed by Engineer-in-Charge. | 1 | 10 SQUARE METRE | 10 | ₹10 |
| 9 | Demolition of lime/Cement concrete unreinforced as in Ground Floor and paving exc. 15cm thick (above or below G.L.) complete including china mozaic,WC ,disposal of unservicable rubbish outside Cantt area all as specified and directed by Engineer-in-Charge. | 2 | CUBIC METRE | 10 | ₹20 |
| 10 | Dismanting of wrought iron or mild steel of any description not otherwise provided for in any location and any position complete including disposal of unservicable rubbish outside Cantt area all as specified and directed by Engineer-in-Charge. | 5.5 | QUINTAL | 10 | ₹55 |
stage.html
html • 0.03 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.37 MB
BOQ_872850.xls
BOQ • 9.73 MB
TENDER39.pdf
Tender Documents • 2.63 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .