| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | 1₹10.0 LAccepted-AOC JEUR TALUKA KARMALA DISTRICT SOLAPUR | SOLAPUR | MAHARASHTRA | 413001 | ₹10.0 L | 1 | Accepted-AOC 1st lowest |
| 2 | 2₹10.1 LRejected-Finance | ₹10.1 L | 2 | Rejected-Finance 2nd Lowest Quoted Bids |
| 3 | 3₹10.2 LRejected-Finance | ₹10.2 L | 3 | Rejected-Finance 3rd Lowest Quoted Bids |
Tender Value
Refer Docs
Closing Date
5 May 2026, 6:00 pmClosed
sarpanch and Gramadhikari Jeur Tal Karmala
V P Jeur Tal Karmala
internal RCC Gutter in V P Jeur Area Tal Karmala
2026_SOLAP_1299535_1
ET/Nagarisuvidha/01/26
Open Tender
Civil Works
90 days
V P Jeur Tal Karmala
Please refer Tender documents.
3 documents required · 3 mandatory
₹300
Exempted
14 May 2026
30 Apr 2026
8 May 2026
30 Apr 2026
5 May 2026
30 Apr 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount | Item Code |
|---|---|---|---|---|---|---|
| 1 | Item No. 1 :- Excavation for foundation / pipe trenches in earth soils of all types, sand, gravel and soft murum, including removing the excavated material up to a distance of 50 meters and lifts as below, stacking and spreading as directed, normal dewatering, preparing the bed for foundation and excluding backfilling, etc. complete (lift 0 to 1.5 M) | 105.3 | CUM | 165 | ₹17,374.5 | BI01010001010000000000000515BI0100001082 |
| 2 | Item No. 2 :- Excavation for foundation /pipe trenches in hard murum including removing the excavated material up to a distance of 50M and lifts as below, stacking and spreading as directed by Engineer-in-charge, normal dewatering, preparing the bed for foundation and excluding backfilling, etc. complete.(lift 0 to 1.5M) | 126.36 | CUM | 187 | ₹23,629.32 | BI01010001010000000000000515BI0100001083 |
| 3 | Item No. 3 :- Excavation for foundation / pipe trenches in soft rock and old cement and lime masonry foundation asphalt road including removing the excavated material up to a distance of 50 meters and lifts as below, stacking and spreading as directed by Engineer-in-charge, normal dewatering, preparing the bed for foundation and excluding backfilling, etc. complete (lift upto 0 to 1.5 M) | 168.48 | CUM | 629 | ₹1,05,973.92 | BI01010001010000000000000515BI0100001084 |
| 4 | Item No.5 :- Filling in plinth and floors murum bedding in trenches with approved murum from excavated materials from foundation 15cm to 20cm layers including watering and compaction complete. | 63.18 | CUM | 92 | ₹5,812.56 | BI01010001010000000000000515BI0100001086 |
| 5 | Item No.6:- Providing & supplying ISI standard R.C.C.pipes in standard lengths of following class and diameter suitable for either collar joints or rubber ring joints, including all taxes (Central and local), inspection charges, transport to departmental stores/site, unloading and stacking etc 300 mm dia. RCC pipe class NP-II (2.00 M Length) | 468 | RMT | 650 | ₹3,04,200 | BI01010001010000000000000515BI0100001087 |
| 6 | Item No.7:- Lowering, laying and jointing in proper grade and alignment R.C.C. pipes with collar joints in C.M.1:1 proportion or socketed R.C.C. pipes with rubber joints (excluding cost of rubber ring or R.C.C. collar,) including cost of conveyance from stores to site of work, cost of jointing material, labour, giving hydraulic testing etc. complete as directed by Engineer-in-charge (For all class of Ipines) Collar Joints . 300 mm dia. RCC pipe class NP-II (2.00 M Length) | 468 | RMT | 228 | ₹1,06,704 | BI01010001010000000000000515BI0100001089 |
| 7 | Item No. 8:- Providing and constructing B./B. masonry valve chamber with 15 cm thick 1:3:6 proportion PCC bedding additional excavation B.B. masonry in CM 1:5 cm thick precast RCC frames and cover etc. complete as directed by engineer in charge. As above of 60 x 45 cm internal size and depth upto 0.90 M with pre cast R.C.C slab cover. | 33 | CUM | 7,386 | ₹2,43,738 | BI01010001010000000000000515BI0100001091 |
| 8 | Item No. 9:- Refilling the trenches with available excavated stuff with soft material first over pipeline and then hard material in 15 cm layers with all leads and lifts including consolidation, surcharging etc. complete. | 303.9 | CUM | 92 | ₹27,958.41 | BI01010001010000000000000515BI0100001093 |
| 9 | Item No.11 :- Providing and fixing board displaying information, such as 'Name of work, Tender cost,Name of Contractor, Work completion and liability period etc', having rectangular shape of 1.20m x 0.90m size made out 18 gauge (1.25mm) thick mild steel sheet painted with one coat of Zinc chromate stoving primer and two coats of enamel paint on front side and grey stove enamel on back side and border / messages / symbols etc. with approved colour shade paint complete, on M.S.angle of size 35 x 35 x 3 mm frame with properly cross braced M.S. angles of size 35mmx35mmx3mm duly painted including Two M.S. angle iron posts of size 65 mm x 65 mm x 6 mm, 3.65 m long painted with alternate black and white bands of 25 cm width including all fixtures etc.and fixing the boards in 1:4:8 concrete block of size 60 cm x 60 cm x 75 cm including, excavation, refilling ,transportation, and labour etc complete. Spec. No. As directed by Engineer in Charge | 1 | No | 9,963 | ₹9,963 | BI01010001010000000000000515BI0100001095 |
| 10 | GST 18% | - | Job | 0.18 | - | BI01010001010000000000000515BI0100001096 |
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.50 MB
BOQ_2231571.xls
BOQ • 0.24 MB
Download all tender documents and submit your bid