Loading…
Loading…
Tender Value
Refer Docs
EMD Value
₹18.0 L
Closing Date
21 Oct 2026, 3:00 pm
Director of School Education and Literacy Meghala
Directorate of School Education and Literacy Meghalaya, Shillong
Construction of additional facilities at Maharam Govt. Higher Sec. School at Mawkyrwat (South-West Khasi Hills), Repair and Renovation of facilities at Mawlieh Govt. UPS in West Khasi Hills
2026_EDADB_2062_1
SHCDM-II/CW-11/OCB/01
Open Tender
Civil Works - Buildings
Item Rate
730 days
West Khasi Hills
Please refer Tender documents.
4 documents required · 4 mandatory
₹10,000
Director of School Education and Literacy Meghalay
₹18.0 L
21 Sept 2026
21 Sept 2026
21 Oct 2026
22 Sept 2026
21 Oct 2026
14 Oct 2026
29 Sept 2026 - 6 Oct 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1Building | |||||
| 1.01 | Building1 | 1 | Nos | - | - |
| 1.02 | Building2 | 1 | Nos | - | - |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.80 MB
RFP.pdf
Tender Documents • 5.43 MB
EHSSpecs_2. Annexure -1 Specifications_Annexure 1A - Civil Works Technical Specifications.pdf
Additional Documents • 2.08 MB
EHSSpecs_2. Annexure -1 Specifications_Annexure 1Ab - Pile Foundation Works-Technical Specifications.pdf
Additional Documents • 0.93 MB
EHSSpecs_2. Annexure -1 Specifications_Annexure 1B - MEP Technical specificatioon.pdf
Additional Documents • 1.78 MB
EHSSpecs_3. Annexure - 2 EHS_Env. Management Plan.pdf
Additional Documents • 1.45 MB
EHSSpecs_5. Annexure-4 Supplimentary Informations_Maharam_IEE Report (Maharam Govt H. S. School).pdf
Additional Documents • 9.09 MB
EHSSpecs_5. Annexure-4 Supplimentary Informations_Maharam_Maharam Govt.HS School - TOPO.pdf
Additional Documents • 0.31 MB
EHSSpecs_5. Annexure-4 Supplimentary Informations_Maharam_SOIL Geotech REPORT_MAHARAM GHSS.pdf
Additional Documents • 3.46 MB
EHSSpecs_5. Annexure-4 Supplimentary Informations_Mawlieh_18. IR and IP Checklist- MAWLIEH GOVT UPS, West Khasi Hills.pdf
Additional Documents • 0.92 MB
EHSSpecs_5. Annexure-4 Supplimentary Informations_Mawlieh_Mawlieh GUPS - TOPO.pdf
Additional Documents • 0.24 MB
BOQ_2229.xls
BOQ • 1.73 MB
Drawing_4. Annexure-3 Drawings_Maharam_Architectural_0642-T-A-00-10-0001(R0) SITE PLAN.pdf
Additional Documents • 0.32 MB
Drawing_4. Annexure-3 Drawings_Maharam_Architectural_0642-T-A-01-20-0100(R2) GF_FF_FLOOR PLANS.pdf
Additional Documents • 0.56 MB
Drawing_4. Annexure-3 Drawings_Maharam_Architectural_0642-T-A-01-20-0200(R2) SF_TF & ROOF PLAN.pdf
Additional Documents • 0.44 MB
Drawing_4. Annexure-3 Drawings_Maharam_Architectural_0642-T-A-01-21-0100(R1) TACKTILE LAYOUT.pdf
Additional Documents • 0.53 MB
Drawing_4. Annexure-3 Drawings_Maharam_Architectural_0642-T-A-01-23-0100(R1) SIGNAGE DETAILS.pdf
Additional Documents • 0.74 MB
Drawing_4. Annexure-3 Drawings_Maharam_Architectural_0642-T-A-01-24-0100(R1) FIRE EXIT PLAN.pdf
Additional Documents • 0.44 MB
Drawing_4. Annexure-3 Drawings_Maharam_Architectural_0642-T-A-01-30-0100(R2) SECTIONS.pdf
Additional Documents • 0.32 MB
Drawing_4. Annexure-3 Drawings_Maharam_Architectural_0642-T-A-01-40-0100(R2) ELEVATIONS.pdf
Additional Documents • 0.52 MB
Drawing_4. Annexure-3 Drawings_Maharam_Architectural_0642-T-A-01-50-0001(R2) STAIRCASE DETAILS.pdf
Additional Documents • 0.36 MB
Drawing_4. Annexure-3 Drawings_Maharam_Architectural_0642-T-A-01-50-1000 (R0) TOILET DETAILS.pdf
Additional Documents • 0.42 MB
Drawing_4. Annexure-3 Drawings_Maharam_Architectural_0642-T-A-01-50-1001 (R0) TOILET DETAILS.pdf
Additional Documents • 0.39 MB
Drawing_4. Annexure-3 Drawings_Maharam_Architectural_0642-T-A-01-60-0100(R0) TYPICAL WINDOW CHAJJA DETAILS.pdf
Additional Documents • 0.26 MB
Drawing_4. Annexure-3 Drawings_Maharam_Architectural_0642-T-A-01-70-0100(R0) ENTRANCE CANOPY DETAILS.pdf
Additional Documents • 0.25 MB
Drawing_4. Annexure-3 Drawings_Maharam_MEP_Electrical_A-01-20-0100.pdf
Additional Documents • 0.22 MB
Drawing_4. Annexure-3 Drawings_Maharam_MEP_Electrical_A-01-20-0101.pdf
Additional Documents • 0.21 MB
Drawing_4. Annexure-3 Drawings_Maharam_MEP_Electrical_A-01-20-0102.pdf
Additional Documents • 0.22 MB
Drawing_4. Annexure-3 Drawings_Maharam_MEP_Electrical_A-01-20-0103.pdf
Additional Documents • 0.17 MB
Drawing_4. Annexure-3 Drawings_Maharam_MEP_Electrical_A-01-20-0104.pdf
Additional Documents • 0.22 MB
Drawing_4. Annexure-3 Drawings_Maharam_MEP_Electrical_A-01-20-0105.pdf
Additional Documents • 0.20 MB
Drawing_4. Annexure-3 Drawings_Maharam_MEP_Electrical_A-01-20-0106.pdf
Additional Documents • 0.21 MB
Drawing_4. Annexure-3 Drawings_Maharam_MEP_Electrical_A-01-20-0106A.pdf
Additional Documents • 0.16 MB
Drawing_4. Annexure-3 Drawings_Maharam_MEP_Electrical_A-01-20-0107.pdf
Additional Documents • 0.17 MB
Drawing_4. Annexure-3 Drawings_Maharam_MEP_Electrical_A-01-20-0108.pdf
Additional Documents • 0.16 MB
Drawing_4. Annexure-3 Drawings_Maharam_MEP_Electrical_A-01-20-0109.pdf
Additional Documents • 0.16 MB
Drawing_4. Annexure-3 Drawings_Maharam_MEP_Electrical_A-01-20-0110.pdf
Additional Documents • 0.17 MB
Drawing_4. Annexure-3 Drawings_Maharam_MEP_Electrical_A-01-20-0111.pdf
Additional Documents • 0.15 MB
Drawing_4. Annexure-3 Drawings_Maharam_MEP_Electrical_A-01-20-0112.pdf
Additional Documents • 0.15 MB
Drawing_4. Annexure-3 Drawings_Maharam_MEP_FIRE_N0642-P-DRG-F-01-20-0100-R0.pdf
Additional Documents • 0.43 MB
Drawing_4. Annexure-3 Drawings_Maharam_MEP_FIRE_N0642-P-DRG-F-01-20-0200-R0.pdf
Additional Documents • 0.46 MB
Drawing_4. Annexure-3 Drawings_Maharam_MEP_GHSS Maharam SLD.pdf
Additional Documents • 0.18 MB
Drawing_4. Annexure-3 Drawings_Maharam_MEP_PHE_Maharam Govt.HS School_Mawkyrwat_Site plan-PHE.pdf
Additional Documents • 0.49 MB
Drawing_4. Annexure-3 Drawings_Maharam_MEP_PHE_N0642-P-DRG-P-01-20-0100-R0.pdf
Additional Documents • 0.30 MB
Drawing_4. Annexure-3 Drawings_Maharam_MEP_PHE_N0642-P-DRG-P-01-20-0101-R0.pdf
Additional Documents • 0.23 MB
Drawing_4. Annexure-3 Drawings_Maharam_MEP_PHE_N0642-P-DRG-P-01-20-0200-R0.pdf
Additional Documents • 0.28 MB
Drawing_4. Annexure-3 Drawings_Maharam_MEP_PHE_N0642-P-DRG-P-01-20-0201-R0.pdf
Additional Documents • 0.23 MB
Drawing_4. Annexure-3 Drawings_Maharam_Structure_N0642-T-S-MGUPS_01-01 Off 11_R1.pdf
Additional Documents • 4.39 MB
Drawing_4. Annexure-3 Drawings_Mawlieh_Architectural_0642-T-A-00-10-0001(R0) SITE PLAN.pdf
Additional Documents • 0.19 MB
Drawing_4. Annexure-3 Drawings_Mawlieh_Architectural_0642-T-A-01-20-0100(R0) FLOOR PLANS - BLDG -1.pdf
Additional Documents • 0.17 MB
Drawing_4. Annexure-3 Drawings_Mawlieh_Architectural_0642-T-A-01-21-0100(R0) FLOOR PLAN -TACKTILE LAYOUT - BLDG -1.pdf
Additional Documents • 0.18 MB
Drawing_4. Annexure-3 Drawings_Mawlieh_Architectural_0642-T-A-01-23-0100(R0) FLOOR PLAN -SIGNAGE LAYOUT BLDG - 1.pdf
Additional Documents • 0.22 MB
Drawing_4. Annexure-3 Drawings_Mawlieh_Architectural_0642-T-A-01-24-0100(R0) FLOOR PLAN - FIRE EXIT PLAN BLDG - 1.pdf
Additional Documents • 0.17 MB
Drawing_4. Annexure-3 Drawings_Mawlieh_Architectural_0642-T-A-01-30-0100(R0) SECTIONS & ELEVATIONS - BLDG -1.pdf
Additional Documents • 0.13 MB
Drawing_4. Annexure-3 Drawings_Mawlieh_Architectural_0642-T-A-02-20-0100(R0) FLOOR PLANS SECTIONS & ELEVATIONS - BDG - 2.pdf
Additional Documents • 0.15 MB
Drawing_4. Annexure-3 Drawings_Mawlieh_Architectural_0642-T-A-02-21-0100(R0) FLOOR PLANS -TACTILE ,SIGNAGE & FIRE EXIT PLAN - BLDG - 2.pdf
Additional Documents • 0.22 MB
Drawing_4. Annexure-3 Drawings_Mawlieh_Architectural_0642-T-A-03-20-0100(R0) FLOOR PLANS SECTIONS & ELEVATIONS - BDG- 3.pdf
Additional Documents • 0.16 MB
Drawing_4. Annexure-3 Drawings_Mawlieh_Architectural_0642-T-A-03-21-0100(R0) FLOOR PLANS -TACTILE ,SIGNAGE & FIRE EXIT PLAN - BDG -3.pdf
Additional Documents • 0.25 MB
Drawing_4. Annexure-3 Drawings_Mawlieh_Architectural_0642-T-A-04-20-0100 (R0) PROPOSED BOYS & GIRLS & CWSN TOILET.pdf
Additional Documents • 0.33 MB
Drawing_4. Annexure-3 Drawings_Mawlieh_Architectural_0642-T-A-04-21-0100 (R0) PROPOSED BOYS & GIRLS & CWSN TOILET- TACTILE & SIGNAGE LAYOUT.pdf
Additional Documents • 0.39 MB
Drawing_4. Annexure-3 Drawings_Mawlieh_MEP_Electrical_MAWLEIH GUPS - BLDG -1- EARTHING LAYOUT.pdf
Additional Documents • 0.17 MB
Drawing_4. Annexure-3 Drawings_Mawlieh_MEP_Electrical_MAWLEIH GUPS - BLDG -1- ELV LAYOUT.pdf
Additional Documents • 0.16 MB
Drawing_4. Annexure-3 Drawings_Mawlieh_MEP_Electrical_MAWLEIH GUPS - BLDG -1- LIGHTING LAYOUT.pdf
Additional Documents • 0.19 MB
Drawing_4. Annexure-3 Drawings_Mawlieh_MEP_Electrical_MAWLEIH GUPS - BLDG -1- POWER LAYOUT.pdf
Additional Documents • 0.17 MB
Drawing_4. Annexure-3 Drawings_Mawlieh_MEP_Electrical_MAWLEIH GUPS - BLDG -2- EARTHING LAYOUT.pdf
Additional Documents • 0.14 MB
Drawing_4. Annexure-3 Drawings_Mawlieh_MEP_Electrical_MAWLEIH GUPS - BLDG -2- ELV LAYOUT.pdf
Additional Documents • 0.14 MB
Drawing_4. Annexure-3 Drawings_Mawlieh_MEP_Electrical_MAWLEIH GUPS - BLDG -2- LIGHTING LAYOUT.pdf
Additional Documents • 0.14 MB
Drawing_4. Annexure-3 Drawings_Mawlieh_MEP_Electrical_MAWLEIH GUPS - BLDG -2- POWER LAYOUT.pdf
Additional Documents • 0.14 MB
Drawing_4. Annexure-3 Drawings_Mawlieh_MEP_Electrical_MAWLEIH GUPS - BLDG -3- EARTHING LAYOUT.pdf
Additional Documents • 0.14 MB
Drawing_4. Annexure-3 Drawings_Mawlieh_MEP_Electrical_MAWLEIH GUPS - BLDG -3- ELV LAYOUT.pdf
Additional Documents • 0.14 MB
Drawing_4. Annexure-3 Drawings_Mawlieh_MEP_Electrical_MAWLEIH GUPS - BLDG -3- LIGHTING LAYOUT.pdf
Additional Documents • 0.15 MB
Drawing_4. Annexure-3 Drawings_Mawlieh_MEP_Electrical_MAWLEIH GUPS - BLDG -3- POWER LAYOUT.pdf
Additional Documents • 0.14 MB
Drawing_4. Annexure-3 Drawings_Mawlieh_MEP_Electrical_MAWLEIH GUPS - BLDG -4 - PROPOSED BOYS & GIRLS & CWSN TOILET- LIGHTING.pdf
Additional Documents • 0.16 MB
Drawing_4. Annexure-3 Drawings_Mawlieh_MEP_Electrical_MAWLEIH GUPS - BLDG -4 - PROPOSED BOYS & GIRLS & CWSN TOILET- POWER.pdf
Additional Documents • 0.16 MB
Drawing_4. Annexure-3 Drawings_Mawlieh_MEP_Electrical_SLD-Layout1.pdf
Additional Documents • 0.17 MB
Drawing_4. Annexure-3 Drawings_Mawlieh_MEP_Mechanical_MAWLEIH GUPS - BLDG -4 - PROPOSED BOYS & GIRLS & CWSN TOILET- DRAINAGE.pdf
Additional Documents • 0.21 MB
Drawing_4. Annexure-3 Drawings_Mawlieh_MEP_Mechanical_MAWLEIH GUPS - BLDG -4 - PROPOSED BOYS & GIRLS & CWSN TOILET- PLUMBING.pdf
Additional Documents • 0.19 MB
Drawing_4. Annexure-3 Drawings_Mawlieh_Structural_DBR_Mawleih GUPS-R&R_R1.pdf
Additional Documents • 0.93 MB
Drawing_4. Annexure-3 Drawings_Mawlieh_Structural_N0642-T-S-MGUPS-01-01_R1(BUIL-1).pdf
Additional Documents • 0.19 MB
Drawing_4. Annexure-3 Drawings_Mawlieh_Structural_N0642-T-S-MGUPS-02-01off 02_R1(BUIL-2).pdf
Additional Documents • 0.85 MB
Drawing_4. Annexure-3 Drawings_Mawlieh_Structural_N0642-T-S-MGUPS-03-01_R1(BUIL-3).pdf
Additional Documents • 0.18 MB
Drawing_4. Annexure-3 Drawings_Mawlieh_Structural_N0642-T-S-MGUPS-04-01off 02_R1(TOI-04).pdf
Additional Documents • 0.78 MB
Drawing_4. Annexure-3 Drawings_Mawlieh_Structural_N0642-T-S-MGUPS-05-01off 02_R1(DRIKING BUIL-05).pdf
Additional Documents • 0.56 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .