Loading…
Tenderkart now works inside Claude and ChatGPT: search and analyse tenders right from your chat
Loading…
Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Status |
|---|---|---|
| 1 | Admitted-Finance 0 PURE LADAI SADR PURE LADAI SULTANPUR SULTANPUR UTTAR PRADESH 228001 | SULTANPUR | UTTAR PRADESH | 228001 | Admitted-Finance |
| 2 | Admitted-Finance | Admitted-Finance |
| 3 | Admitted-Finance | Admitted-Finance |
| 4 | Not Admitted-Fee/PreQual/Technical | Not Admitted-Fee/PreQual/Technical Not Complied with technical specification |
| 5 | Not Admitted-Fee/PreQual/Technical 0 ISLAMPUR BELDHA DEVIPUR TANDA AMBEDKAR NAGAR UTTAR PRADESH 224190 | AMBEDKAR NAGAR | UTTAR PRADESH | 224190 | Not Admitted-Fee/PreQual/Technical Not Complied with technical specification |
Tender Value
Refer Docs
EMD Value
₹37,000
Closing Date
27 May 2022, 2:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
SE ETC Gonda
220 KV Sub-station Campus- Gonda.
Work
2022_UPTCL_701212_1
04/ETC(GD)/2022-23
Open Tender
Electrical Works
Fixed-rate
365 days
Balrampur
Please Refer Tender Documents.
3 documents required · 3 mandatory
₹4,366
EE ETD
₹37,000
30 May 2022
21 May 2022
27 May 2022
21 May 2022
27 May 2022
21 May 2022
90 days
Work for Monthly Routine/Emergency Patrolling and Periodic Cutting/Lopping & Chopping of Trees in Line Corridor and Routine General/Normal Preventive and Minor/Major Breakdown Maintenance works of various 220/132 KV Transmission Lines (Approx. Length 340 Kms.) along with other associated works under ETD Gonda.
PART -A
Periodic (Quarterly) Routine Tower to Tower Patrolling from one end to other end of Following Transmission Lines and Submission of Patrolling Report in Triplicate in Prescribed Proforma Mentioning the Stolen / Missing Tower Parts & Tower Accessories; Trees Falling in the Range of Line Corridor; Damage to Earthwire, Conductor, Jumper, Insulator, No. Plate, phase plate, Danger plate, laoS/kkfud psrkouh OPGW joint Box & other Line Accessories; damage to Foundation, Coping, Chimney, Earthing and constructed building etc. with all due Care of Safety & Precautions :
132 KV Gonda(220)-Balrampur(132) Line (41.67 KM x 4 Quarter = 166.68 Km)
132 KV Balrampur(132kv) - Balrampur chini Mill Line (1.52 KM x 4 Quarter = 6.08 Km)
132 KV Utraula -Balrampur(132kv) Line (18.32 KM x 4 Quarter = 73.28 Km)
132 KV Utraula - Bajaj Co-Gen Line(0.10 KM x 4 Quarter = 0.40 Km)
132 KV Utraula -Bajaj IPP D/C Line (0.254 KM x 4 Quarter = 1.016 Km)
132 KV Gonda (220KV)- Mankapur Line (30.436 KM x 4 Quarter = 121.744 Km)
132 KV Gonda(400KV)- Mankapur Line (30.995 KM x 4 Quarter = 123.98 Km)
132 KV Mankapur - Mankapur Chini Mill Line (9.783 KM x 4 Quarter = 39.132 Km)
132 KV Mankapur - Bajaj Chini Mill LIne (15.581 KM x 4 Quarter = 62.324 Km)
132 KV Utraula -Dumriyaganj Line (40.68 KM x 4 Quarter = 162.72 Km)
LILO of 132 KV Utraula -Dumriyaganj @ Tulsipur (39.78 KM x 4 Quarter = 158.88 Km)
LILO of 132 KV Balrampur (132) - Bhinga Line @ 220 KV S/S Balrampur (3.499 KM x 4 Quarter = 13.996 Km)
132 KV Balrampur (220)- Bhinga Line ckt-II (2.339 KM x 4 Quarter = 9.356 Km)
LILO of 132 KV Gonda(220)-Balrampur(132)@Itiyathok (2.07 KM x 4 Quarter = 8.28 Km)
132 KV DC Balrampur (220)- Itiyathok D/C Line (28.78 KM x 4 Quarter = 115.12 Km)
132 KV DC Balrampur (220)- Tulsipur D/C Line (47.839 KM x 4 Quarter = 191.356 Km)
132 KV Utraula -Balrampur (TSS) Line (26.453 KM x 4 Quarter = 105.812 Km)
Emergency Patrolling of the above 220 KV/132 KV Transmission Lines in the event of Tripping / Break Down (to mobilize gang within 02 Hrs. of intemation of tripping/breakdown) of the Line as per Instructions of Supervising Engineer during the Period of 1 Year as per Details given below :
Emergency Patrolling of Line upto 20 Km Distance. (1 Job for each Emergency Patrolling)
Emergency Patrolling of Line for more than 20 Km upto 50 Km Distance. (1 Job for each Emergency Patrolling)
Periodic Cutting, Lopping & Chopping of Branches of different types of Trees like Mango, Neem, Sheesham, Peepal, Semal, Eucalyptus, Popular etc., Falling in the Range of Corridor of the above Transmission Lines to Provide the Minimum Clearance of about 8 Meter between the Tree & Conductors on both side of the Towers / Conductors of above said Transmission Line with all due Care of Safety & Precautions to Avoid any Damage to nearby Buildings, Power & Telephone Lines Passing nearby, Crops, other nearby Trees etc. The Work also includes Removing, Eliminating & Cleaning the Line Sites after Lopping & Chopping of the Trees during the Period of 1 Year.
PART-B
Routine Normal work & Breakdown Maintenance of Above 220/132KV Transmission Lines alongwith other associated Works during the Period of 1 Year with all due Care of Safety & Precautions, with all Cost of Men, Misc. Consumables, T&Ps etc. Required for Satisfactory Completion of the Work as per Technical Specifications & Direction of the Supervising Engineer including Transportation of Materials from Designated Storage Place to Line Site and Back the Unutilized / Received Back Materials to respective Stores at the Sub Station : NOTE:- For Emegency Tripping/Breakdown work gang will be always available with well equipped T&P, Vehicle, etc. at Balrampur/Gonda City during AMC Period (for One Year)
General/Normal Preventive Maintenance Work on above Transmission Lines:
Removal of damaged Bolts - Nuts of Tower bracing/pieces of above 220/132KV Transmission Lines by Cutting of Tack Welding with the help of Grinding/Cutting Tools. (No. per Bolt)
Replacement of Tower Part in Place of Missing Ones after due Fabrication of Tower Parts as per Sample from off sizes G.I. Angles to be Provided by the Department as per Requirement by due Cutting. Drilling etc, and then, Fixing the same at Required Places at different Tower Locations of above 220/132KV Transmission Lines with Proper Tightening & Chamfering etc. including Transportation of G.I. Angles.
Tack Welding of the Bolts - Nuts of the newly Replaced Towers Parts with 3 tacks of 10 mm thickness & Finally, Applying of Zinc Rich Aluminium Paint on the Affected Surfaces on above 220/132KV Transmission Lines. (No. per Bolt).
Providing & Fixing of Number Plate as per Sample in Place of Missing Ones at different Tower Locations of above 220/132KV Transmission Lines with Proper Tightening including Cost of Number Plate.
Providing & Fixing of Phase Plate Set as per Sample in Place of Missing Ones at different Tower Locations of above 220/132KV Transmission Lines with Proper Tightening including Cost of Phase Plate Set.
Providing & Fixing of Danger Plate as per Sample in Place of Missing Ones at different Tower Locations of above 220/132KV Transmission Lines with Proper Tightening including Cost of Danger Plate.
Earthing Work on above 220/132KV Transmission Lines (at Locations where Earthing is Damaged) by Providing of Pipe type Earthing Equipment Set, consisting of 32 mm dia. 3050 mm Long Heavy Duty Perforated 'C' Class G.I. Pipe, 50 mm x 6 mm size & 4750 mm Long Galvanized Steel Flat, 2 No. 12 mm x 40 mm size G.I. Bolts -Nuts - Spring Washers etc, as per Sample including Earth Work and Cost of Coke, Salt etc. (1 Job per Earthing)
Repairing of Damaged Coping of above 220/132KV Transmission Lines with Cost of Cement, Mortar, Sand etc. (I Job for cach Leg of the Tower).
Repairing of Damaged Chimney of above 220/132KV Transmission Lines including Breaking of Damaged Portion, if any, with Cost of Cement, Mortar, Sand etc. (1 Job for each Chimney)
Back Filling of Tower Legs of above 132KV Transmission Lines with Earth upto Ground Level including Cost of Earth etc.
Tightening of Jumper alongwith Replacement of Fasteners, if Required, to be Provided by the Department as per Requirement on Section Towers of above 220/132KV Transmission Lines:
Re-Fixing & Tightening of Dislocated / Shifted Conductor Vibration Damper to its Place including Replacement of Fasteners, if Required, to be Provided by the Department as per Requirement on above 132KV Transmission Lines:
Tightening of Earth Wire Suspension Clamp on 'A' type Towers of above 220/132KV Transmission Lines
Replacement of Damaged Earth Wire Copper Bond by New Ones to be Provided by the Department on Section Towers of above 220/132KV Transmission Lines.
Re-Fixing & Tightening of Dislocated / Shifted Earth Wire Vibration Damper to its Place including Replacement of Fasteners, if Required, to be Provided by the Department as per Requirement on above 220/132KV Transmission Lines
Replacement of Defective/ragged jumper found during patrolling of 220 KV/132 KV Transmission Line.
Emergency Maintenance Works based on the Tripping / minor Breakdown (to mobilize gang within 02 Hrs. of intemation of tripping/breakdown) on above Transmission Lines
Replacement of Damaged Jumper alongwith Replacement of Fasteners with New Ones by Making Jumper with Compression Joint Method / Replacement of Jumper with the help of P.G. Clamps on 220/132KV Transmission Lines:
Replacement of Damaged / De-Capped Suspension Disc Insulators / Suspension Disc Insulator String / Damaged Suspension Polymer Insulator String on Suspension Towers of 220/132KV Transmission Lines:
Major Routine Preventive Maintenance Work/Major breakdown Emergency work on above Transmission Lines
Replacement of Damaged / Decapped Tension Disc Insulator / Tension Dise Insulator String / Defective Tension Polymer Insulator String on Section Towers of above 220/132KV Transmission Lines (I Job per String):
Replacement / Repairing of Damaged Portion of Conductor / Replacement of P.G. Clamps from the Conductor of above 220/132KV Transmission Line by Way of Releasing the Respective Phase Conductor from Suspension Fitting of the Towers, if Required between the Section Towers, Cutting of the Damaged Portion / Part Portion of the Conductor, Jointing new Conductor with the help of Mid Span Joint & Dead End Fitting by Making Compression Joint. Finally, Re-Stringing & Sagging of the Conductor as per Sag Chart with Clamping the Conductor at Suspension Towers as Required, as per Details below :
1 Conductor of 1 Span Section
1 Conductor of more than 1 Span Section and Length upto 1 Km
1 Conductor of more than 1 Span Section and Length between 1 to 2 Km
1 Conductor of more than 1 Span Section and Length more than 2 Km
Replacement / Repairing of Damaged Portion of Earth Wire / Replacement of Missing Earth Wire of above 132KV Transmission Lines by Way of Releasing the Earth Wire from Suspension Fitting of Towers between the Section, Cutting Damaged Portion of Earth Wire, Jointing of new Earth Wire with the help of Mid Span Joint / Dead End Fitting by Making Compression Joint. Finally, Re-Stringing and Sagging of the Earth Wire as per Sag Chart with Clamping at Suspension Towers as Required, as per Details below:
Earth Wire of 1 Span Section
Earth Wire of more than 1 Span Section and Length upto 1 Km
Earth Wire of more than 1 Span Section and Length between 1 to 2 Km
Earth Wire of more than 1 Span Section and Length more than 2 Km
Thermal Scanning of above mentioned 220/132 KV Lines as per instruction of Supervision Engineer & Thermovision Camara will be provided by firm.
MS RK ERACTORS
V.P.Associates
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .