| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹29.9 LAccepted-AOC GF 3 F 12 KSSIDC BUILDING 5TH CROSS 1ST STAGE PEENYA INDUSTRIAL ESTATE BANGALORE | BENGALURU URBAN | KARNATAKA | 560058 | ₹29.9 L | L1 | Accepted-AOC L1 |
| 2 | L2₹35.1 LRejected-AOC | ₹35.1 L | L2 | Rejected-AOC High rate |
| 3 | L3₹43.1 LRejected-AOC | ₹43.1 L | L3 | Rejected-AOC High rate |
| 4 | Rejected-Technical | - | - | Rejected-Technical Not submitted EMD |
| 5 | Rejected-Technical | - | - | Rejected-Technical Not Meeting Techniacl BEC |
| Sl No | Description | Qty | Unit | POWER ONE MICRO SYSTEMS PVT LTD L1 | Rushikesh Raghunath Todkar L3 | S K ENGINEERING AND CONSTRUCTION COMPANY INDIA PVT LTD L2 |
|---|---|---|---|---|---|---|
| 1.00SOLAR POWER SYSTEM WORKS SV-2B (BENGALURU) | ||||||
| 1.10 | Design , supply installation and commissioning of 40Kwp Solar System as per scope of works and bill of material - PV MODULES | 1 | LS | 6,50,000 ₹6.5 L | 14,80,000 ₹14.8 L | 10,55,000 ₹10.6 L |
| 1.20 | Design , supply installation and commissioning of 40Kwp Solar System as per scope of works and bill of material - INVERTER (NON REDUNDANT) | 1 | LS | 1,00,000 ₹1 L | 1,40,000 ₹1.4 L | 4,48,000 ₹4.5 L |
| 2.00SOLAR POWER SYSTEM WORKS SV-2B (BENGALURU) | ||||||
| 2.10 | Design , supply installation and commissioning of 40Kwp Solar System as per scope of works and bill of material - BROUGHT OUT ITEMS | 1 | LS | 1,50,000 ₹1.5 L | 3,00,000 ₹3 L | 4,48,000 ₹4.5 L |
| 2.20 | Supply installation and commissioning of 40Kwp Solar System as per scope of works and bill of material - Gross metering and Liasioning charges for obtaining statutory approvals and statutory payments and synchronisation etc., for Net metering from BESCOM & Electrical Inspector. | 1 | LS | 1,50,000 ₹1.5 L | 80,000 ₹80,000 | 1,24,000 ₹1.2 L |
| 2.30 | Supply installation and commissioning of Solar System as per scope of works :- Electrical Panel suitable for solar with CT PT Erectionas per site requirement condition. | 1 | LS | 2,75,000 ₹2.8 L | 1,40,000 ₹1.4 L | 1,00,000 ₹1 L |
| 3.00SOLAR POWER SYSTEM WORKS at SV-5B ,IP-04 ,IP05 & IP 07 | ||||||
| 3.10 | Design , supply installation and commissioning of 6Kwp Solar System as per scope of works and bill of material - PV MODULES | 4 | LS | 1,05,000 ₹4.2 L | 2,60,000 ₹10.4 L | 1,55,000 ₹6.2 L |
| 3.20 | Design , supply installation and commissioning of 6Kwp Solar System as per scope of works and bill of material - INVERTER (NON REDUNDANT) | 4 | LS | 60,000 ₹2.4 L | 80,000 ₹3.2 L | 69,600 ₹2.8 L |
Tender Value
Refer Docs
EMD Value
₹92,000
Closing Date
5 Mar 2025, 2:00 pmClosed
BISHAR BIN ALI
GAIL BENGALURU
DESIGN AND SITC OF ON-GRID ROOFTOP SOLAR POWER WORKS WITH NET-METERING SYSTEM AT SV2B, SV5B, IP4, IP5 AND IP7 STATIONS AT GAIL DBPL
2025_GAIL_227058_1
GAIL/BLR24-91/CP/ELECT/126342
Open Tender
Electrical Works
180 days
BANGALORE
Please refer Tender documents.
5 documents required · 5 mandatory
₹0
₹92,000
Yes
GAIL BANGALORE
28 Apr 2026
17 Feb 2025
6 Mar 2025
17 Feb 2025
5 Mar 2025
24 Feb 2025
24 Feb 2025
Amount
SOLAR POWER SYSTEM WORKS SV-2B (BENGALURU)
Design , supply installation and commissioning of 40Kwp Solar System as per scope of works and bill of material - PV MODULES
Design , supply installation and commissioning of 40Kwp Solar System as per scope of works and bill of material - INVERTER (NON REDUNDANT)
SOLAR POWER SYSTEM WORKS SV-2B (BENGALURU)
Design , supply installation and commissioning of 40Kwp Solar System as per scope of works and bill of material - BROUGHT OUT ITEMS
Supply installation and commissioning of 40Kwp Solar System as per scope of works and bill of material - Gross metering and Liasioning charges for obtaining statutory approvals and statutory payments and synchronisation etc., for Net metering from BESCOM & Electrical Inspector.
Supply installation and commissioning of Solar System as per scope of works :- Electrical Panel suitable for solar with CT PT Erectionas per site requirement condition.
SOLAR POWER SYSTEM WORKS at SV-5B ,IP-04 ,IP05 & IP 07
Design , supply installation and commissioning of 6Kwp Solar System as per scope of works and bill of material - PV MODULES
Design , supply installation and commissioning of 6Kwp Solar System as per scope of works and bill of material - INVERTER (NON REDUNDANT)
SOLAR POWER SYSTEM WORKS at SV-5B ,IP-04 ,IP05 & IP 07
Design , supply installation and commissioning of 6Kwp Solar System as per scope of works and bill of material - BROUGHT OUT ITEMS
Supply installation and commissioning of 6Kwp Solar System as per scope of works and bill of material - Gross metering and Liasioning charges for obtaining statutory approvals and statutory payments and synchronisation etc., for Net metering from BESCOM/HESCOM & Electrical Inspector.
S K ENGINEERING AND CONSTRUCTION COMPANY INDIA PVT LTD (BID ID -823845)
Rushikesh Raghunath Todkar (BID ID -825147)
stage.html
html • 0.05 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.32 MB
TENDER.pdf
Tender Documents • 1.67 MB
CBA.xls
Other Document • 0.06 MB
BOQ_254812.xls
BOQ • 0.26 MB
FORMS.pdf
Additional Documents • 0.33 MB
Download all tender documents and submit your bid