| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹23.6 LAccepted-Finance 239 PHASE 2 MODEL TOWN BATHINDA BATHINDA PUNJAB 151001 | BATHINDA | PUNJAB | 151001 | ₹23.6 L | L1 | Accepted-Finance Lowest and Reasonable bid. |
| 2 | L2₹24.3 L+₹71,300 (3.02%)Rejected-Finance | ₹24.3 L+₹71,300 (3.02%) | L2 | Rejected-Finance Other than the lowest bid. |
| 3 | L3₹24.9 L+₹1.4 L (5.77%)Rejected-Finance | ₹24.9 L+₹1.4 L (5.77%) | L3 | Rejected-Finance Other than the lowest bid. |
| 4 | L4₹27.7 L+₹4.1 L (17.6%)Rejected-Finance | ₹27.7 L+₹4.1 L (17.6%) | L4 | Rejected-Finance Other than the lowest bid. |
| Sl No | Description | Qty | Unit | AXIS SALES L4 | ABHINANDAN ENTERPRISES L3 | SARASWATI CONSTRUCTION CO L1 | ASHWANI SETHI L2 |
|---|---|---|---|---|---|---|---|
| 1.00 | Taking out liquid/solid content/ soil/garbage from sump/septic tank and sewage lines either manually or by pumping cleaning thoroughly incl disposal of liquid/solid/soil/garbage content out of the Cantt Area and covering with layer of earth complete all as specified and directed. (Note: For de-sludging pumping/mechanical machine with closed container will be strictly used and not through any other means). | 600 | Cum | 89 ₹53,400 | 104 ₹62,400 | 70 ₹42,000 | 35 ₹21,000 Lowest |
| 2.00 | Provn of labour for opening cover of manhole / gully trap, floor trap / WHB / WC up to 1st manhole of any type and any size of mouth, any depth removing the sludge / solid content from the manholes / gully trap by manual / mechanical method. Contractor shall deploy minimum 02 ( two) Safaiwalas for this Area to carry out daily complaints and other works and cleaning the sewage line up to 1st manhole and incl all external sewage line in this total area of any dia and any depth either by water pressure, flushing with water or rodding and other suitable means at the discretion of the contractor at his own arrangement so as to remove the blockage and making the sewer lines and manholes /gully trap fully functional to the entire satisfaction of Engineer-in-charge and removing the sludge/ solid contents out side of defence land repositioning of the RCC / CI cover slab,grating all as directed.
(Note:- Bamboos will be strictly used for rodding purpose, all necessary tools and safety materials will be provided by the contractor and these all are deemed with this quoted rate). | 11 | Per Month | 49,999 ₹5,49,989 | 34,500 ₹3,79,500 Lowest | 41,000 ₹4,51,000 | 55,000 ₹6,05,000 |
| 3.00 | Surface excavation n.exc (not exceeding) 30 cm deep and averaging 15cm deep and getting out soft/loose soil as in settled soil/waste materials from drain and thrown away as directed. | 150 | Sqm | 19 ₹2,850 | 26 ₹3,900 | 25 ₹3,750 | 10 ₹1,500 Lowest |
| 4.00 | Surface excavation exc. 30 cm deep and averaging 25cm deep and getting out soft/loose soil as in settled soil/waste materials from drain and thrown away as directed. | 100 | Sqm | 29 ₹2,900 | 43 ₹4,300 | 25 ₹2,500 | 10 ₹1,000 Lowest |
| 5.00 | Excavation in trenches not exc 1.5m wide and not exc 1.5m deep for foundation etc for shafts, wells, cesspits, manholes pier holes, etc n exc 10 sqm on plan and n exc 1.5m in depth and getting out in soft/loose soil complete all as specified and directed. | 500 | Cum | 189 ₹94,500 | 103 ₹51,500 Lowest | 190 ₹95,000 | 145 ₹72,500 |
| 6.00 | All as per description of item No 5 above but for depth exc 1.5m and not exc 3m beyond the first 1.5m depth complete all as specified and directed. | 80 | Cum | 249 ₹19,920 | 129 ₹10,320 | 220 ₹17,600 | 100 ₹8,000 Lowest |
| 7.00 | Returning, filling in, including spreading, leveling, watering and well ramming in layers not exceeding 25 cms in soft /loose soil. | 400 | Cum | 99 ₹39,600 | 43 ₹17,200 | 50 ₹20,000 | 15 ₹6,000 Lowest |
| 8.00 | Removing excavated material n exc 50 m depositing where directed at a level n exc 1.5m above the starting point complete all as spd. | 180 | Cum | 9 ₹1,620 Lowest | 69 ₹12,420 | 50 ₹9,000 | 15 ₹2,700 |
| 9.00 | Demolition and breaking up drain pipes 150mm bore (salt glazed ware, AC or Reinforced) set in cement mortar all as spd and directed | 1,000 | RM | 9 ₹9,000 | 10 ₹10,000 | 5 ₹5,000 Lowest | 10 ₹10,000 |
| 10.00 | Demolition and breaking up drain pipes 200 mm bore (salt glazed ware, AC or Reinforced) set in cement mortar all as spd and directed | 800 | RM | 9 ₹7,200 | 20 ₹16,000 | 5 ₹4,000 Lowest | 10 ₹8,000 |
Tender Value
₹30 L
EMD Value
₹60,000
Closing Date
6 Aug 2026, 6:00 pmClosed
GE (WEST) JRC
Kabir Road, Jalandhar Cantt
CLEANING REPAIR OF SEWAGE LINES A3 OF AGE BR-I UNDER GE (WEST) JALANDHAR CANTT
2026_MES_778002_1
GE/JAL(W)-27/2026-27
Open Tender
Civil Works
Item Rate
335 days
JALANDHAR CANTT
Please refer Tender documents.
8 documents required · 8 mandatory
₹500
GE (WEST)
₹60,000
Yes
18 Aug 2026
11 Jul 2026
13 Aug 2026
11 Jul 2026
6 Aug 2026
25 Jul 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Taking out liquid/solid content/ soil/garbage from sump/septic tank and sewage lines either manually or by pumping cleaning thoroughly incl disposal of liquid/solid/soil/garbage content out of the Cantt Area and covering with layer of earth complete all as specified and directed. (Note: For de-sludging pumping/mechanical machine with closed container will be strictly used and not through any other means). | 600 | Cum | - | - |
| 2 | Provn of labour for opening cover of manhole / gully trap, floor trap / WHB / WC up to 1st manhole of any type and any size of mouth, any depth removing the sludge / solid content from the manholes / gully trap by manual / mechanical method. Contractor shall deploy minimum 02 ( two) Safaiwalas for this Area to carry out daily complaints and other works and cleaning the sewage line up to 1st manhole and incl all external sewage line in this total area of any dia and any depth either by water pressure, flushing with water or rodding and other suitable means at the discretion of the contractor at his own arrangement so as to remove the blockage and making the sewer lines and manholes /gully trap fully functional to the entire satisfaction of Engineer-in-charge and removing the sludge/ solid contents out side of defence land repositioning of the RCC / CI cover slab,grating all as directed.
(Note:- Bamboos will be strictly used for rodding purpose, all necessary tools and safety materials will be provided by the contractor and these all are deemed with this quoted rate). | 11 | Per Month | - | - |
| 3 | Surface excavation n.exc (not exceeding) 30 cm deep and averaging 15cm deep and getting out soft/loose soil as in settled soil/waste materials from drain and thrown away as directed. | 150 | Sqm | - | - |
| 4 | Surface excavation exc. 30 cm deep and averaging 25cm deep and getting out soft/loose soil as in settled soil/waste materials from drain and thrown away as directed. | 100 | Sqm | - | - |
| 5 | Excavation in trenches not exc 1.5m wide and not exc 1.5m deep for foundation etc for shafts, wells, cesspits, manholes pier holes, etc n exc 10 sqm on plan and n exc 1.5m in depth and getting out in soft/loose soil complete all as specified and directed. | 500 | Cum | - | - |
| 6 | All as per description of item No 5 above but for depth exc 1.5m and not exc 3m beyond the first 1.5m depth complete all as specified and directed. | 80 | Cum | - | - |
| 7 | Returning, filling in, including spreading, leveling, watering and well ramming in layers not exceeding 25 cms in soft /loose soil. | 400 | Cum | - | - |
| 8 | Removing excavated material n exc 50 m depositing where directed at a level n exc 1.5m above the starting point complete all as spd. | 180 | Cum | - | - |
| 9 | Demolition and breaking up drain pipes 150mm bore (salt glazed ware, AC or Reinforced) set in cement mortar all as spd and directed | 1,000 | RM | - | - |
| 10 | Demolition and breaking up drain pipes 200 mm bore (salt glazed ware, AC or Reinforced) set in cement mortar all as spd and directed | 800 | RM | - | - |
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.24 MB
BOQ_871339.xls
BOQ • 0.25 MB
TenderDocuments27.pdf
Tender Documents • 1.10 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .