| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹9.9 LAccepted-AOC | ₹9.9 L Quoted ₹8.4 L | L1 | Accepted-AOC Being L1 |
| 2 | L2₹10.3 L+₹1.9 L (23.2%)Rejected-Finance | ₹10.3 L+₹1.9 L (23.2%) | L2 | Rejected-Finance Not Being L1 |
| 3 | L3₹12.7 L+₹4.3 L (51.4%)Rejected-Finance | ₹12.7 L+₹4.3 L (51.4%) | L3 | Rejected-Finance Not Being L1 |
| 4 | L4₹12.7 L+₹4.4 L (52.2%)Rejected-Finance AT BONGA ITKHORI CHATRA | CHATRA | JHARKHAND | 825103 | ₹12.7 L+₹4.4 L (52.2%) | L4 | Rejected-Finance Not Being L1 |
| 5 | L5₹13.0 L+₹4.6 L (55.5%)Rejected-Finance GURUDWARA COMPLEX MAIN ROAD BISHRAMPUR PO BISHRAMPUR DISTT SURAJPUR C G | ₹13.0 L+₹4.6 L (55.5%) | L5 | Rejected-Finance Not Being L1 |
Tender Value
₹19.7 L
EMD Value
₹24,650
Closing Date
19 Nov 2022, 5:00 pmClosed
Chief Manager (Civil)
Chief Manager (Civil) G.M. Office SECL Bishrampur Area
Providing and fixing of Concertina coil fencing with repairing of boundary wall of Rehar UG Mine of RGK Sub Area.
2022_SECL_261047_1
GM/BSPR/Civil/e-tender/ 2022-23/34 Dt.01.11.2022
Open Tender
Civil Works - Others
Item Rate
90 days
RGK Sub Area
As Per NIT
3 documents required · 3 mandatory
₹24,650
20 Dec 2022
2 Nov 2022
21 Nov 2022
2 Nov 2022
19 Nov 2022
3 Nov 2022
2 Nov 2022 - 12 Nov 2022
Amount
Providing and fixing concertina coil fencing with punched tape concertina coil 600 mm dia 10 metre openable length ( total length 90 m), having 50 nos rounds per 6 metre length, upto 3 m height of wall with existing angle iron ‘Y’ shaped placed 2.4m or 3.00 m apart and with 9 horizontal R.B.T. reinforced barbed wire, stud tied with G.I. staples and G.I. clips to retain horizontal, including necessary bolts or G.I. barbed wire tied to angle iron, all complete as per direction of Engineer-in-charge, with reinforced barbed tape(R.B.T.) / Spring core (2.5mm thick) wire of high tensile strength of 165 kg/ sq.mm with tape (0.52 mm thick) and weight 43.478 gm/ metre (cost of M.S. angle, C.C. blocks shall be paid separately)
Structural steel work in single section, fixed with or without connecting plate,including cutting, hoisting, fixing in position and applying a priming coat of approved steel primer all complete.
Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level :1:2:4 (1 cement : 2 coarse sand (zone-III) : 4 graded stone aggregate 20 mm nominal size)
Earth work in excavation by mechanical means (Hydraulic excavator)/manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including getting out and disposal of excavated earth lead upto 50 m and lift upto 1.5 m, as directed by Engineer-in-charge. All kinds of soil
Demolishing brick work manually/ by mechanical means including stacking of serviceable material and disposal of unserviceable material within 50 metres lead as per direction of Engineer-in-charge.In cement mortar
Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level :1:4:8 (1 Cement : 4 coarse sand (zone-III) : 8 graded stone aggregate 40 mm nominal size)
Providing and laying in position specified grade of reinforced cement concrete, excluding the cost of centering, shuttering, finishing and reinforcement - All work up to plinth level : 1:2:4 (1 cement : 2 coarse sand (zone-III) : 4 graded stone aggregate 20 mm nominal size)
Reinforced cement concrete work in walls (any thickness), including attached pilasters, buttresses, plinth and string courses, fillets, columns, pillars, piers, abutments, posts and struts etc. above plinth level up to floor five level, excluding cost of centering, shuttering, finishing and reinforcement : 1:1.5:3 (1 cement : 1.5 coarse sand(zone-III) : 3 graded stone aggregate 20 mm nominal size)
Reinforced cement concrete work in beams, suspended floors, roofs having slope up to 15° landings, balconies, shelves, chajjas, lintels, bands, plain window sills, staircases and spiral stair cases above plinth level up to floor five level, excluding the cost of centering, shuttering, finishing and reinforcement with 1:1.5:3 (1 cement : 1.5 coarse sand(zone-III) : 3 graded stone aggregate 20 mm nominal size).
Brickwork with F.P.S. brick of class designation 35 in superstructure above plinth level up to floor five level in : Cement mortar 1:6 (1 cement : 6 coarse sand )
Centering and shuttering including strutting, propping etc. and removal of form work for : Foundations, footings, bases for columns
Centering and shuttering including strutting, propping etc. and removal of form for : Lintels, beams, plinth beams, girders, bressumers and cantilevers
Centering and shuttering including strutting, propping etc. and removal of form for : Columns, Pillars, Piers, Abutments, Posts and Struts
Brickwork with F.P.S. brick of class designation 35 in foundation and plinth in : Cement mortar 1:6 (1 cement : 6 coarse sand )
12 mm cement plaster of mix :1:6 (1 cement: 6 fine sand)
Steel reinforcement for R.C.C. work including straightening, cutting, bending, placing in position and binding all complete upto plinth level.Thermo-Mechanically Treated bars of grade Fe-500D or more.
Total impact of GST for the purpose of CTC
APPORV TRADING
RAKESH ASSOCIATES
SUNIL KUMAR SINGH
IRFAN HAIDER
stage.html
html • 0.05 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
finance_269996.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .