| 1 | L1₹79.0 CrAccepted-AOC C O EROS PALA EAST LABAN ROAD SHILLONG 793004 | EAST KHASI HILLS | MEGHALAYA | 793004 | ₹79.0 Cr | L1 | Accepted-AOC Being the lowest and reasonable tender. |
| 2 | L2₹79.6 Cr+₹57.6 L (0.73%)Rejected-Finance 510 ZION PRIME THALTEJ SHILAJ ROAD AHMEDABAD 380059 GUJARAT | AHMEDABAD | AHMEDABAD | GUJARAT | 380059 | ₹79.6 Cr+₹57.6 L (0.73%) | L2 | Rejected-Finance Not being the lowest tender. |
| 3 | L3₹85.5 Cr+₹6.5 Cr (8.21%)Rejected-Finance | ₹85.5 Cr+₹6.5 Cr (8.21%) | L3 | Rejected-Finance Not being the lowest tender. |
| 4 | L4₹91.6 Cr+₹12.6 Cr (16.0%)Rejected-Finance 184 MAIN STREET NASIRABAD AJMER RAJASTHAN 305601 | ₹91.6 Cr+₹12.6 Cr (16.0%) | L4 | Rejected-Finance Not being the lowest tender. |
| 5 | L5₹108.0 Cr+₹29.0 Cr (36.7%)Rejected-Finance 1 513 VIDHYADHAR NAGAR JAIPUR 302039 RAJASTHAN | JAIPUR | RAJASTHAN | 302039 | ₹108.0 Cr+₹29.0 Cr (36.7%) | L5 | Rejected-Finance Not being the lowest tender. |
| Sl No | Description | Qty | Unit | Agarwal Jagdish Construction Company Pvt. Ltd. L4 | Som Projects Pvt Ltd L6 | Rabina Enterprises Pvt Ltd L3 | LNA INFRAPROJECTS PVT LTD L5 | S K CONSTRUCTION L1 | Krishna Buildspace Ltd. L2 |
|---|---|---|---|---|---|---|---|---|---|
| 1.00SCHEDULE 'A' PART-I-BUILDINGS & STRUCTURES INCLUDING INTERNAL & EXTERNAL SERVICES AS DEFINED IN ANNEXURE I TO XI (EPC) AND AS MENTIONED BELOW: | |||||||||
| 1.01 | (a) Construction of multi storeyed deficient married accn for Pos and below in 02 towers (S+8 floors for 128 DUs) incl stilt parking for cars & two wheelers, internal services with permanent specification all as specified.
(b) Construction of multi storeyed deficient married accn for Pos and below in 01 tower (S+9 floors for 72 DUs) incl stilt parking for cars & two wheelers, internal services with permanent specification all as specified.
(c) Construction of Pump House building of siz 10m x 6m (internal dimensions) for fire fighting cum fresh water including internal services with permanent specification all as specified.
(d) Construction of UG Sump for fresh water, treated water and fire fighting.
(e) Construction of terrace tankfor fresh water, treated water and firefighting
(f) Construction of raised platform of size 3m x 3m with height 400mm above ground level with canopy for the DG set all as specified. | 1 | Lump sum | 84,85,51,000 ₹84,85,51,000 | 1,04,60,41,200.79 ₹1,04,60,41,200.79 | 74,05,34,538 ₹74,05,34,538 | 97,91,73,000 ₹97,91,73,000 | 67,24,11,468.64 ₹67,24,11,468.64 Lowest | 68,00,00,000 ₹68,00,00,000 |
| 2.00 | SCHEDULE "A" PART-II (EXCAVATION AND EARTHWORK)
Total of Sch-'A' Part-II B/F | 1 | Lump sum | 64,60,249.32 ₹64,60,249.32 Lowest | 85,02,544.4 ₹85,02,544.4 | 94,35,364 ₹94,35,364 | 97,75,000 ₹97,75,000 | 72,25,278.84 ₹72,25,278.84 | 80,00,000 ₹80,00,000 |
| 3.00 | SCHEDULE "A" PART-III (ROADS / PATH & CULVERT)
Total of Sch-'A' Part-III B/F | 1 | Lump sum | 74,55,435.52 ₹74,55,435.52 | 1,04,55,852.65 ₹1,04,55,852.65 | 83,47,538.91 ₹83,47,538.91 | 73,25,000 ₹73,25,000 | 56,07,507.06 ₹56,07,507.06 Lowest | 71,00,000 ₹71,00,000 |
| 4.00 | SCHEDULE "A" PART-IV (SEWAGE DISPOSAL)
Total of Sch-'A' Part-IV B/F | 1 | Lump sum | 19,54,695.91 ₹19,54,695.91 | 26,08,501.51 ₹26,08,501.51 | 21,33,876.37 ₹21,33,876.37 | 18,73,250 ₹18,73,250 | 14,66,021.93 ₹14,66,021.93 Lowest | 17,00,000 ₹17,00,000 |
| 5.00 | SCHEDULE "A" PART-V (AREA DRAINAGE)
Total of Sch-'A' Part-V B/F | 1 | Lump sum | 52,02,346.66 ₹52,02,346.66 | 50,79,673.81 ₹50,79,673.81 | 53,80,204.5 ₹53,80,204.5 | 51,13,500 ₹51,13,500 | 39,57,340.62 ₹39,57,340.62 Lowest | 40,00,000 ₹40,00,000 |
| 6.00 | SCHEDULE "A" PART-VI (RAIN WATER HARVESTING)
Total of Sch-'A' Part-VI B/F | 1 | Lump sum | 5,78,230.98 ₹5,78,230.98 | 6,40,473.69 ₹6,40,473.69 | 6,31,235.48 ₹6,31,235.48 | 5,25,000 ₹5,25,000 | 4,38,491.83 ₹4,38,491.83 Lowest | 5,00,000 ₹5,00,000 |
| 7.00 | SCHEDULE "A" PART-VII (RCC RETAINING WALL)
Total of Sch-'A' Part-VII B/F | 1 | Lump sum | 1,55,19,559.46 ₹1,55,19,559.46 | 1,41,78,873.55 ₹1,41,78,873.55 | 1,43,55,592.5 ₹1,43,55,592.5 | 1,48,70,000 ₹1,48,70,000 | 1,18,98,328.92 ₹1,18,98,328.92 Lowest | 1,25,00,000 ₹1,25,00,000 |
| 8.00 | SCHEDULE "A" PART-VIII (ARBORICULTURE)
Total of Sch-'A' Part-VIII B/F | 1 | Lump sum | 5,68,563 ₹5,68,563 | 5,34,275.59 ₹5,34,275.59 | 5,04,883.94 ₹5,04,883.94 | 5,20,000 ₹5,20,000 | 3,86,622.84 ₹3,86,622.84 Lowest | 5,00,000 ₹5,00,000 |
| 9.00 | SCHEDULE "A" PART-IX (EXTERNAL WATER SUPPLY - TAPPING)
Total of Sch-'A' Part-IX B/F | 1 | Lump sum | 76,040 ₹76,040 | 1,04,798.57 ₹1,04,798.57 | 76,515.25 ₹76,515.25 | 54,000 ₹54,000 | 40,396.25 ₹40,396.25 Lowest | 50,000 ₹50,000 |
Tender Value
₹84.3 Cr
EMD Value
₹15 L
Closing Date
11 Apr 2026, 6:00 pmClosed
CHIEF ENGINEER NAVY MUMBAI
HEADQUARTER CHIEF ENGINEER NAVY MUMBAI, SHAHID BHAGAT SINGH MARG, COLABA, MUMBAI
ENGINEERING, PROCUREMENT AND CONSTRUCTION FOR PROVISION OF DEFICIENT MARRIED ACCOMMODATION FOR SAILORS (POS AND BELOW) AT GOA
2026_MES_754655_1
87962/E8
Open Tender
Civil Works
Lump-sum
1096 days
GOA
AS PER NIT
9 documents required · 9 mandatory
₹3,000
GE (P) Vasco
₹15 L
Yes
COLABA, MUMBAI
9 Sept 2026
27 Feb 2026
13 Apr 2026
27 Feb 2026
11 Apr 2026
4 Apr 2026
28 Feb 2026 - 23 Mar 2026
25 Mar 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1SCHEDULE 'A' PART-I-BUILDINGS & STRUCTURES INCLUDING INTERNAL & EXTERNAL SERVICES AS DEFINED IN ANNEXURE I TO XI (EPC) AND AS MENTIONED BELOW: | |||||
| 1.01 | (a) Construction of multi storeyed deficient married accn for Pos and below in 02 towers (S+8 floors for 128 DUs) incl stilt parking for cars & two wheelers, internal services with permanent specification all as specified.
(b) Construction of multi storeyed deficient married accn for Pos and below in 01 tower (S+9 floors for 72 DUs) incl stilt parking for cars & two wheelers, internal services with permanent specification all as specified.
(c) Construction of Pump House building of siz 10m x 6m (internal dimensions) for fire fighting cum fresh water including internal services with permanent specification all as specified.
(d) Construction of UG Sump for fresh water, treated water and fire fighting.
(e) Construction of terrace tankfor fresh water, treated water and firefighting
(f) Construction of raised platform of size 3m x 3m with height 400mm above ground level with canopy for the DG set all as specified. | 1 | Lump sum | - | - |
| 2 | SCHEDULE "A" PART-II (EXCAVATION AND EARTHWORK)
Total of Sch-'A' Part-II B/F | 1 | Lump sum | 85,00,328.05 | ₹85,00,328.05 |
| 3 | SCHEDULE "A" PART-III (ROADS / PATH & CULVERT)
Total of Sch-'A' Part-III B/F | 1 | Lump sum | 63,72,167.11 | ₹63,72,167.11 |
| 4 | SCHEDULE "A" PART-IV (SEWAGE DISPOSAL)
Total of Sch-'A' Part-IV B/F | 1 | Lump sum | 16,28,913.26 | ₹16,28,913.26 |
| 5 | SCHEDULE "A" PART-V (AREA DRAINAGE)
Total of Sch-'A' Part-V B/F | 1 | Lump sum | 44,46,450.14 | ₹44,46,450.14 |
| 6 | SCHEDULE "A" PART-VI (RAIN WATER HARVESTING)
Total of Sch-'A' Part-VI B/F | 1 | Lump sum | 4,81,859.15 | ₹4,81,859.15 |
| 7 | SCHEDULE "A" PART-VII (RCC RETAINING WALL)
Total of Sch-'A' Part-VII B/F | 1 | Lump sum | 1,29,32,966.22 | ₹1,29,32,966.22 |
| 8 | SCHEDULE "A" PART-VIII (ARBORICULTURE)
Total of Sch-'A' Part-VIII B/F | 1 | Lump sum | 4,54,850.4 | ₹4,54,850.4 |
| 9 | SCHEDULE "A" PART-IX (EXTERNAL WATER SUPPLY - TAPPING)
Total of Sch-'A' Part-IX B/F | 1 | Lump sum | 47,525 | ₹47,525 |
stage.html
html • 0.06 MB
tech_bid_open.pdf
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Tendernotice_1.pdf
PDF • 0.27 MB
87962Tender.pdf
Tender Documents • 10.96 MB
87962drawings.pdf
Additional Documents • 12.11 MB
BOQ_845262.xls
BOQ • 0.32 MB
87962TenderAmendment13May2026.pdf
PDF • 0.04 MB
87962Amendeddrgs08May2026.pdf
PDF • 4.40 MB
87962TenderAmendment08May2026.pdf
PDF • 1.68 MB
87962Amendeddrgs06May2026.pdf
PDF • 2.74 MB
87962TenderAmendment06May2026.pdf
PDF • 2.48 MB
87962DateAmendment04May2026.pdf
PDF • 0.02 MB
TD1RR24Apr2026.pdf
PDF • 0.18 MB
87962TenderAmendment28Apr2026.pdf
PDF • 0.04 MB
87962DateAmendment28Apr2026.pdf
PDF • 0.02 MB
87962Amendeddrgs24Apr2026.pdf
PDF • 3.57 MB
87962TenderAmendment24Apr2026.pdf
PDF • 1.01 MB
87962DateAmendment13Apr2026.pdf
PDF • 0.02 MB
87962DateAmendment01Apr2026.pdf
PDF • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .