| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹3.7 CrAccepted-Finance K 4 FIVE STAR INDUSTRIAL AREA MIDC BUTIBORI NAGPUR 441 122 | NAGPUR | NAGPUR | MAHARASHTRA | 441122 | ₹3.7 Cr | L1 | Accepted-Finance Stood L1 |
| 2 | L2₹5.6 Cr+₹1.9 Cr (49.5%)Accepted-Finance PLOT NO 41 SECTOR D BAGRODA INDUSTRIAL AREA BHOPAL MP 462026 | BHOPAL | MADHYA PRADESH | 462026 | ₹5.6 Cr+₹1.9 Cr (49.5%) | L2 | Accepted-Finance Stood L2 |
| 3 | L3Rejected-Finance CHANDRAPUR MAHARASHTRA 442401 INDIA UDYAM MH 08 0004712 | CHANDRAPUR | MAHARASHTRA | 442401 | - | L3 | Rejected-Finance Stood L3 |
| 4 | Rejected-Technical | - | - | Rejected-Technical Uploaded affidavit regarding Insolvency and Bankruptcy is not duly notarized as well as the firm has not submitted physical copy of the same |
| Sl No | Description | Qty | Unit | UNITED ENGINEERING L2 | EM Services (I) Pvt. Ltd. L1 | SHRAVANI HITECH PRIVATE LIMITED L3 |
|---|---|---|---|---|---|---|
| 1.00SECTION-A1 CLEANING OF BOILER | ||||||
| 1.10 | COMPLETE EXTERNAL CLEANING OF BOILER FROM TOP TO BOTTOM | 1 | 1 JOB | 1,09,150 ₹1,28,797 | 95,000 ₹1,12,100 Lowest | 4,10,000 ₹4,83,800 |
| 1.20 | INTERNAL CLEANING OF BOILER IN SECOND PASS | 1 | 1 JOB | 1,45,239 ₹1,71,382 | 1,23,000 ₹1,45,140 | 85,000 ₹1,00,300 Lowest |
| 1.30 | CLEANING OF PENT HOUSE, WIND BOX AND CAT HOUSE, DOG HOUSE & DEAD CHAMBER, | 1 | 1 JOB | 93,421 ₹1,10,236.8 | 81,000 ₹95,580 Lowest | 5,40,000 ₹6,37,200 |
| 1.40 | CLEANING OF EMERGENCY COOLING WATER SUPPLY TANK FOR BCW MOTOR | 1 | 1 JOB | 54,382 ₹64,170.8 | 47,000 ₹55,460 Lowest | 80,000 ₹94,400 |
| 2.00SECTION-A2 PREPARATION OF SCAFFOLDING | ||||||
| 2.10 | BOILER HORIZONTAL PASS (SCREEN TUBES, LTSH TERMINAL) | 2 | JOB | 3,78,604 ₹4,46,752.7 | 2,62,000 ₹3,09,160 Lowest | 56,00,000 ₹66,08,000 |
| 2.20 | ABOVE ECONOMISER HOPPER FOR INSPECTION OF ECONOMISER LOWER BANK COILS & C-HEADER. | 1 | 1 JOB | 1,58,903 ₹1,87,505.5 | 1,31,000 ₹1,54,580 Lowest | 4,50,000 ₹5,31,000 |
| 2.30 | QUICK ERECT SCAFFOLDING SYSTEM (CUP-LOCK SYSTEM) IN BOILER FURNACE (FROM BOTTOM TO TOP INCLUDING RH) | 1 | 1 JOB | 27,60,000 ₹32,56,800 | 22,55,000 ₹26,60,900 Lowest | 36,00,000 ₹42,48,000 |
| 2.40 | WIND BOX IN ALL FOUR CORNER | 1 | 1 JOB | 1,34,000 ₹1,58,120 | 1,09,000 ₹1,28,620 Lowest | 2,00,000 ₹2,36,000 |
Tender Value
₹3.8 Cr
EMD Value
₹3.8 L
Closing Date
2 Feb 2026, 3:30 pmClosed
CE(Gen), SSTPP Dongalia
IIIrd Floor Admin Building SSTPP
Work of overhauling for Boiler Pressure Part and its associated auxiliaries of Boiler of Unit 1 at 2x600 MW, SSTPP, MPPGCL ,Dongalia.
2025_MPPGC_457935_1
WT-2837/BMD-I
Open Tender
Miscellaneous Works
Item Rate
365 days
Addl. C.E.(P and W)SSTPP, Dongalia
Please refer Tender documents.
20 documents required · 20 mandatory
₹5,000
Yes
₹3.8 L
Yes
1 Jul 2026
2 Dec 2025
4 Feb 2026
2 Dec 2025
2 Feb 2026
2 Dec 2025
SECTION-A1 CLEANING OF BOILER
COMPLETE EXTERNAL CLEANING OF BOILER FROM TOP TO BOTTOM
INTERNAL CLEANING OF BOILER IN SECOND PASS
CLEANING OF PENT HOUSE, WIND BOX AND CAT HOUSE, DOG HOUSE & DEAD CHAMBER,
CLEANING OF EMERGENCY COOLING WATER SUPPLY TANK FOR BCW MOTOR
SECTION-A2 PREPARATION OF SCAFFOLDING
BOILER HORIZONTAL PASS (SCREEN TUBES, LTSH TERMINAL)
ABOVE ECONOMISER HOPPER FOR INSPECTION OF ECONOMISER LOWER BANK COILS & C-HEADER.
QUICK ERECT SCAFFOLDING SYSTEM (CUP-LOCK SYSTEM) IN BOILER FURNACE (FROM BOTTOM TO TOP INCLUDING RH)
WIND BOX IN ALL FOUR CORNER
CAT HOUSE FOR FRONT/REAR S-PANEL BACKSIDE CHECKING, REPAIRING
BOTTOM ASH HOPPER UP TO S-PANEL TUBES
SECTION-A3 INSPECTION
INSPECTION OF COMPLETE BOILER PRESSURE PARTS (1ST & 2ND PASS)
INSPECTION & REPAIR OF ALL DOORS ,WINDOWS AND PEEP HOLES IN BOILER
INSPECTION OF RING HEADER & REFIXING/REPLACEMENT OF STRAINERS & ORIFICES
INTERNAL INSPECTION & CLEANING OF BOILER DRUM
SERVICING OF SECONDARY AIR DAMPERS
DYE PENETRATION TEST (DP TEST) WITH KIT (1sq. Inch = 645 sq. mm)
TRANSPORTATION OF ASH, SCRAPS, DEBRIES AND OTHER WASTE MATERIALS (INCLUDING LOADING/UNLOADING)
HEADER INSPECTION & INSPECTION OF SPRAY NOZZLE, ATTEMPERATOR
SECTION-A4 -HYDROJET CLEANING OF COMPLETE BOILER PRESSURE PARTS COMPONENT
DIVISIONAL SUPERHEATER COILS
PLATEN SUPERHEATER COILS.
RE-HEATER COILS.
WATER WALL ( FRONT, REAR, LEFT & RIGHT)
SECTION-B
ASSISTANCE IN RADIOGRAPHY, OXIDE SCALE MEASUREMENT, MAGNETIC PARTICLE INSPECTION (MPI), STRESS RELIEVING, BOROSCOPIC ETC.
ASSISTANCE IN HYDRAULIC TEST OF BOILER PRESSURE PART & PREPARATION FOR BOILER LIGHT UP
RECTIFICATION, REPLACEMENT AND REFIXING OF PROTECTION SLEEVE (SHIELDING) IN VARIOUS AREAS OF BOILER TUBES.
RECTIFICATION, REPLACEMENT AND REFIXING OF CASSETTE BAFFLES IN VARIOUS AREAS OF BOILER TUBES.
REPAIR & REFIXING OF PROTECTION PLATE OVER LTSH/ECO COIL BENDS (1000X300X5)MM
PREPARATION OF BOILER TUBE SURFACE FOR TUBE THICKNESS SURVEY/ OXIDE SCALE MEASUREMENT/ STRESS RELIEVING
WELDING OF HP JOINTS OF BOILER TUBES
WATER WALL TUBES, SCREEN TUBES, HANGER TUBES, REAR ARCH TUBES ETC.
REPLACEMENT OF WW BURNER PANEL TUBES
STEAM COOLED WALL TUBES
DIVISIONAL SUPERHEATER TUBES
PLATEN SUPERHEATER TUBES
SUPERHEATER STEAM COOLED SPACER TUBES
PENDANT REHEATER FRONT & REAR
REHEATER CROSS OVER TUBES
REHEATER STEAM COOLED SPACER TUBES
LTSH TUBES
LTSH SUPPORT TUBES
ECONOMISER TUBES
ECONOMISER SUPPORT TUBES
ROOF TUBES
HEADER STUBS
HYDRASTEP TUBES
INSTRUMENT PIPINGS
WELDING & REPLACEMENT OF DRAIN & VENT JOINTS
WELDING & REPLACEMENT OF TRACING LINE / SAMPLING LINE
WELDING OF FINS
RE-ENFORCEMENT OF WELDED JOINTS
ALIGNMENT OF COILS/ TUBES
ALIGNMENT OF COILS OF DIVISIONAL SH PANEL
ALIGNMENT OF COILS OF PLATEN SUPERHEATERS
ALIGNMENT OF REHEATER COIL (FRONT/ REAR)
ALIGNMENT OF COIL OF LTSH (UPPER / LOWER)
ALIGNMENT OF COIL OF ECONOMISER (UPPER / MIDDLE / LOWER)
REPLACEMENT REPAIRING OF ECONOMISER MODULE (CONSIST OF 02 COILS IN ALL LOWER, MIDDLE & UPPER BANK)
ECONOMISER UPPER BANK COIL MODULE
ECONOMISER MIDDLE BANK COIL MODULE
ECONOMISER LOWER BANK COIL MODULE
SECTION-C1 GLAND PACKING OF HP VALVES
UPTO 25 MM
25 MM TO 50 MM
50MM TO 100 MM
ABOVE 100 MM
SECTION-C2 COMPLETE SERVICING OF VALVES (EXCLUDING ACTUATOR):
UPTO 25 MM
25 MM TO 50 MM
50 MM TO 100 MM
ABOVE 100 MM
SECTION-C3 REPLACEMENT OF VALVES (WELDED TYPE)
UPTO 25 MM
25 MM TO 50 MM
50 MM TO 100 MM
ABOVE 100 MM
SECTION-C6 COMPLETE SERVICING OF SPRING LOADED SAFETY VALVES (SV)
BOILER DRUM SV
MAIN STEAM LINES SV
CRH LINES SV
HRH LINES SV
SECTION-D1 PREPARATION / FABRICATION OF HP TUBE BENDS
SECTION-D4 REPAIR OF PENT HOUSE OF BOILER
REPAIR OF PENT HOUSE BY PATCHING (WITHOUT STEEL)
DISMANTELING OF STEEL STRUCTURES/INSTALLATION OF NEW STEEL STRUCTURES (WITH STEEL)
SECTION-D5 REPAIR OF WIND BOX
REPAIR OF WIND BOX BY PATCHING (WITHOUT STEEL)
DISMANTELING OF STEEL STRUCTURES/INSTALLATION OF NEW STEEL STRUCTURES (WITH STEEL)
SECTION-D6 REPAIRING OF DEAD CHAMBER
REPAIR OF DEAD CHAMBER BY PATCHING
DISMANTELING OF STEEL STRUCTURES/INSTALLATION OF NEW STEEL STRUCTURES (WITH STEEL)
SECTION-D7 REPAIRING OF CAT HOUSE
REPAIR OF CAT HOUSE BY PATCHING
DISMANTELING OF STEEL STRUCTURES/INSTALLATION OF NEW STEEL STRUCTURES (WITH STEEL)
SECTION-D8 REPAIR & SERVICING
BUCKSTAYS
DIAMOND TYPE LOCKS
ROCKERS
SECTION-D9 DISMNETLING, INSTALLATION, FEBRICATION OF STRUTURE & MISC. WORKS I.E. CANOPY, BROKEN STAIR/RAILING/DRAIN COVERING ETC.
SECTION-D10 INSTALLATION OF MITP
SECTION-D11 SERVICING, CLEANING & REPAIRING OF SAMPLING LINE COOLERS
SECTION-D12 CLEANING, SERVICING & REPAIRING OF HANGERS & SUPPORTS
Section E1: FIXING OF CORRUGATED GI SHEET AT BOILER ROOF & OTHER PLACES
SECTION-E2 PAINTING OF BOILER BASE STRUCTURE/STAIR RAILING/COOLING PIPING ETC.
SECTION-E3 APPLICATION OF REFRACTORY
APPLICATION OF REFRACTORY AT VARIOUS LOCATIONS OF BOILER (GRADE A)
APPLICATION OF REFRACTORY AT VARIOUS LOCATIONS OF BOILER (GRADE C/P)
APPLICATION OF PLASTIC REFRACTORY AT VARIOUS LOCATIONS OF BOILER
SECTION-E4 REMOVAL / BREAKING OF DAMAGED REFRACTORY & TRANSPORTATION
SECTION-E5 THERMAL INSULATION WORK
REMOVAL & APPLICATION OF THERMAL INSULATION (THICKNESS 100 MM)
REMOVAL & APPLICATION OF THERMAL INSULATION (THICKNESS 50 MM)
SECTION-E6 DISPOSAL OF RUBBISH THERMAL INSULATION
SECTION-E7 SUPPLY OF NEW PLAIN AL SHEET OF 22 G
SECTION-F1 Work of installation and implementation of CCTV surveillance system during AOH
stage.html
html • 0.04 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.05 MB
Tendernotice_1.pdf
PDF • 0.33 MB
Tendernotice_2.pdf
PDF • 1.20 MB
Tenderschede457935.pdf
Tender Documents • 1.18 MB
NEWSBDworkservices.pdf
Tender Documents • 30.17 MB
Annexuresnewstamp.pdf
Additional Documents • 0.82 MB
Credentials-457935.xls
Additional Documents • 0.09 MB
ModelCertificate.pdf
Additional Documents • 0.17 MB
NIT457935.pdf
Tender Documents • 0.23 MB
DETAILEDNIT457935.pdf
Tender Documents • 0.32 MB
BOQ_546858.xls
BOQ • 0.38 MB
TCBid457935.xls
Additional Documents • 0.31 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .