| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹13.1 LAdmitted-Finance | -48.18% | ₹13.1 L | L1 | Admitted-Finance |
| 2 | L2₹14.5 L+₹1.4 L (10.9%)Admitted-Finance | -42.54% | ₹14.5 L+₹1.4 L (10.9%) | L2 | Admitted-Finance |
| 3 | L3₹14.9 L+₹1.8 L (13.9%)Admitted-Finance 21 JHAMRI 151 JHAMRI JHAMRI ROHTAK HARYANA 124142 UDYAM HR 07 0030314 | JHAJJAR | HARYANA | 124142 | -40.99% | ₹14.9 L+₹1.8 L (13.9%) | L3 | Admitted-Finance |
| 4 | L4₹15.7 L+₹2.6 L (20.1%)Admitted-Finance | -37.77% | ₹15.7 L+₹2.6 L (20.1%) | L4 | Admitted-Finance |
| 5 | L5₹18.7 L+₹5.6 L (42.8%)Admitted-Finance | -26.00% | ₹18.7 L+₹5.6 L (42.8%) | L5 | Admitted-Finance |
Tender Value
₹25.2 L
EMD Value
₹50,470
Closing Date
5 Aug 2026, 3:00 pmClosed
EE,NMD-3,DDA
EE,NMD-3,DDA
Maintenance of Vacant shops and Toilet complex of Transport Centre, Rohtak Road, Punjabi Bagh.
2026_DDA_919787_1
24/EE/NMD-3/DDA/2026-27
Open Tender
Civil Works
Works
60 days
ASHOK VIHAR
Please refer Tender documents.
8 documents required · 8 mandatory
₹0
₹50,470
11 Aug 2026
30 Jul 2026
6 Aug 2026
30 Jul 2026
5 Aug 2026
30 Jul 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Dismantling tile work on walls laid in cement mortar including stacking material within 50 metres lead. For thickness of tiles 10 mm to 25 mm | - | sqm | 73.4 | - |
| 2 | Providing and fixing Ist quality ceramic glazed wall tiles conforming to IS: 15622 (thickness to be specified by the manufacturer), of approved make, in all colours, shades except burgundy, bottle green, black of any size as approved by Engineer-in-Charge, in skirting, risers of steps and dados, over 12 mm thick bed of cement mortar 1:3 (1 cement : 3 coarse sand) and jointing with grey cement slurry @ 3.3kg per sqm, including pointing in white cement mixed with pigment of matching shade complete. | - | sqm | 1,267.95 | - |
| 3 | Providing and fixing 1st quality ceramic glazed (antiskid) floor tiles conforming to IS : 15622 (thickness to be specified by the manufacturer ) of approved make in all colours, shades except burgundy, bottle green, black of any size as approved by Engineer-in-Charge in skirting, risers of steps and dados over 12 mm thick bed of cement Mortar 1:3 (1cement: 3 coarse sand) and jointing with grey cement slurry @ 3.3kgper sqm including pointing the joints with white cement mixed with pigment of matching shade complete. | - | sqm | 1,112.7 | - |
| 4 | Kota stone slabs 20 mm thick in risers of steps, skirting, dado and pillars laid on 12 mm (average) thick cement mortar 1:3 (1 cement 3 coarse sand) and jointed with grey cement slurry mixed with pigment to match the shade of the slabs, including rubbing and polishing complete. | - | sqm | 2,354.7 | - |
| 5 | Dismantling old plaster or skirting raking out joints and cleaning the surface for plaster including disposal of rubbish to the dumping ground within 50 metres lead. | - | sqm | 54.65 | - |
| 6 | 12 mm cement plaster of mix
a) Cement Mortar 1:6 (1 cement : 6 coarse sand). | - | sqm | 333.35 | - |
| 7 | 15 mm cement plaster on the rough side of single or half brick wall of mix :
a) 1:6 (1 cement: 6 fine sand) | - | sqm | 383 | - |
| 8 | Chipping of unsound/weak concrete material from slabs, beams,columns etc. with manual Chisel and/ or by standard power driven percussion type or of approved make including tapering of all edges, making square shoulders of cavities including cleaning the exposed concrete surface and reinforcement with wire brushes etc. and disposal of debris for all lead and lifts all complete as per direction of Engineer-In-Charge
a) 25 mm average thickness | - | sqm | 126.75 | - |
| 9 | Providing, mixing and applying bonding coat of approved adhesive on chipped portion of RCC as per specifications and direction of Engineer-In-charge complete in all respect. SBR Polymer (@10% of cement weight) modified cementitious bond coat @ 2.2 kg cement per sqm of surface area mixed with specified proportion of approved polymer | - | sqm | 141.2 | - |
| 10 | Providing, mixing and applying SBR polymer (of approved make) modified Cement mortar in proportion of 1:4 (1 cement: 4 graded coarse sand with polymer minimum 2% by wt. of cement used) as per specifications and directions of Engineer-in-charge. Note: Measurement and payment: The pre-measurement of thickness shall be done just after the surface preparation is completed and Payment under this item shall be made only after proper wet curing has been done and surface has been satisfactorily evaluated by
sounding / tapping with a blunt metal instrument and/or the 75mm size cube crushing strength at the end of 28 days to be not less than 30 N/Sqmm2).
a) 12 mm average thickness. | - | sqm | 388.65 | - |
stage.html
html • 0.03 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.58 MB
NIT24.pdf
Tender Documents • 1.86 MB
BOQ_966596.xls
BOQ • 0.36 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .