Loading…
Loading…
Tender Value
₹4.3 L
EMD Value
₹8,579
Closing Date
4 Jul 2026, 3:00 pm5d left
Similar tender results from the same govt authority in the past 3 years.
Assistant Engineer, Malda Highway Sub Division
Singatala, Malda
Temporary restoration work on the flank on Kotwali Ferryghat to Pukuria Ferryghat Road in between chainage 5.00 Kmp 7.00 Kmp under Malda Highway Division during the year 2026-27.
2026_WBPWD_5015889_1
eNIT-03/2026-27/AE/MHSD/PW(R)D
Open Tender
CIVIL WORKS
15 days
Malda
Please refer Tender documents.
3 documents required · 3 mandatory
₹8,579
Yes
23 Jun 2026
23 Jun 2026
6 Jul 2026
23 Jun 2026
4 Jul 2026
23 Jun 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Supplying Eucalyptus-bullah piles at work site, including dressing and making one end pointed.
ii) 125mm diameter
A)Main Post@150 mm C/C | 934.5 | Mtr. | 145 | ₹1,35,502.5 |
| 2 | i) 100 mm diameter | 136 | Mtr. | 96 | ₹13,056 |
| 3 | Labour for driving Eucalyptus bullah piles by monkey from pontoon or boats in sorts of soil including hoisting and placing piles in position, protecting the pile head with iron ring and cutting and shaping heads before and after driving and including hire and labour for necessary driving appliances and all tackles.
ii) 125mm diameter | 626.12 | Mtr. | 92 | ₹57,603.04 |
| 4 | i) 100 mm diameter | 23.45 | Mtr. | 83 | ₹1,946.35 |
| 5 | Labour for fitting and fixing 10 cm. to 13 cm. diameter Sal-bullah/Eucalyptus-bullah as ties and runners including necessary nails, bolts and nuts.
At Ch.6.144 kmp (From Bridge End)
For Tie & Runner | 101 | Mtr. | 20.6 | ₹2,080.6 |
| 6 | Filling empty Cement bags with dry Silver Sand, stitching the bag (cost of thread included) and carrying and placing them in position and all incidental charges complete, including cost of stone dust with grit and gunny bags.
At Ch.6.144 kmp (From Bridge End) | 10,733 | Bag | 13.95 | ₹1,49,725.35 |
| 7 | Add GST @18 % | 18 | Percentage | - | - |
| 8 | Add Labour Welfare Cess @1% | 1 | Percentage | - | - |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.52 MB
AllDocuments.pdf
Other Document • 0.01 MB
Form2911.pdf
Tender Documents • 0.29 MB
BOQ_5084945.xls
BOQ • 0.33 MB
Download all tender documents and submit your bid