Loading…
Loading…
| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹8.5 LAdmitted-Fee/PreQual/Technical/Finance | +0.00% | ₹8.5 L | L1 | Admitted-Fee/PreQual/Technical/Finance |
| 2 | L1₹8.5 LAdmitted-Fee/PreQual/Technical/Finance | +0.00% | ₹8.5 L | L1 | Admitted-Fee/PreQual/Technical/Finance |
| 3 | L1₹8.5 LAdmitted-Fee/PreQual/Technical/Finance | +0.00% | ₹8.5 L | L1 | Admitted-Fee/PreQual/Technical/Finance |
| 4 | L1₹8.5 LAdmitted-Fee/PreQual/Technical/Finance | +0.00% | ₹8.5 L | L1 | Admitted-Fee/PreQual/Technical/Finance |
| 5 | L1₹8.5 LAdmitted-Fee/PreQual/Technical/Finance | +0.00% | ₹8.5 L | L1 | Admitted-Fee/PreQual/Technical/Finance |
Tender Value
₹8.5 L
EMD Value
₹8,475
Closing Date
29 Jul 2026, 5:00 pmClosed
Divisional Officer
RURAL WORKS DIVISION, BALASORE
Sagan to Padmapur road_Road_PMC, Sealcoat in stretches_0.516 to 1.639
2026_CERWI_136251_1
01SERWBLS2026-27 (Bid-01-67)
Open Tender
Civil Works - Roads
Percentage
90 days
Balasore
2 documents required · 2 mandatory
₹4,000
₹8,475
Yes
3 Sept 2026
20 Jul 2026
30 Jul 2026
20 Jul 2026
29 Jul 2026
20 Jul 2026
20 Jul 2026 - 29 Jul 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earth work in excavation of foundation in hard soil with all leads and lifts and to required depth including dressing and levelling the bed and depositing the excavated materials away from work site etc.complete as per direction of the Engineer-in-charge. | 133.1 | cum | 282.88 | ₹37,650.2 |
| 2 | Filling foundation and plinth with sand well watered and rammed including cost & conveyance of materials, labour ,T&P, royalty & taxes etc.complete as per direction of the Engineer-in-charge. | 15.72 | cum | 857.11 | ₹13,473.77 |
| 3 | Providing P.C.C. (1:3:6) in foundation with 4cm size h.g. metal of approved quality including hoisting laying concrete, formwork, cost & conveyance of materials, labour ,T&P, royalty, taxes, curing etc. complete as per direction of the Engineer-in-charge. | 7.86 | cum | 6,429.73 | ₹50,537.68 |
| 4 | Providing R.C.C. M-20 using 20mm & down graded size h.g. chips of approved quality including hoisting laying concrete with rigid smooth centering / shuttering, necessary scaffolding, cost & conveyance of materials, labour, T&P royalty, taxes, curing but excluding cost of reinforcement etc. complete as per direction of the Engineer-in-charge. | 52.15 | cum | 8,991.7 | ₹4,68,917.16 |
| 5 | Providing & fixing in position MS / High yield deformed bars reinforcement of Fe 500 grade of SAIL make with cutting, bending, binding, straightening and tying the grills and placing in position including binding wire 18 to 20 gauge, cost & conveyance of materials,labour, T &P etc. complete as per direction of the Engineer-in-charge. | 28.27 | qtl | 9,719.13 | ₹2,74,759.81 |
| 6 | Filling foundation and plinth with excavated materials well watered and rammed etc.complete as per direction of the Engineer-in-Charge | 13.76 | cum | 155.61 | ₹2,141.19 |
stage.html
html • 0.06 MB
finance_602096.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_2.pdf
PDF • 2.22 MB
Tendernotice_1.pdf
PDF • 1.41 MB
BOQ_602096.xls
BOQ • 0.29 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .