Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹20.0 LAccepted-AOC | ₹20.0 L Quoted ₹39.9 L | L1 | Accepted-AOC lowest quoted bidder |
| 2 | L1₹20.0 LAccepted-AOC | ₹20.0 L Quoted ₹39.9 L | L1 | Accepted-AOC lowest quoted bidder |
| 3 | L1₹39.9 LRejected-Finance C O SRI HANUMAN PRASAD BAJAJ WARD NO 02 U T ROAD P O DIST UDALGURI BTC ASSAM | UDALGURI | ASSAM | 784113 | ₹39.9 L | L1 | Rejected-Finance work not allotted |
| 4 | L1₹39.9 LRejected-Finance | ₹39.9 L | L1 | Rejected-Finance work not allotted |
Tender Value
₹44.3 L
EMD Value
₹88,685
Closing Date
12 Dec 2022, 12:00 pmClosed
CHD, Irrigation, BTC
o/o the CHD, Irrigation, BTC, Kokrajhar
Construction of 10.00 m Slab Culvert( Two Numbers) at Chainage 7132.00 m and 9866.00 m of D1 Canal for ERM, Sukla Irrigation Project under PMKSY-AIBP for the year 2021-22
2022_BoTC_27838_86
CHDI/ET/2022-23/2
Open Tender
Civil Works
Works
180 days
At Sukla FIS
Please refer Tender documents.
3 documents required · 3 mandatory
₹1,000
₹88,685
Yes
30 Aug 2023
24 Nov 2022
12 Dec 2022
24 Nov 2022
12 Dec 2022
26 Nov 2022
Amount
At Chainage 7132 at D1 Canal:- Earthwork in excavation trenches of walls, retaining walls, footing of columns, steps and septic tank including refilling (return filling) the quantity as necessary after completion of works, breaking clods in return filling, dressing, ramming, watering etc. and removal of surplus earth with all lead and lift upto 2 metre as directed and specified in following classification of soils, including bailing out of water where necessary upto depth below the existing ground level as mentioned in the approved drawing and complete as directed and specified. A. In ordinary soil
Cement concrete work in proportion 1:2:4 in foundation / abutment / piers / wing walls etc. with hard river shingles of size 6 mm to 20 mm including curing, bailing out water with necessary timber shuttering, scaffolding etc. where necessary, completeas directed. (Shuttering, scaffolding cost will be paid separately)
RCC work in slab, abutment cap and above abutment, pier cap, pedestal, dirt wall etc. in proportion 1:1½:3 with hard river shingles of size 6 mm to 20 mm with proper reinforcement as per design including necessary curing etc. complete as directed with necessary timber shuttering, scaffolding etc. where necessary, complete as directed. (Shuttering, scaffolding cost will be paid separately).
Supplying, fitting, fixing and laying reinforcement (TATA) in position in RCC work including cutting, bending, cranking with two piles 0.91 M (20 BWG) annealed wire hooking, tying, complete as directed.
Machine mixing charge of cement concrete / reinforced cement concrete with different types of concrete mixture machine of 10 / 7 CuFt capacity.
Vibrating in CC/RCC work with vibrator including local carriage of vibrator etc. complete as directed.
Centering and shuttering including propping etc. where necessary and removal of forms after completion of CC and RCC works, complete as directed. (Measurement to be taken on the face area timbered). Shuttering (Beam) with Prop.
12 mm cement plastering including clearing surface and curing, complete as directed (ii) In proportion 1:4
]Supplying, fitting and fixing in position true to line and level elastomeric bearing conforming to IRC:83 (Part-II) Section IX complete, including all accessories as per drawings and technical specification Clause 1207.1
Earth work in back filling of structure obtained from outside borrow pits filling in 15cm layers, ramming, dressing, watering including paying compensation of land if any (with lead upto 30.0 m and lift 1.50m).
Earthwork in filling in all soils in plinth, canal embankment and bed filling as per design section and grade by truck carriage for a minimum distance of 4 KM including paying compensation of earth obtained from private land if any loading, unloading, spreading the same including light jungle, removing trees upto 15 cm dia and uprooting roots and stumps etc. from the seat of the embankment, breaking clods not more than 10 mm cube, ramming, profiling etc. with all lift, complete as directed. (Payment will be made after deduction of 12.50 % shrinkage allowance from the gross quantity).
At Chainage 9866 at D1 Canal:- Earthwork in excavation trenches of walls, retaining walls, footing of columns, steps and septic tank including refilling (return filling) the quantity as necessary after completion of works, breaking clods in return filling, dressing, ramming, watering etc. and removal of surplus earth with all lead and lift upto 2 metre as directed and specified in following classification of soils, including bailing out of water where necessary upto depth below the existing ground level as mentioned in the approved drawing and complete as directed and specified. A. In ordinary soil
Cement concrete work in proportion 1:2:4 in foundation / abutment / piers / wing walls etc. with hard river shingles of size 6 mm to 20 mm including curing, bailing out water with necessary timber shuttering, scaffolding etc. where necessary, completeas directed. (Shuttering, scaffolding cost will be paid separately)
RCC work in slab, abutment cap and above abutment, pier cap, pedestal, dirt wall etc. in proportion 1:1½:3 with hard river shingles of size 6 mm to 20 mm with proper reinforcement as per design including necessary curing etc. complete as directed with necessary timber shuttering, scaffolding etc. where necessary, complete as directed. (Shuttering, scaffolding cost will be paid separately).
Supplying, fitting, fixing and laying reinforcement (TATA) in position in RCC work including cutting, bending, cranking with two piles 0.91 M (20 BWG) annealed wire hooking, tying, complete as directed.
Machine mixing charge of cement concrete / reinforced cement concrete with different types of concrete mixture machine of 10 / 7 CuFt capacity.
Vibrating in CC/RCC work with vibrator including local carriage of vibrator etc. complete as directed.
Centering and shuttering including propping etc. where necessary and removal of forms after completion of CC and RCC works, complete as directed. (Measurement to be taken on the face area timbered). Shuttering (Beam) with Prop.
12 mm cement plastering including clearing surface and curing, complete as directed (ii) In proportion 1:4
]Supplying, fitting and fixing in position true to line and level elastomeric bearing conforming to IRC:83 (Part-II) Section IX complete, including all accessories as per drawings and technical specification Clause 1207.1
Earth work in back filling of structure obtained from outside borrow pits filling in 15cm layers, ramming, dressing, watering including paying compensation of land if any (with lead upto 30.0 m and lift 1.50m).
Earthwork in filling in all soils in plinth, canal embankment and bed filling as per design section and grade by truck carriage for a minimum distance of 4 KM including paying compensation of earth obtained from private land if any loading, unloading, spreading the same including light jungle, removing trees upto 15 cm dia and uprooting roots and stumps etc. from the seat of the embankment, breaking clods not more than 10 mm cube, ramming, profiling etc. with all lift, complete as directed. (Payment will be made after deduction of 12.50 % shrinkage allowance from the gross quantity).
Nripen Ch Deka
BHISMA KR DANGAL
ASHOK KUMAR BAJAJ
stage.html
html • 0.05 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .