Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹3.5 CrAdmitted-Finance | ₹3.5 Cr | L1 | Admitted-Finance |
| 2 | L2₹3.7 Cr+₹20.3 L (5.75%)Admitted-Finance | ₹3.7 Cr+₹20.3 L (5.75%) | L2 | Admitted-Finance |
| 3 | L3₹3.7 Cr+₹20.3 L (5.76%)Admitted-Finance | ₹3.7 Cr+₹20.3 L (5.76%) | L3 | Admitted-Finance |
| 4 | L4₹3.9 Cr+₹31.6 L (8.95%)Admitted-Finance | ₹3.9 Cr+₹31.6 L (8.95%) | L4 | Admitted-Finance |
| 5 | L5₹4.2 Cr+₹69.9 L (19.8%)Admitted-Finance | ₹4.2 Cr+₹69.9 L (19.8%) | L5 | Admitted-Finance |
| Sl No | Description | Qty | Unit | GANGA ELECTRICALS L4 | KHAN ENTERPRISES L5 | RAKESH ELECTRIC WORKS,ECID L1 | M/S Sushil Kumar L6 | AMIT ENGINEERING CORPORATION L7 | RAPID POWER SOLUTIONS L2 | Piyush Enterprises L3 |
|---|---|---|---|---|---|---|---|---|---|---|
| 0.00SUPPLY OF MATERIALS FOR CONSTRUCTION OF 33 KV LINE | ||||||||||
| 1.00 | Single PCC Pole 9.0 m long | 40 | No. | 2,39,960 ₹2,83,152.8 | 2,20,000 ₹2,59,600 | 1,80,000 ₹2,12,400 Lowest | 2,43,200 ₹2,86,976 | 2,40,000 ₹2,83,200 | 1,89,862.4 ₹2,24,037.63 | 2,00,000 ₹2,36,000 |
| 2.00 | Single STP Pole 11 (SP-55) m long | 8 | No. | 1,35,992 ₹1,60,470.56 | 1,60,000 ₹1,88,800 | 96,000 ₹1,13,280 Lowest | 1,67,936 ₹1,98,164.48 | 1,64,000 ₹1,93,520 | 1,56,611.84 ₹1,84,801.97 | 1,12,000 ₹1,32,160 |
| 3.00 | Single STP Pole 09 m long | 68 | No. | 8,83,932 ₹10,43,039.76 | 9,52,000 ₹11,23,360 | 5,71,200 ₹6,74,016 Lowest | 10,09,664 ₹11,91,403.52 | 10,19,320 ₹12,02,797.6 | 8,86,978.4 ₹10,46,634.51 | 9,52,000 ₹11,23,360 |
| 4.00 | MS Earthing Road 20x2500 mm | 116 | No. | 57,884 ₹68,303.12 | 1,16,000 ₹1,36,880 | 53,360 ₹62,964.8 Lowest | 60,784 ₹71,725.12 | 59,160 ₹69,808.8 | 59,633.28 ₹70,367.27 | 69,600 ₹82,128 |
| 5.00 | 33 KV V-type Cross arm | 32 | No. | 51,168 ₹60,378.24 | 46,400 ₹54,752 | 41,600 ₹49,088 | 55,296 ₹65,249.28 | 51,200 ₹60,416 | 88,919.04 ₹1,04,924.47 | 32,000 ₹37,760 Lowest |
| 6.00 | Top channel 125x65mm 3200 mm (10.70 Kg./mtr.) with Clamp | 12 | No. | 43,188 ₹50,961.84 | 21,600 ₹25,488 | 43,200 ₹50,976 | 41,772 ₹49,290.96 | 43,200 ₹50,976 | 74,135.04 ₹87,479.35 | 18,000 ₹21,240 Lowest |
| 7.00 | 33 KV Disc fitting | 42 | No. | 12,558 ₹14,818.44 | 21,000 ₹24,780 | 12,600 ₹14,868 | 12,600 ₹14,868 | 13,860 ₹16,354.8 | 12,983.04 ₹15,319.99 | 9,660 ₹11,398.8 Lowest |
| 8.00 | 33 KV Disc Insulator (70 Kn) Polymer | 42 | No. | 16,758 ₹19,774.44 | 21,000 ₹24,780 | 16,800 ₹19,824 | 13,020 ₹15,363.6 | 14,070 ₹16,602.6 | 13,265.28 ₹15,653.03 | 9,660 ₹11,398.8 Lowest |
| 9.00 | 33 KV Pin Insulator Polymer | 124 | No. | 49,476 ₹58,381.68 | 62,000 ₹73,160 | 44,640 ₹52,675.2 | 56,420 ₹66,575.6 | 84,320 ₹99,497.6 | 78,467.2 ₹92,591.3 | 43,400 ₹51,212 Lowest |
Tender Value
₹4.6 Cr
EMD Value
₹4.6 L
Closing Date
9 Nov 2022, 1:00 pmClosed
Superintending Engineer
Superintending Engineer, E.W.C., 177, Alenganj, Prayagraj
SUPPLY OF MATERIALS AND ERECTION FOR CONSTRUCTION OF 33 KV INDEPENDENT LINE FROM 132 KV S/S BHUPIYAMAU TO DISTRICT HOSPITAL, PRATAPGARH UNDER DEPOSIT SCHEME ON FULL TURNKEY BASIS
2022_PVVNV_741889_1
09/EWCP/2022-23
Open Tender
Electrical Works
Turn-key
360 days
Pratapgarh
SUPPLY OF MATERIALS AND ERECTION FOR CONSTRUCTION OF 33 KV INDEPENDENT LINE FROM 132 KV S/S BHUPIYAMAU TO DISTRICT HOSPITAL, PRATAPGARH UNDER DEPOSIT SCHEME ON FULL TURNKEY BASIS
2 documents required · 2 mandatory
₹5,900
Account Number - 914020010003107
₹4.6 L
Yes
17 Nov 2022
24 Oct 2022
10 Nov 2022
24 Oct 2022
9 Nov 2022
24 Oct 2022
SUPPLY OF MATERIALS FOR CONSTRUCTION OF 33 KV LINE
Single PCC Pole 9.0 m long
Single STP Pole 11 (SP-55) m long
Single STP Pole 09 m long
MS Earthing Road 20x2500 mm
33 KV V-type Cross arm
Top channel 125x65mm 3200 mm (10.70 Kg./mtr.) with Clamp
33 KV Disc fitting
33 KV Disc Insulator (70 Kn) Polymer
33 KV Pin Insulator Polymer
ACSR DOG conductor
Complete Stay (GI stay rod 20x1800 mm, stay wire 7/8 SWG 10 kg, stay clamp, bolt, nut & washer) with concret grouting
GI wire 6 SWG for guarding and earthing
Bracing angle 65x65x6x3000 mm with clamp
Guarding angle 65x65x6x3800 mm with clamp
33 KV XLPE cable 3x120 sqmm
Outdoor jointing kit 3x120 sqmm
Straight through cable jointing kit 3x120 sqmm
Cross arm holding clamp for 11 mtr STP/PCC 9 mtr.
33 KV F-Bracket
Danger Board with clamp
G.I. Barbed wire
Conceting of Pole
M.S. Nut Bolt with washer
Red Oxide Paint
Al. Paint
P.G. Clamp for dog conductor
E-Bracket
HDPE Pipe 6" dia 6 mtr. long
G.I. Pipe 6" dia 10 feet long
I hook 60 mm
M.S. Channel 100x50x2240 mm
Droper Angle 100x50x2000 mm
Holding clamp for M.S. Channel & Dropper Angle
ERECTION OF WORK AS PER RESSPO NORMS.
Pole to Pole survey of complete line route for fixing the location of line support section pole angle support crossing support etc. above work to be done by the contractor before starting the line work.
Digging of pits of size 0.45x1.25x 1.85 mtr. for erection of PCC/STP Pole 9/11 mtr. long for making S/P,D/P,T/P, F/P, Xing HT/LT line and canal etc
Erection of single pole P.C.C. 09 mtr long at X rings.
Fabrication and erection of double pole of S.T.poles for riser (3x120sqmm XLPE cable) 9mtr. long.
Fabrication and erection of double pole of S.T.poles 11 mtr long.
Fabrication and erection of double pole of P.C.C. poles 09 mtr long.
Fabrication and erection of four-pole of S.T.poles 11 mtr long.
Fabrication and erection of four-pole of P.C.C. poles 09 mtr long.
Mounting and fitting of V-type cross arm, 33 KV pin, pin insulator, earth clamp complete in all respect as per drawing of RESPO on single PCC pole 9 mtr long and single S.T. pole 11 mtr long. Cross arm, Pin, Pin insutator, cross arm cramp, Danger board with clamp shall be provided by contactor. (As per respo specifications.)
Fabrication, mounting and fitting of top channel, bracing made of m.s. angle, earth clamp, 33 KV pin & pin insulators, disc insulator and disc fitting on P.C.C. and S.T.P. double pole. Top channel bracing M.S. angle, 33 KV pin and pin Insulator. Disc Insulator and disc fitting, Earth clamp, stay clamp, top channel clamp, bracing clamp, danger board etc. shall be provided by the contractor. (As per respo specifications.)
Fabrication, mounting and fitting of top channel, bracing made by M.S. angle, earth clamp, danger board, pin and pin insulators, disc and disc fitting on four pole structures. PCC 9 mtr./ STP 11 mtr. Top channel bracing, pin and pin insulator, disc and disc fitting, Stay clamp, Top channel clamp, Bracing clamp, earth clamps and danger board etc. shall be provided by the contractor. (As per respo specifications.)
Grouting of single S.T./P.C.C. support 11 mtr long with cement, sand and brick ballast in ratio 1:4:8 size 0.45x 0.45x1.85 mtr deep under the ground and 0.45x 0.45x 0.45 mtr above the ground including plastering and polishing with neat cement (It includes the Grouting of ST/PCC poles of single pole support, double poles, tripole and four pole structures.) Cement, sand, brick, ballast shall be provided by the contractor. (As per respo specifications.)
Digging of pits of size 0.60x 0.60x1.2 mtr and grouting the stay rod anchor plates 0.45x 0.45x 0.45 mtr with cement, Jamuna sand and brick ballast ratio 1:4:8 as per drawing No. RES-16. Cement, sand, brick, ballast shall be provided by the contractor. (As per respo specifications.)
Complete fitting of stay rod and fastening stay wire including fitting of stay clamp, turn buckle, and making ring of stay wire on both ends in seven strands 9” to 12” long. Stay clamp, Turn buckle shall be provided by the contractor. (As per respo specifications.)
Earthing of single PCC/ ST pole by digging 1.00 mtr deep pit and driving the electrodes of MS earth rod and connecting all the metallic parts of poles with earthing rod by G.I. wire and filling pits with soil after completion of earthing.earth wire/ G.I. wire M.S.rod shall be provided by contractor.
Work of road, canals, telephones and H.T. line crossing by providing guarding angles/channels on supports and fabrication and fiting of guarding net as per drawing No. 48 with G.I. wire No. 8/10 SWG, Granding angle except granding angle and G.I. wire all other materials provided by the contractor. (As per respo specifications.)
Laying of A.C.S.R. Dog conductor with the help of aluminium roller by hanging three nos. on each support in a manner taking sufficient care to ensure safety of A.C.S.R. Dog conductor against rubbing on ground, precaution for safety of crops is also to be taken. The work includes jointing of Conductor by providing jointing sleaves, stringing of conductor upto correct sag and binding of conductor with insulators on each support. All material required for above work shall be provided by contractor such as jointing sleeve binding wire, armour rod etc . (As per respo specifications.)
Painting of single support, double poles with fittings and tripole/four poles with fittings of 11.0 mtr. long STP with two coat of red oxite primer and one coats of good quality aluminium paints giving silver white finish below the cross Arm/ Droper channel.
Single support STP 11 Mtr. long.
STP Pole 9 Mtr Long
(Necessary paints will be supplied by the contractor.)
Laying of 33 KV 3x120 sqmm XLPE cable with providing, fixing and interconnecting 6 Mtrs. long pieces of PN-6 HDPE pipe of suitable dia by trenchless method below the ground level of 1 mtr. to 1.5 mtr. in hot mixed road (2x1400 mtr.)
Laying lifting hosting and looping of 33 KV 3x120 sqmm XLPE cable in 6” dia G.I. pipes by fixing in air on poles with suitable clamping & grouting. G.I. pipe of 6” dia, 3 mtr. long would be provide by contractor.
Fixing of 33 KV 3x120 sqmm heat shrinkable termination end kit ( termination end kit be provided by the contractor)
Fixing of heat shrinkable Straigst trough cable jointing kit 3x120 sqmm ( termination end kit be provided by the contractor)
3x120 sqmm XLPE Cable laying in trench from 33kv bay into switch yard 132 kv sub-station gadwara to double pole S.T.P. out of 132 KV switch yard & inside of primises to Dist. Hospital Pratapgarh including brick, sand, clamps etc. (2x6170 mtr.+100 mtr single service cable for metering)
Erection and commissioning of 33 KV pilfer unit Capacity 50/1A
Installation and commissioning of outdoor 33 KV CT/PT unit 50/1Amp.
Safe Loading carriage and Safe unloading of following line materials from Electy. Store Center Naini Prayagraj/ Pratapgarh to dump site store. The materials will be provided as per availability and in piece meal.
33 KV 3x120 mm2 XLPE Cable
33 KV CT/PT units
33 KV pilfer unit Capacity 50/1A
Other centrally procured items as per requirement for construction of line (Disc, Disc fitting, X-arm. Pin, Pin Insulator, stay rod, earth rod, M.S. rod, G.I wire etc.
Trimming of tree branch big/small branch which is laying in alignment of 33 KV line from 132 KV S/S Bhupiyamau to Tapping point 33 KV Link Line Dist. Hospital, Pratapgarh
Big Branch
Small Branch
Jumpring of 33 KV line on 33 KV Bay using P.G. Clamp dog to dog & dog conductor & binding of jumper and other accessories on terminal gantry at 132 KV S/S Bhupiyamau Disst.Pratapgarh. Binding wire & P.G. Clamp, Aluminium Lug etc. provided by Contractor.
RAPID POWER SOLUTIONS
Piyush Enterprises
GANGA ELECTRICALS
KHAN ENTERPRISES
M/S Sushil Kumar
AMIT ENGINEERING CORPORATION
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .