Loading…
Tenderkart now works inside Claude and ChatGPT: search and analyse tenders right from your chat
Loading…
Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Status |
|---|---|---|
| 1 | Admitted-Finance | Admitted-Finance |
| 2 | Admitted-Finance A3 THIRUVALLUVAR STREET THIRUNAGAR TOWN THIRUPARANKUNDRAM MADURAI 625 006 | MADURAI | MADURAI | TAMIL NADU | 625006 | Admitted-Finance |
Tender Value
Refer Docs
EMD Value
₹77,000
Closing Date
5 Aug 2022, 3:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
ADDITIONAL COLLECTOR (D) MADURAI
0/0 ADDITIONAL COLLECTOR (D) DRDA MADURAI COLLECTORATE MADURAI -625020
Deepening and Improvements to the Ooranies_9 nos in AGAMT-II-2021-22 Village panchayats of Kallikudi Block in Madurai District in Package no.KAL_1
2022_RDTN_243368_1
568/2022/d7/kal01
Open Tender
Civil Works
Item Rate
180 days
KALLIKUDI
REFER TENDER DOCUMENT
3 documents required · 3 mandatory
₹0
₹77,000
0/0 ADDITIONAL COLLECTOR (D) DRDA MADURAI
11 Aug 2022
22 Jul 2022
5 Aug 2022
22 Jul 2022
5 Aug 2022
27 Jul 2022
27 Jul 2022
Amount
Deepening of Oorani and Construction of Bathing ghat & Retaining wall in Vinayagar kovil Oorani in Alangarapuram village @ Kalligudi Pt
Oorani & Retaining Wall & Bathing ghat
Earth work in all soils except hard rock requiring blasting and Conveying for formation of bund with lead of 0 to 100 meter deploying earth moving machinery and tippers including benching, formation of bunds,breaking clods,sectioning etc,.complete SI No:-92F1
Earth work excavation in all soils such as red earth ,hard stiff clay soil, stiff black cotton soil, hard redearth,shales, murrams, gravel,hard rock not requiring blasting ete complete.,SS 20 B Hard soil
Supllying filling with filling M.sand in layers not more than 15 cm thick ,well rammed, wattered and compacted etc,complete
Cement concrete 1:4:8 mix usin 40 mm HBGS metal inculding cost and coveyance of all materials to site including labour for mixing , laying,curing etc complete.,
Supplying and centering shuttering including necessary support for side walls and drains using steel sheets complying with standard specification as directed by departmental officers.
Cement concrete 1:3:6 mix using 40mm ISS metal including cost andconveyance of all materials to site and all labour charges for mixing,laying and curing etc complete for bed blocks for 10 cum
Cement concrete 1:3:6 mix usin 20 mm HBGS metal inculding cost and coveyance of all materials to site including labour for mixing , laying,curing etc complete.,
Provision for Weep Holes
Cement concrete 1:2:4 mix using 20mm ISS metal including cost andconveyance of all materials to site and all labour charges for mixing,laying and curing etc complete for bed blocks for 10 cum
Plastering with cement mortar 1:4mix to 20 mm thick includingcost and conveyance of all materials to site and all labour
Provision for Name bord Chages
Deepening of Oorani and Construction of Retaining wall in Muniyandi kovil Oorani in Vadakkampatti village @ Kalligudi Pt
Oorani & Retaining Wall
Earth work in all soils except hard rock requiring blasting and Conveying for formation of bund with lead of 0 to 100 meter deploying earth moving machinery and tippers including benching, formation of bunds,breaking clods,sectioning etc,.complete SI No:-92F1
Earth work excavation in all soils such as red earth ,hard stiff clay soil, stiff black cotton soil, hard redearth,shales, murrams, gravel,hard rock not requiring blasting ete complete.,SS 20 B Hard soil
Supllying filling with filling M.sand in layers not more than 15 cm thick ,well rammed, wattered and compacted etc,complete
Cement concrete 1:4:8 mix usin 40 mm HBGS metal inculding cost and coveyance of all materials to site including labour for mixing , laying,curing etc complete.,
Supplying and centering shuttering including necessary support for side walls and drains using steel sheets complying with standard specification as directed by departmental officers.
Cement concrete 1:3:6 mix using 40mm ISS metal including cost andconveyance of all materials to site and all labour charges for mixing,laying and curing etc complete for bed blocks for 10 cum
Provision for Weep Holes
Cement concrete 1:2:4 mix using 20mm ISS metal including cost andconveyance of all materials to site and all labour charges for mixing,laying and curing etc complete for bed blocks for 10 cum
Provision for Name bord Chages
Deepening of Oorani and Construction of Bathing ghat & Retaining wall in Achankulam Oorani in Achankulam village @ Kallanai Pt
Oorani & Retaining Wall & Bathing ghat
Earth work in all soils except hard rock requiring blasting and Conveying for formation of bund with lead of 0 to 100 meter deploying earth moving machinery and tippers including benching, formation of bunds,breaking clods,sectioning etc,.complete SI No:-92F1
Earth work excavation in all soils such as red earth ,hard stiff clay soil, stiff black cotton soil, hard redearth,shales, murrams, gravel,hard rock not requiring blasting ete complete.,SS 20 B Hard soil
Supllying filling with filling M.sand in layers not more than 15 cm thick ,well rammed, wattered and compacted etc,complete
Cement concrete 1:4:8 mix usin 40 mm HBGS metal inculding cost and coveyance of all materials to site including labour for mixing , laying,curing etc complete.,
Supplying and centering shuttering including necessary support for side walls and drains using steel sheets complying with standard specification as directed by departmental officers.
Cement concrete 1:3:6 mix using 40mm ISS metal including cost andconveyance of all materials to site and all labour charges for mixing,laying and curing etc complete for bed blocks for 10 cum
Cement concrete 1:3:6 mix usin 20 mm HBGS metal inculding cost and coveyance of all materials to site including labour for mixing , laying,curing etc complete.,
Provision for Weep Holes
Cement concrete 1:2:4 mix using 20mm ISS metal including cost andconveyance of all materials to site and all labour charges for mixing,laying and curing etc complete for bed blocks for 10 cum
Plastering with cement mortar 1:4mix to 20 mm thick includingcost and conveyance of all materials to site and all labour
Provision for Name bord Chages
Deepening of Oorani and Construction of Bathing ghat & Retaining wall in Periyakulam Oorani in Kurayur village @ Kurayur Pt
Oorani & Retaining Wall & Bathing ghat
Earth work in all soils except hard rock requiring blasting and Conveying for formation of bund with lead of 0 to 100 meter deploying earth moving machinery and tippers including benching, formation of bunds,breaking clods,sectioning etc,.complete SI No:-92F1
Earth work excavation in all soils such as red earth ,hard stiff clay soil, stiff black cotton soil, hard redearth,shales, murrams, gravel,hard rock not requiring blasting ete complete.,SS 20 B Hard soil
Supllying filling with filling M.sand in layers not more than 15 cm thick ,well rammed, wattered and compacted etc,complete
Cement concrete 1:4:8 mix usin 40 mm HBGS metal inculding cost and coveyance of all materials to site including labour for mixing , laying,curing etc complete.,
Supplying and centering shuttering including necessary support for side walls and drains using steel sheets complying with standard specification as directed by departmental officers.
Cement concrete 1:3:6 mix using 40mm ISS metal including cost andconveyance of all materials to site and all labour charges for mixing,laying and curing etc complete for bed blocks for 10 cum
Cement concrete 1:3:6 mix usin 20 mm HBGS metal inculding cost and coveyance of all materials to site including labour for mixing , laying,curing etc complete.,
Provision for Weep Holes
Cement concrete 1:2:4 mix using 20mm ISS metal including cost andconveyance of all materials to site and all labour charges for mixing,laying and curing etc complete for bed blocks for 10 cum
Plastering with cement mortar 1:4mix to 20 mm thick includingcost and conveyance of all materials to site and all labour
Provision for Name bord Chages
Deepening of Oorani and Construction of Bathing ghat & Retaining wall in Kashthuri Reddy Oorani in S.Perumalpatti village @ S.P.Natham Pt
Oorani & Retaining Wall & Bathing ghat
Earth work in all soils except hard rock requiring blasting and Conveying for formation of bund with lead of 0 to 100 meter deploying earth moving machinery and tippers including benching, formation of bunds,breaking clods,sectioning etc,.complete SI No:-92F1
Earth work excavation in all soils such as red earth ,hard stiff clay soil, stiff black cotton soil, hard redearth,shales, murrams, gravel,hard rock not requiring blasting ete complete.,SS 20 B Hard soil
Supllying filling with filling M.sand in layers not more than 15 cm thick ,well rammed, wattered and compacted etc,complete
Cement concrete 1:4:8 mix usin 40 mm HBGS metal inculding cost and coveyance of all materials to site including labour for mixing , laying,curing etc complete.,
Supplying and centering shuttering including necessary support for side walls and drains using steel sheets complying with standard specification as directed by departmental officers.
Cement concrete 1:3:6 mix using 40mm ISS metal including cost andconveyance of all materials to site and all labour charges for mixing,laying and curing etc complete for bed blocks for 10 cum
Cement concrete 1:3:6 mix usin 20 mm HBGS metal inculding cost and coveyance of all materials to site including labour for mixing , laying,curing etc complete.,
Provision for Weep Holes
Cement concrete 1:2:4 mix using 20mm ISS metal including cost andconveyance of all materials to site and all labour charges for mixing,laying and curing etc complete for bed blocks for 10 cum
Plastering with cement mortar 1:4mix to 20 mm thick includingcost and conveyance of all materials to site and all labour
Provision for Name bord Chages
Deepening of Oorani and Construction of Retaining wall in Utthamapathi Oorani in Veeraperumalpuram village @ Veeraperumalpuram Pt
Oorani & Retaining Wall
Earth work in all soils except hard rock requiring blasting and Conveying for formation of bund with lead of 0 to 100 meter deploying earth moving machinery and tippers including benching, formation of bunds,breaking clods,sectioning etc,.complete SI No:-92F1
Earth work excavation in all soils such as red earth ,hard stiff clay soil, stiff black cotton soil, hard redearth,shales, murrams, gravel,hard rock not requiring blasting ete complete.,SS 20 B Hard soil
Supllying filling with filling M.sand in layers not more than 15 cm thick ,well rammed, wattered and compacted etc,complete
Cement concrete 1:4:8 mix usin 40 mm HBGS metal inculding cost and coveyance of all materials to site including labour for mixing , laying,curing etc complete.,
Supplying and centering shuttering including necessary support for side walls and drains using steel sheets complying with standard specification as directed by departmental officers.
Cement concrete 1:3:6 mix using 40mm ISS metal including cost andconveyance of all materials to site and all labour charges for mixing,laying and curing etc complete for bed blocks for 10 cum
Provision for Weep Holes
Cement concrete 1:2:4 mix using 20mm ISS metal including cost andconveyance of all materials to site and all labour charges for mixing,laying and curing etc complete for bed blocks for 10 cum
Provision for Name bord Chages
Deepening of Oorani and Construction of Bathing ghat & Retaining wall in Perumal Kovil Oorani in Unnipatti village @ Unnipatti Pt
Oorani & Retaining Wall & Bathing ghat
Earth work in all soils except hard rock requiring blasting and Conveying for formation of bund with lead of 0 to 100 meter deploying earth moving machinery and tippers including benching, formation of bunds,breaking clods,sectioning etc,.complete SI No:-92F1
Earth work excavation in all soils such as red earth ,hard stiff clay soil, stiff black cotton soil, hard redearth,shales, murrams, gravel,hard rock not requiring blasting ete complete.,SS 20 B Hard soil
Supllying filling with filling M.sand in layers not more than 15 cm thick ,well rammed, wattered and compacted etc,complete
Cement concrete 1:4:8 mix usin 40 mm HBGS metal inculding cost and coveyance of all materials to site including labour for mixing , laying,curing etc complete.,
Supplying and centering shuttering including necessary support for side walls and drains using steel sheets complying with standard specification as directed by departmental officers.
Cement concrete 1:3:6 mix using 40mm ISS metal including cost andconveyance of all materials to site and all labour charges for mixing,laying and curing etc complete for bed blocks for 10 cum
Cement concrete 1:3:6 mix usin 20 mm HBGS metal inculding cost and coveyance of all materials to site including labour for mixing , laying,curing etc complete.,
Provision for Weep Holes
Cement concrete 1:2:4 mix using 20mm ISS metal including cost andconveyance of all materials to site and all labour charges for mixing,laying and curing etc complete for bed blocks for 10 cum
Plastering with cement mortar 1:4mix to 20 mm thick includingcost and conveyance of all materials to site and all labour
Provision for Name bord Chages
Deepening of Oorani and Construction of Bathing ghat & Retaining wall in Manthai Oorani in K.Vellakulam village @ K.Vellakulam Pt
Oorani & Retaining Wall & Bathing ghat
Earth work in all soils except hard rock requiring blasting and Conveying for formation of bund with lead of 0 to 100 meter deploying earth moving machinery and tippers including benching, formation of bunds,breaking clods,sectioning etc,.complete SI No:-92F1
Earth work excavation in all soils such as red earth ,hard stiff clay soil, stiff black cotton soil, hard redearth,shales, murrams, gravel,hard rock not requiring blasting ete complete.,SS 20 B Hard soil
Supllying filling with filling M.sand in layers not more than 15 cm thick ,well rammed, wattered and compacted etc,complete
Cement concrete 1:4:8 mix usin 40 mm HBGS metal inculding cost and coveyance of all materials to site including labour for mixing , laying,curing etc complete.,
Supplying and centering shuttering including necessary support for side walls and drains using steel sheets complying with standard specification as directed by departmental officers.
Cement concrete 1:3:6 mix using 40mm ISS metal including cost andconveyance of all materials to site and all labour charges for mixing,laying and curing etc complete for bed blocks for 10 cum
Cement concrete 1:3:6 mix usin 20 mm HBGS metal inculding cost and coveyance of all materials to site including labour for mixing , laying,curing etc complete.,
Provision for Weep Holes
Cement concrete 1:2:4 mix using 20mm ISS metal including cost andconveyance of all materials to site and all labour charges for mixing,laying and curing etc complete for bed blocks for 10 cum
Plastering with cement mortar 1:4mix to 20 mm thick includingcost and conveyance of all materials to site and all labour
Provision for Name bord Chages
Deepening of Oorani and Construction of Bathing ghat & Retaining wall in Solampatti Oorani in Solampatti village @ K.Vellakulam Pt
Oorani & Retaining Wall & Bathing ghat
Earth work in all soils except hard rock requiring blasting and Conveying for formation of bund with lead of 0 to 100 meter deploying earth moving machinery and tippers including benching, formation of bunds,breaking clods,sectioning etc,.complete SI No:-92F1
Earth work excavation in all soils such as red earth ,hard stiff clay soil, stiff black cotton soil, hard redearth,shales, murrams, gravel,hard rock not requiring blasting ete complete.,SS 20 B Hard soil
Supllying filling with filling M.sand in layers not more than 15 cm thick ,well rammed, wattered and compacted etc,complete
Cement concrete 1:4:8 mix usin 40 mm HBGS metal inculding cost and coveyance of all materials to site including labour for mixing , laying,curing etc complete.,
Supplying and centering shuttering including necessary support for side walls and drains using steel sheets complying with standard specification as directed by departmental officers.
Cement concrete 1:3:6 mix using 40mm ISS metal including cost andconveyance of all materials to site and all labour charges for mixing,laying and curing etc complete for bed blocks for 10 cum
Cement concrete 1:3:6 mix usin 20 mm HBGS metal inculding cost and coveyance of all materials to site including labour for mixing , laying,curing etc complete.,
Provision for Weep Holes
Cement concrete 1:2:4 mix using 20mm ISS metal including cost andconveyance of all materials to site and all labour charges for mixing,laying and curing etc complete for bed blocks for 10 cum
Plastering with cement mortar 1:4mix to 20 mm thick includingcost and conveyance of all materials to site and all labour
Provision for Name bord Chages
GST Amount for providing Service to Government Contract Works for the above Construction Works. { GST Amount is the Total GST Amount for total overall quoted amount above this row in column "BB" for all works in this package}
VIRUMANDY CONSTRUCTION
stage.html
html • 0.03 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .