Loading…
India Infra Updates on WhatsApp
Join the Tenderkart WhatsApp channel for India Tender Updates
Loading…
Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹8.5 LAccepted-AOC 223 N DHARMAPALLY TENTULTALA ASANSOL BURDWAN WEST BENGAL 713304 | ASANSOL | BURDWAN | WEST BENGAL | 713304 | L1 | Accepted-AOC Stands L1 and Satisfactory | |
| 2 | L2₹8.5 L+₹8,482.06 (1.00%)Rejected-Finance | L2 | Rejected-Finance Stands L2 | |
| 3 | L3₹8.6 L+₹16,910.73 (2.00%)Rejected-Finance 266 1 S B GORAI ROAD BESIDE VIDYASAGAR MAIDAN ASANSOL 713301 | ASANSOL | BURDWAN | WEST BENGAL | 713301 | L3 | Rejected-Finance Stands L3 | |
| 4 | L4₹8.7 L+₹25,392.81 (3.00%)Rejected-Finance KALYANESWARI PASCHIM BARDHAMAN WEST BENGAL | KALYANESWARI | PASCHIM BARDHAMAN | WEST BENGAL | L4 | Rejected-Finance Stands L4 |
Tender Value
Refer Docs
EMD Value
₹18,000
Closing Date
22 Feb 2023, 3:30 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
Executive Engineer, Asn Mech Divn, PHE Dte
Janasasthya Karigori Bhaban, Sen-Releigh Road, Opp ESI Hospital, Asansol - 05
Withdrawing, Repairing and Lowering of Submersible Pumping Machineries along with rectification of cable fault of river bed tube wells at Madanpur water works under RCFA-II Water Supply Scheme..
2023_PHED_470390_1
WBPHE /EE/AMD/NIT 57e / 2022-2023
Open Tender
Electrical Work/ Equipment
Item Wise
10 days
Madanpur
Please refer Tender documents.
3 documents required · 3 mandatory
₹18,000
11 Apr 2023
8 Feb 2023
24 Feb 2023
8 Feb 2023
22 Feb 2023
8 Feb 2023
Amount
Withdrawing of 6HP old & existing submersible pumping machineries from river bed tubewells along with column pipe after disconnection of all electrical and pipeline connection with the help of derrick and chain pulley arrangement by engagging skilled technician as per direction of EIC.
Carrying the pump-motor set from (Madanpur) to workshop (Asansol) for necessary reparing including loading & unloading charges.
Dismantling the defective 7.5H.P pump & motor set part by part for detecting actual fault.
Supply & delivery of following spare parts for Pump as per sample :-
Neck Ring (G.M)
Intermediate Bush. (G. M).
Bush (Rubber)
Shaft Sleeve (S. S).
Impeller Key (S.S)
Water seal.
Supply & delivery of following spare parts for Motor as per sample :-
Thrust bearing set.
Sand guard (Rubber).
Motor Coupling.
Impeller polishing / mechining.
Reassembling the pump & motor set with the above supplied materials as mentioned in item no. 04 & 05 and the old serviceable spares to complete the job as per direction of E. I. C.
Painting the following repaired pump-motor set with supplying of approved quality paint after scrapping the old painted surface as per direction.
Carrying the above pump-motor set from workshop to site after repairing including loading & unloading charges.
Carrying the 10sqmm cable drum (Approx length- 1027m) from Andal water suply scheme to said scheme for necessary reparing including loading & unloading charges.
Jungle cutting and cleaning of adjoining areas of collector main pipe line of river bed tube well and cutting various type of shrubs, small plants and cleaning & removing the garbage from site as per direction of EIC.
Supply & delivery at site 10 mm² x 3 core Aluminum Armored, XLPE insulated 1.1 K.V. grade cable, conforming to IS 7098(I) as per direction of EIC. (Make:- Gloster / Polycab / Mescab / or any approved vendor. ) ( N.B : Manufacturer's test certificate have to be submitted at the time of delivery.)
Supply & delivery of GI wire for holding the 10sqmm cable.
Laying of 10 mm2 x 3 core Al. Ar. Cable (Dept supplied as well as new supplied) along the length of collecting line including fixing with supplied GI Wire at a suitable interval so as to prevent sagging of cable complete as per direction of EIC . (Pump to H/L Panel)
Making straight through joint between existing motor cable and submersible copper flat cable (4sqmm) for extension of motor cable up to required lengh by supplying necessary seal kit to make joints leak proof all complete as per direction.
Making straight through joint of 3 core 10 mm2 Al Ar Cable with submersible flat cable by supplying Ferrul , rubber and other necessary materials to make the joint leak proof.
Lowering of 7.5HP old & existing submersible pumping machinery along with existing column pipe part by part in the tube wells with an arrangement of derrick, lifting tackles, tools and plants etc. all complete as per direction.
Add. GST@18%
Add. Cess@1%
INDUSTRIAL ELECTRICAL CORPORATION
M/S. SWAPAN BANERJEE
SUNRISE ENGINEERING CORPORATION
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .