| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹66.2 CrAccepted-AOC 614 HARIOM TOWER COMMERCIAL COMPLEX CIRCULAR ROAD LALPUR RANCHI JHARKHAND 834001 | RANCHI | JHARKHAND | 834001 | L1 | Accepted-AOC L1 Letter No. 2764(S)WE Date-31.05.2023 | |
| 2 | L2₹67.5 Cr+₹1.3 Cr (1.93%)Rejected-Finance 23 SAHID SURYA SEN ROAD BERHAMPORE MURSHIDABAD W B | MURSHIDABAD | WEST BENGAL | 700023 | L2 | Rejected-Finance L2 Letter No. 2664(S)WE Date-31.05.2023 | |
| 3 | Rejected-Technical | - | Rejected-Technical Non Responsive | |
| 4 | Rejected-Technical 3D VATIKA APARTMENT LINK TANK ROAD RANCHI | RANCHI | JHARKHAND | 829205 | - | Rejected-Technical Non Responsive | |
| 5 | Rejected-Technical | - | Rejected-Technical Non Responsive |
Tender Value
₹60.2 Cr
EMD Value
₹60.3 L
Closing Date
16 Dec 2022, 12:00 pmClosed
Executive Engineer, RCD, Road Division, Godda
Executive Engineer, RCD, Road Division, Godda
Reconstruction of Simra-Boarijore-Borio Road (MDR-208) from Km 4.00 to Km 17.150 including Bridge (Total Length- 13.150 Km) under Road Division, Godda for the year 2022-23
2022_CECOM_63334_1
RCD/GODDA/1257/2022-23
Open Tender
Civil Works - Roads
Item Rate
365 days
Opening point- At basdiha
Please refer Tender documents.
3 documents required · 3 mandatory
₹10,000
Executive Engineer, RCD, Road Division, Godda
₹60.3 L
Chief Eng. (Comm), RCD, Jharkhand, Ranchi
7 Jun 2023
24 Nov 2022
19 Dec 2022
24 Nov 2022
16 Dec 2022
2 Dec 2022
1 Dec 2022
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Clearing and grubbing road land including uprooting rank vegetation, grass, bushes, shrubs, saplings and trees girth up to 300 mm, removal of stumps of trees cut earlier and disposal of unserviceable materials and stacking of serviceable material to be used or auctioned up to a lead of 1000 metres including removal and disposal of top organic soil not exceeding 150 mm in thickness.
JH RCD SOR 2.03 (ii) A | 17.16 | Hect. | 1,45,584.2 | ₹24,98,224.87 |
| 2 | Dismantling of Structures (Dismantling of existing structures like culverts, bridges, retaining walls and other structure comprising of masonry, cement concrete, wood work, steel work, including T&P and scaffolding wherever necessary, sorting the dismantled material, disposal of unserviceable material and stacking the serviceable material with all lifts and lead of 1000 metres) Lime /Cement Concrete,By Mechanical Means Prestressed / Reinforced cement concrete grade M-20 & above
Vide JH RCD SOR 2.04 II B | 861 | M3 | 887 | ₹7,63,707 |
| 3 | Dismantling of Structures (Dismantling of existing structures like culverts, bridges, retaining walls and other structure comprising of masonry, cement concrete, wood work, steel work, including T&P and scaffolding wherever necessary, sorting the dismantled material, disposal of unserviceable material and stacking the serviceable material with all lifts and lead of 1000 metres) Lime /Cement Concrete,By Mechanical Means,Cement Concrete Grade M-15 & M-20
Vide JH RCD SOR 2.04(i) I B | 290.48 | M3 | 452.4 | ₹1,31,413.15 |
| 4 | Dismantling of Structures (Dismantling of existing structures like culverts, bridges, retaining walls and other structure comprising of masonry, cement concrete, wood work, steel work, including T&P and scaffolding wherever necessary, sorting the dismantled material, disposal of unserviceable material and stacking the serviceable material with all lifts and lead of 1000 metres) Dismantling Brick / Tile work,Rubble stone masonry in cement mortar.
Vide JH RCD SOR 2.04(iii) B | 2,922.74 | M3 | 286.3 | ₹8,36,780.46 |
| 5 | Dismantling of Structures (Dismantling of existing structures like culverts, bridges, retaining walls and other structure comprising of masonry, cement concrete, wood work, steel work, including T&P and scaffolding wherever necessary, sorting the dismantled material, disposal of unserviceable material and stacking the serviceable material with all lifts and lead of 1000 metres), Removing all type of hume pipes and stacking within a lead of 1000 metres including earthwork and dismantling of masonry works., Up to 900 mm dia
Vide JH RCD SOR 2.04(ix) C | 45 | M | 796 | ₹35,820 |
| 6 | Dismantling of Flexible Pavements (Dismantling of flexible pavements and disposal of dismantled materials up to a lead of 1000 metres, stacking serviceable and unserviceable materials separately), By Mechanical Means,Bituminous course
JH RCD SOR 2.05(II) A | 7,810.11 | M3 | 234 | ₹18,27,565.74 |
| 7 | Excavation in Soil using Hydraulic Excavator and Tippers with disposal upto 1000 metres. (Excavation for roadwork in soil with hydraulic excavator including cutting and loading in tippers, trimming bottom and side slopes, in accordance with requirements of lines, grades and cross sections, and transporting to the embankment location within all lifts and lead upto 1000m),
JH RCD SOR 3.06 | 1,88,464.8 | M3 | 62.4 | ₹1,17,60,203.52 |
| 8 | Construction of Embankment with Material Deposited from Roadway Cutting (Construction of embankment with approved materials deposited at site from roadway cutting and excavation from drain and foundation of other structures graded and compacted to meet requirement of table 300-2),Rolling with vibratory roller. Rate per cum after adding royalty@Rs 27.48/cum
JH RCD SOR 3.17 | 20,066.13 | M3 | 61.48 | ₹12,33,665.67 |
| 9 | Construction of Subgrade and Earthen Shoulders (Construction of subgrade and earthen shoulders with approved material obtained from borrow pits with all lifts & leads, transporting to site, spreading, grading to required slope and compacted to meet requirement of table No. 300-2)
JH RCD SOR 3.18 I | 25,799.12 | M3 | 131.3 | ₹33,87,424.46 |
| 10 | Construction of Subgrade With Stone Dust (Construction of subgrade and earthen shoulders with approved material (Stone Dust) obtained from borrow pits with all lifts & leads, transporting to site, spreading, grading to required slope and compacted to meet requirement of table No. 300-2) Stone Dust NS ITEM | 98,145.03 | M3 | 1,002.36 | ₹9,83,76,652.27 |
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
BOQ_85070.xls
BOQ Document • 0.29 MB
109513890.pdf
Tender Document • 0.22 MB
SBD.pdf
Tender Document • 1.96 MB
109513894.html
Tender Document • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .