Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | 1₹32.6 LAccepted-AOC 150 1ST STREET THOTTILPATHY SALEM CAMP PO METTUR DAM 636 456 | METTUR DAM | SALEM | TAMIL NADU | 636456 | ₹32.6 L Quoted ₹28.9 L | 1 | Accepted-AOC L1 |
| 2 | 2₹29.8 LRejected-AOC M 46 HOUSING BOARD UNIT MATHAYANKUTTAI METTUR DAM 636 452 | METTUR DAM | SALEM | TAMIL NADU | 636452 | ₹29.8 L | 2 | Rejected-AOC L2 |
| Sl No | Description | Qty | Unit | SATHISH ENGINEERING L1 | Mino and co L2 |
|---|---|---|---|---|---|
| 1.00 | Charges for providing required scaffolding and temporary platform on both sides inside the bunkers at the elevation of 19 EL to 30 EL and dismantling after completion of work, including charges for T&P’s hire charges for scaffolding, temporary platform and cost of consumables. | 2 | Nos | 38,000 ₹76,000 | 40,000 ₹80,000 |
| 2.00 | Charges for cutting and removing the existing worn out partition / bunker wall support beams and M.S plates and devolution to stores as scrap including cost of cutting gas, T&P’s hire charges and transporting charges. | 3.5 | Tons | 37,000 ₹1.3 L | 40,000 ₹1.4 L |
| 3.00 | Charges for transportation of required sizes of beams and M.S plates, fabrication and erection of partition wall inside the bunker including charges for transporting cost of consumables like cutting gas, welding electrodes and hire charges for T&P’s. | 14 | Tons | 98,000 ₹13.7 L | 99,000 ₹13.9 L |
| 4.00 | Cost of materials (Contractor’s Scope) 12 MM Thick MS Plate. | 12.5 | Tons | 71,500 ₹8.9 L | 72,000 ₹9 L |
| 5.00 | Cost of materials (Contractors Scope) I Beam 150 X 75 X 6 mm | 1,500 | Kg | 60 ₹90,000 | 70 ₹1.1 L |
| 6.00 | Cost of materials (Contractors Scope) Size:M20x 80 mm Grade 10.9,Full thread IS 1364. Make : UNBRAKO | 930 | Nos. | 350 ₹3.3 L | 400 ₹3.7 L |
Tender Value
Refer Docs
EMD Value
₹30,400
Closing Date
17 Jun 2025, 2:00 pmClosed
Superintending Engineer /Mechanical-I/MTPS-I
Office of the Superintending Engineer / Mechanical -I Mettur Thermal Power Station- I Mettur Dam-636406
MTPS I Mill Plant Unit I Removal of worn out thinned out wall plates of coal bunkers 1D 1E 1F and erection of new wall plates of 12 mm thick MS plates and supporting beams and other related works
2025_EB_564495_1
CE / MTPS-I / SE / M-I / MP /OT.120/ 2025-26
Open Tender
Power/Energy Projects/Products
90 days
Mettur Thermal Power Station-I / Mettur Dam
As per the Tender Specifications
4 documents required · 4 mandatory
₹0
₹30,400
Yes
22 May 2026
3 Jun 2025
18 Jun 2025
3 Jun 2025
17 Jun 2025
3 Jun 2025
Amount
Charges for providing required scaffolding and temporary platform on both sides inside the bunkers at the elevation of 19 EL to 30 EL and dismantling after completion of work, including charges for T&P’s hire charges for scaffolding, temporary platform and cost of consumables.
Charges for cutting and removing the existing worn out partition / bunker wall support beams and M.S plates and devolution to stores as scrap including cost of cutting gas, T&P’s hire charges and transporting charges.
Charges for transportation of required sizes of beams and M.S plates, fabrication and erection of partition wall inside the bunker including charges for transporting cost of consumables like cutting gas, welding electrodes and hire charges for T&P’s.
Cost of materials (Contractor’s Scope) 12 MM Thick MS Plate.
Cost of materials (Contractors Scope) I Beam 150 X 75 X 6 mm
Cost of materials (Contractors Scope) Size:M20x 80 mm Grade 10.9,Full thread IS 1364. Make : UNBRAKO
Mino and co (BID ID -1368787)
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.PDF
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.74 MB
BOQ_673918.xls
BOQ • 0.34 MB
Download all tender documents and submit your bid