| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹2.4 CrAdmitted-Finance | L1 | Admitted-Finance | ||
| 2 | L2₹2.5 Cr+₹7.8 L (3.23%)Admitted-Finance | L2 | Admitted-Finance | ||
| 3 | L3₹2.7 Cr+₹29.6 L (12.2%)Admitted-Finance E 31 SECTOR 36 GREATER NOIDA G B NAGAR U P | GREATER NOIDA | G B NAGAR | U P | L3 | Admitted-Finance |
Tender Value
₹3.4 Cr
EMD Value
₹6.8 L
Closing Date
29 Jul 2026, 5:00 pmClosed
GM(P)
YAMUNA EXPRESSWAY INDUSTRIAL DEVELOPMENT AUTHORITY
C/o 24Mtr wide road, drain, sewer and balance boundary wall, Toe wall, road, sewer, Drain and water line work in footprint for commercial Sector-22A, YEIDA WC-02
2026_YEIDA_1168792_26
YEA/GM(PROJECT)/2026/542 DT-10/07/2026
Open Tender
Civil Works
Fixed-rate
279 days
YAMUNA EXPRESSWAY INDUSTRIAL DEVELOPMENT AUTHORITY
Please refer Tender documents.
5 documents required · 5 mandatory
₹5,175
₹6.8 L
8 Oct 2026
16 Jul 2026
30 Jul 2026
16 Jul 2026
29 Jul 2026
16 Jul 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earth work in excavation by mechanical means (Hydraulic excavator) / manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan), including dressing of sides and ramming of bottoms, lift upto 1.5 m, including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50 m.All kind of soil. Depth 0 to 1.50 mtr | 1 | Cum | 72.8 | ₹72.79 |
| 2 | Cement concrete with 4cm gauge approved stone ballast coarse sand & cement in the proportion of 8:4:1 including supply of all material labour,tools & plants etc required for proper completion of the work UPPWD SOR /281/P-17 | - | Cum | 5,820 | - |
| 3.01 | Providing and laying in position machine batched and machine mixed design mix M-25 grade cement concrete for reinforced cement concrete work, using cement content as per approved design mix, including pumping of concrete to site of laying but excluding the cost of centering, shuttering, finishing and reinforcement, including admixtures in recommended proportions as per IS: 9103 to accelerate, retard setting of concrete, improve workability without impairing strength and durability as per direction of Engineer-in-charge. (Note:- Cement content considered in this item is@330 kg/curn. Excess/less cement used as per design mix is payable/recoverable separately).All works upto plinth level UPPWD SOR-20/5.33.1 | - | Cum | 7,743 | - |
| 3.02 | Providing and laying in position machine batched and machine mixed design mix M-25 grade cement concrete for reinforced cement concrete work, using cement content as per approved design mix, including pumping of concrete to site of laying but excluding the cost of centering, shuttering, finishing and reinforcement, including admixtures in recommended proportions as per IS: 9103 to accelerate, retard setting of concrete, improve workability without impairing strength and durability as per direction of Engineer-in-charge. (Note:- Cement content considered in this item is@330 kg/curn. Excess/less cement used as per design mix is payable/recoverable separately).All works above plinth level UPPWD SOR-20/5.33.1 | 1 | Cum | 8,592.05 | ₹8,591.19 |
| 4.01 | Centering and shuttering including strutting, propping etc. and removal of form for: Foundations, footings, bases of columns, etc. for mass concrete.DAR-13/5.9.1/SOR | - | Sqm | 181.65 | - |
| 4.02 | Columns, Pillars, Piers, Abutments, Posts and struts | 1 | Sqm | 335.55 | ₹335.52 |
| 5 | Reinforcement for R.C.C, work including straightening, cutting, bending, placing in position and binding all complete.up to plinth level Thermo-Mechanically Treated bars./cold twisted bars SOR-20/5.22.6 | - | Kg. | 77.07 | - |
| 6 | M-150 brick work in 1:4 cement & course sand 2.20 F.M. mortar in foundation and plinth including supply of all material, labour and T&P etc. required for proper completion of work | - | Cum | 4,950 | - |
| 7 | M-150 brick work in 1:4 cement & course sand 2.20 F.M. mortar in Superstructure including supply of all material, labour and T&P etc. required for proper completion of work | - | Cum | 5,230 | - |
| 8 | 12 mm cement plaster mix: 1:6 (1 cement : 6 course sand) | - | Sqm | 164.8 | - |
stage.html
html • 0.03 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 3.65 MB
26.pdf
Tender Documents • 1.76 MB
BOQ_2195143.xls
BOQ • 0.29 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .