Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | 1₹21.7 LAccepted-Finance | 1 | Accepted-Finance Correct BOQ uploaded | |
| 2 | 2₹24.8 L+₹3.1 L (14.2%)Accepted-Finance | 2 | Accepted-Finance Correct BOQ uploaded | |
| 3 | 3₹27.7 L+₹6.0 L (27.9%)Accepted-Finance | 3 | Accepted-Finance Correct BOQ uploaded |
Tender Value
₹30.3 L
EMD Value
₹60,650
Closing Date
21 Sept 2020, 5:00 pmClosed
P A Koya
Executive Engineer LPWD Division Office Amini
Construction of retaining wall from Jetty to Port control Tower at Chetlat. 200Mtr
2020_UTL_1272_1
NIT NO.16/EE/LPWD/Amini/2020-21
Open Tender
Civil Works - Buildings
Item Rate
90 days
Amini
Please refer Tender documents.
8 documents required · 8 mandatory
₹500
Executive Engineer LPWD Division, Amini
₹60,650
25 Sept 2020
7 Sept 2020
22 Sept 2020
7 Sept 2020
21 Sept 2020
7 Sept 2020
Amount
Surface dressing of the ground including removing vegitation and in equalities not exceeding 15cm deep and disposal of rubbish lead up to 50meter and lift up to 15 meter.(Labour Element)
Earth work excavation by manual means in foundation trenches or drains (not exceeding 1.5m width or 10sqm on plan) including dressing of sides and ramming of bottom,lift up to 1.5,including getting out othe excavated soil and disposal of surplus excavated soil as dirdcted ,withinm a lead of 50mtr. All kind of Soil (Labour Element)
Reinforced cement concrete 1:1.5:3 ( 1 cement: 1.5 M.Sand: 3 granite chips 20mm nominal size) excluding cost of centring and shuttering and reinforcement All work up to plinth level. Foundation footings bases of column etc, and mass concrete. (Labour Element)
Reinforced cement concrete work in (wall any thickness) including attached pilasters, buttresses, plinth and string course, fillets, columns, pillars, piers, abutments, post and struts etc.. up to floor five level excluding cost of centering and shuttering finishing and reinforcement.1:1.5:3 ( 1 cement :1.5 coarse sand :3 graded stone aggregate 20 mm nominal size. .(Labour Element)
Cold twisted steel reinforcement for RCC work including bending,binding and placing inposition complete.(Labour Element)
Centering and shuttering including strutting propping etc and removal of form work for Foundation footings bases of column etc,and mass concrete..(Full Cost)
Centering and shuttering including strutting propping etc and removal of form work for Walls (any thickness) including attached pilasters, buttresses, plinth and string. (Full Cost)
15mm thick cement plaster 1:3(1 cement 3 plastering sand).(Department shall provide cement .Contractor has to bring plastering sand)
Finishing wall with water proofing cement paint of approved brand and manufacture of required shade on new work (two or more coats applied @ 3.84 Kg /10 sqm). (Nerolac /Berger /Asian Paint).(Full cost)
Mohammed Basheer Ahamed CH
SAINA BUILDERS
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .