Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹19.2 CrAccepted-Finance | L1 | Accepted-Finance Responsive and set for evaluation | |
| 2 | L2₹19.5 Cr+₹27.7 L (1.44%)Accepted-Finance | L2 | Accepted-Finance Responsive and set for evaluation |
Tender Value
₹19.4 Cr
EMD Value
₹19.4 L
Closing Date
28 Mar 2025, 4:00 pmClosed
EE, Bomdila Division, PWD, AP, Bomdila
O/o EE, Bomdila Division, PWD, AP, Bomdila
C/o road from CH 200 km at NH-913 to CO HQ Chhalwo in West Kameng District (CMCSRDP-II)
2025_PWDAP_2324_1
BDL/TA-21/NSD-10/2024-25/250 Dated 13/03/2025
Open Tender
Civil Works – Roads
Item Rate
Chhalwo
Please refer Tender documents.
8 documents required · 8 mandatory
₹5,000
EE Bomdila Division, PWD, AP, Bomdila
₹19.4 L
29 Mar 2025
15 Mar 2025
29 Mar 2025
15 Mar 2025
28 Mar 2025
15 Mar 2025
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1SITE CLEARANCE | |||||
| 1.01 | Clearing and grubbing road land including uprooting rank vegetation, grass, bushes, shrubs, saplings and trees girth up to 300 mm, removal of stumps of trees cut earlier and disposal of unserviceable materials and stacking of serviceable material to be used or auctioned, up to a lead of 1000 metres including removal and disposal of top organic soil not exceeding 150 mm in thickness. By Manual Means:- B) In area of thorny jungle | - | Hect. | 1.25 | - |
| 2(SH: Formation Cutting ) | |||||
| 2.01 | EARTH WORK IN HILL ROAD Excavation in Hill Area in Soil by Mechanical Means (Excavation in soil in hilly area by mechanical means including cutting and trimming of side slopes and disposing of excavated earth with all lifts and lead upto 1000 metres) | 0.29 | cum | 100 | ₹29 |
| 2.02 | Deduct for quantum of earthwork of all types disposal directly by throwing into the valley without involving any lead and lift (Ordinary and Hard Soil/Hard Shale, Soil containing shingle or small size boulders. | - | cum | 53 | - |
| 2.03 | Excavation in Hilly Area in Ordinary Rock by Mechanical Means not Requiring blasting. (Excavation in hilly area in ordinary rock not requiring blasting by mechanical means including cutting and trimming of slopes and disposal of cut materials with all lift and lead upto 1000 metres). | - | cum | 10 | - |
| 2.04 | Excavation in Hard Rock (blasting prohibited) Excavation for roadway in hard rock (blasting prohibited) with rock breakers including breaking rock, loading in tippers and disposal within all lifts and lead upto 1000 metres, trimming bottom and side slopes in accordance with requirements of lines, grades and cross sections. | 1 | cum | 11 | ₹10.99 |
| 2.05 | Deduct for quantum of earthwork of all types disposal directly by throwing into the valley without involving any lead and lift Ordinary and Hard Rock | - | cum | 11 | - |
| 3(SH:Sub Grade Preparation and GSB-I) | |||||
| 3.01 | Preparation of sub grade Preparation of sub grade by excavating earth to an average depth of 22.50 cm, dressing to camber and consolidating with road roller, making good the undulations etc. and disposal of surplus earth, lead upto 50 m. | - | sqm | 10 | - |
stage.html
html • 0.03 MB
tech_eval.pdf
fin_eval.pdf
finance_2487.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
165946908.xls
BOQ Document • 0.37 MB
165946909.pdf
Tender Document • 4.10 MB
Tender.pdf
Tender Document • 36.60 MB
165946911.html
Tender Document • 0.06 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .