Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | 1₹49,710.80Accepted-Finance BLOCK S HOUSE 75 MOHAN GARDEN WEST DELHI DELHI 110059 | WEST DELHI | DELHI | 110059 | 1 | Accepted-Finance LOWEST FIRST | |
| 2 | 2₹75,000+₹25,289.20 (50.9%)Accepted-Finance B 708 NEO HEIGHTS DR LOHIA MARG CIVIL LINES PRAYAGRAJ | PRAYAGRAJ | PRAYAGRAJ | UTTAR PRADESH | 211002 | 2 | Accepted-Finance LOWEST SECOND |
| Sl No | Description | Qty | Unit | M/S KSHITIJ ENTERPRISES L1 | Marc vision infrasolutions pvt. ltd. L2 |
|---|---|---|---|---|---|
| 1.00 | Preliminary Survey by using GPS or DGPS etc. including preparation of schedule of material, marking of location (Route Length), GPS survey of line with co-ordinates of each Tower (The length of line shall be authenticated by GPS survey). This work included :- | 4.2 | Km. | 9,779 ₹41,071.8 Lowest | 15,000 ₹63,000 |
| 1.01a. Root Map (Colured showing B Line and two alternate root using existing root. | |||||
| 1.02b. Tower Profile | |||||
| 1.03c. Tower schedule | |||||
| 1.04d. Tower SLD | |||||
| 1.05e. Tower spotting and optimization work includes submission of all report in 04 Copies in divisional/Circle office. | |||||
| 2.00 | After survey, Soil investigation (All kind of Soil) of 01 No. from proposed tower foundation. Note:- submission of all report in 04 copies in divisional office. | 1 | LOC | 8,639 ₹8,639 Lowest | 12,000 ₹12,000 |
Tender Value
₹49,711
EMD Value
₹1,000
Closing Date
28 Sept 2026, 5:00 pmClosed
Suprintending Engineer
Superintending Engineer Electricity Transmission Circle I 57 George Town Prayagraj 211002 PH- 0532-2256499/9415311005
Survey for shifting work of 400 KV S/C Rewa Road-Panki line (in between Tower No. 512-523) under Electy. Trans. Division-I, Prayagraj
2026_UPTCL_1183643_1
07-ETC-I(P)/ 2026-2027
Open Tender
Survey
Item Rate
90 days
ETD-I
Please refer Tender documents.
2 documents required · 2 mandatory
₹590
SE ETC-I PRAYAGRAJ
₹1,000
30 Sept 2026
8 Sept 2026
29 Sept 2026
8 Sept 2026
28 Sept 2026
8 Sept 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Preliminary Survey by using GPS or DGPS etc. including preparation of schedule of material, marking of location (Route Length), GPS survey of line with co-ordinates of each Tower (The length of line shall be authenticated by GPS survey). This work included :- | 4.2 | Km. | - | - |
| 1.01 | a. Root Map (Colured showing B Line and two alternate root using existing root. | - | - | - | - |
| 1.02 | b. Tower Profile | - | - | - | - |
| 1.03 | c. Tower schedule | - | - | - | - |
| 1.04 | d. Tower SLD | - | - | - | - |
| 1.05 | e. Tower spotting and optimization work includes submission of all report in 04 Copies in divisional/Circle office. | - | - | - | - |
| 2 | After survey, Soil investigation (All kind of Soil) of 01 No. from proposed tower foundation. Note:- submission of all report in 04 copies in divisional office. | 1 | LOC | - | - |
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.03 MB
TD.pdf
Tender Documents • 0.33 MB
BOQ_2226218.xls
BOQ • 0.27 MB
07.pdf
PDF • 0.28 MB
date07.pdf
PDF • 0.27 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .