Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹2.9 LAdmitted-Fee/PreQual/Technical/Finance RASIPURAM NAMAKKAL | RASIPURAM | NAMAKKAL | TAMIL NADU | L1 | Admitted-Fee/PreQual/Technical/Finance | |
| 2 | L2₹2.9 L+₹7,426.57 (2.59%)Admitted-Fee/PreQual/Technical/Finance | L2 | Admitted-Fee/PreQual/Technical/Finance | |
| 3 | L3₹3.0 L+₹10,143.78 (3.53%)Admitted-Fee/PreQual/Technical/Finance | L3 | Admitted-Fee/PreQual/Technical/Finance | |
| 4 | L4₹3.0 L+₹12,154.14 (4.23%)Admitted-Fee/PreQual/Technical/Finance | L4 | Admitted-Fee/PreQual/Technical/Finance | |
| 5 | L5₹3.3 L+₹46,509.94 (16.2%)Admitted-Fee/PreQual/Technical/Finance | L5 | Admitted-Fee/PreQual/Technical/Finance |
| Sl No | Description | Qty | Unit | TAMILMURUGA ENGINEERING PROJECTS L5 | Sathiyamoorthi L2 | Tamilsevi L3 | Manikam R L1 | GOKUL CONSTRUCTION L4 |
|---|---|---|---|---|---|---|---|---|
| 1.00Renovation of Public Toilet at Allampatty AR Street H/O Allampatty | ||||||||
| 2.00 | Supplying and applying of two coats of putty of 3mm thick over the exposed RCC surface of ceiling including finishing the joints smoothy with grinding machine and the surface shall be thoroughly cleaned out of dust and scrubbing. The Surface shall then be allowed to dry for atleast 48 hours. It shall then be sand papered (waterproof abrasive sheet) to give a smooth and even surface. Any unevenness shall be made good by applying 1st coat of putty mixed with water on the entire surface including filling up the undulations and applying 2nd coat of putty after 6 hours of 1st coat of putty and then sand papering (waterproof abrasive sheet) the same after it is dry and finishing the surface smoothly, etc., complete complying with standard specifications and as directed by the Departmental Officers. [ The rates are inclusive of hire charges for grinding machine with wheel, cost of sand paper (waterproof abrasive sheet), cost of putty blade, labour charges for grinding the joints and sand papering, two coat of putty, scrapping the putty area to level the surface smooth, etc., complete]. The Putty shoule be got approved by the Executive Engineer before use on work. | 25.52 | Sqm | 1,500 ₹38,280 | 308.85 ₹7,881.85 | 308.85 ₹7,881.85 | 250 ₹6,380 Lowest | 850 ₹21,692 |
| 3.00 | Plastering with cement mortar 1:4mix to 20 mm thick includingcost and conveyance of all materials to site and all labour | 57.58 | Sqm | 550 ₹31,669 | 340 ₹19,577.2 Lowest | 585.32 ₹33,702.73 | 480 ₹27,638.4 | 450 ₹25,911 |
| 4.00 | Plastering with Cement Mortar 1:5 (One cement and Five P.Sand), 12mm thick in all floors including curing etc. complete complying with standard specification and as directed by the departmental officers. | 29.5 | Sqm | 450 ₹13,275 | 281.51 ₹8,304.55 | 281.51 ₹8,304.55 | 226.6 ₹6,684.7 Lowest | 450 ₹13,275 |
| 5.00 | Supply of water closet with" P" trap | 20 | Sqm | 2,000 ₹40,000 | 4,154 ₹83,080 | 4,120 ₹82,400 | 4,539 ₹90,780 | 500 ₹10,000 Lowest |
| 6.00 | Paving the Floor with scratch proof ceromic tiles of size 305x305x6mm including cost and conveyance of all materials to site and all labour charges etc complete | 28.6 | Sqm | 1,050 ₹30,030 | 960 ₹27,456 | 1,060.69 ₹30,335.73 | 853.8 ₹24,418.68 Lowest | 1,450 ₹41,470 |
| 7.00 | Repairs of steel doors of size 0.75X1.80 etc complete | 27 | Sqm | 850 ₹22,950 | 700 ₹18,900 | 700 ₹18,900 | 563.5 ₹15,214.5 | 450 ₹12,150 Lowest |
| 8.00 | DISTEMPERING TWO COATS for plastered surface using best quality and approved colour of oil bound distemper conforming to ISI specification etc., complete complying with standard specification. | 176.74 | Sqm | 150 ₹26,511 | 150.42 ₹26,585.23 | 150.42 ₹26,585.23 | 121.1 ₹21,403.21 Lowest | 350 ₹61,859 |
| 9.00 | Exterior Emulsion Painting Two Coats with approved Emulsion Paint over Cement Plastered surface including cost and conveyance of materials and labour charges etc complete. | 156.68 | Sqm | 250 ₹39,170 | 240 ₹37,603.2 | 145 ₹22,718.6 Lowest | 215.25 ₹33,725.37 | 330 ₹51,704.4 |
| 10.00 | Painting two coats over new iron work using synthetic enamal paint including cost and conveyance of all materials to site etc complete | 62.96 | Sqm | 400 ₹25,184 | 140 ₹8,814.4 | 153.7 ₹9,676.95 | 123.75 ₹7,791.3 Lowest | 180 ₹11,332.8 |
Tender Value
Refer Docs
EMD Value
₹3,600
Closing Date
9 Oct 2026, 3:00 pmClosed
BDO BP
Block Development Office, Vennandur
Renovation of Public Toilet at Allampatty AR Street H/O Allampatty
2026_RDTN_710448_1
3107/2026
Open Tender
Civil Works - Buildings
Item Rate
120 days
Vennandur Block
Please refer Tender documents.
2 documents required · 2 mandatory
₹0
₹3,600
Yes
14 Oct 2026
1 Oct 2026
9 Oct 2026
1 Oct 2026
9 Oct 2026
1 Oct 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Renovation of Public Toilet at Allampatty AR Street H/O Allampatty | - | - | - | - |
| - | Supplying and applying of two coats of putty of 3mm thick over the exposed RCC surface of ceiling including finishing the joints smoothy with grinding machine and the surface shall be thoroughly cleaned out of dust and scrubbing. The Surface shall then be allowed to dry for atleast 48 hours. It shall then be sand papered (waterproof abrasive sheet) to give a smooth and even surface. Any unevenness shall be made good by applying 1st coat of putty mixed with water on the entire surface including filling up the undulations and applying 2nd coat of putty after 6 hours of 1st coat of putty and then sand papering (waterproof abrasive sheet) the same after it is dry and finishing the surface smoothly, etc., complete complying with standard specifications and as directed by the Departmental Officers. [ The rates are inclusive of hire charges for grinding machine with wheel, cost of sand paper (waterproof abrasive sheet), cost of putty blade, labour charges for grinding the joints and sand papering, two coat of putty, scrapping the putty area to level the surface smooth, etc., complete]. The Putty shoule be got approved by the Executive Engineer before use on work. | 25.52 | Sqm | - | - |
| - | Plastering with cement mortar 1:4mix to 20 mm thick includingcost and conveyance of all materials to site and all labour | 57.58 | Sqm | - | - |
| - | Plastering with Cement Mortar 1:5 (One cement and Five P.Sand), 12mm thick in all floors including curing etc. complete complying with standard specification and as directed by the departmental officers. | 29.5 | Sqm | - | - |
| - | Supply of water closet with" P" trap | 20 | Sqm | - | - |
| - | Paving the Floor with scratch proof ceromic tiles of size 305x305x6mm including cost and conveyance of all materials to site and all labour charges etc complete | 28.6 | Sqm | - | - |
| - | Repairs of steel doors of size 0.75X1.80 etc complete | 27 | Sqm | - | - |
| - | DISTEMPERING TWO COATS for plastered surface using best quality and approved colour of oil bound distemper conforming to ISI specification etc., complete complying with standard specification. | 176.74 | Sqm | - | - |
| - | Exterior Emulsion Painting Two Coats with approved Emulsion Paint over Cement Plastered surface including cost and conveyance of materials and labour charges etc complete. | 156.68 | Sqm | - | - |
| - | Painting two coats over new iron work using synthetic enamal paint including cost and conveyance of all materials to site etc complete | 62.96 | Sqm | - | - |
stage.html
html • 0.02 MB
finance_853609.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.40 MB
Alampattitoilettechnicalbid.pdf
Tender Documents • 1.33 MB
BOQ_853609.xls
BOQ • 0.24 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .