Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹42,513Accepted-AOC | L1 | Accepted-AOC L1 bidder | |
| 2 | L2₹42,985.94+₹473.32 (1.11%)Rejected-Finance 15A2 1 INTUC 5 SANKARANKOVIL ROAD RAJAPALAYAM TALUK VIRUDHUNAGAR DISTRICT 626 117 | VIRUDHUNAGAR | TAMIL NADU | 626117 | L2 | Rejected-Finance Committee Decision |
Tender Value
₹46,000
EMD Value
₹1,000
Closing Date
24 Jun 2020, 3:00 pmClosed
Project Director,DRDA, Virudhunagar
DRDA, Virudhunagar
Repair/Renovation of Boys Toilet in PU Primary School at Rengapalayam Village of Watrap Block in Virudhunagar District in Package no. 72 under RCSIDS for the year 2019-20
2020_RDTN_164480_72
C6/1333/2020 dtd.21.05.2020
Open Tender
Civil Works
Works
120 days
Watrap Block
Two Cover System
Refer Tender Document
5 documents required · 5 mandatory
₹0
₹1,000
DRDA, Virudhunagar
26 Nov 2020
23 May 2020
24 Jun 2020
23 May 2020
24 Jun 2020
4 Jun 2020
4 Jun 2020
Amount
Paving the Floor with scratch proof ceramic tiles of size 305x305x6mm including cost and conveyance of all materials to site and all labour charges etc complete
Dadooing of walls with glazed tiles of size 15 cm x15cmx6mm laid in CM 1:2, 10mm thick & pointing with white cement using 0.4kg/cm2
Exterior Emulsion painting two coats with best approved quality and colour paint over one coat of Base coat including cost and convyance of all materials to work site and labour charges etc., complete.
Distembering two coats with best approved distember including cost and conveyance of all materials to site and all labour charges etc complete
Earth work excavation in all clauses of soil with initial lead of 10 m and initial lift 2 m except hard rock requiring blasting, etc., complete as per standard specification.
Cement concrete 1:4:8 mix using 40 mm ISS HBG metal including all cost and conveyance of materials, labour charges such as compaction, curing, etc., complete as per standard specification.
Brick work in CM 1:5 using country bricks including all cost and conveyance of materials, labour charges such as curing, etc., complete as per standard specification.
Centering charges for sides and soffits of R.C.C.works including labour etc., complete as per standard specification.
Reinforced cement concrete 1:1.5:3 mix using 20mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing, laying, and curing etc complete.
Supplying and fabrication of steel for R.C.C. works including all cost and conveyance of materials, labour charges such as cutting, bending, tying and placing in position, etc., complete as per standard specification.
GST Amount for providing Service to Government Contract Works for the above Works. { GST Amount is the Total GST Amount for total overall quoted amount above this row in column "BB" for all works in this package}
RAM CONSTRUCTIONS
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .