Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹2.1 LAccepted-Finance 25 PRATAP COMPLEX GULAB SINGH MARG JAMMU | L1 | Accepted-Finance Being Lowest Bidder | |
| 2 | L2₹2.2 L+₹4,400 (2.07%)Rejected-Finance BHAGWATI NAGAR JAMMU | L2 | Rejected-Finance Not Lowest | |
| 3 | L3₹2.2 L+₹5,375 (2.52%)Rejected-Finance BHAGWATI NAGAR JAMMU | L3 | Rejected-Finance Not Lowest |
Tender Value
Refer Docs
EMD Value
₹4,500
Closing Date
5 Feb 2021, 2:00 pmClosed
Executive Engineer
Executive Engineer MID jammu
Repairs rewinding to 630 kva electric transformer and allied works installed at LIS Nikowal new
2021_IFC_114461_1
MID/J/e-NIT/2020-21/82
Open Tender
Repair and Maintenance Works
Lump-sum
15 days
Nikowal New
As per tender notice
7 documents required · 7 mandatory
₹200
Executive Engineer MID Jammu
₹4,500
Yes
Jammu
17 Feb 2021
23 Jan 2021
6 Feb 2021
23 Jan 2021
5 Feb 2021
27 Jan 2021
23 Jan 2021 - 5 Feb 2021
25 Jan 2021
Amount
Shifting of 630 kva transformer by way of disconnecting of the electric transformer from the input and output power connections, lifting of electric transformer from its installed position by using manual labour, crane and then shifting to workshop by using carriage vehicle. Repairs to 630 kva transformer installed at LIS Nikowal new by way of dismantling of the transformer at workshop and extracting out the damaged coils, LT bushes, HT bushes, HT bush rods, LT bush rods and gasket. Repairs to the cooling fins of transformer by welding damaged and leaking portions. Rewinding of two number HT legs coils/ 8 number coils with standard gauge copper wire with proper insulation & taping. Reconditioning of two no’s LT leg coils using quality insulation material. Repairs to core of transformer by replacing the flashed core material. Heating to repaired transformer in oven to get required megger value. Properly cleaning the oil tank with scrubbers to remove all carbon deposits. Lowering of the coils inside the sump of the transformer. Providing and fitting of LT bush, HT bush, LT bush rods and HT bush rod sets, new insulator, and sundry items. Refitting of the top cover of transformer by providing and fitting of new gasket sheet. Providing/ filling of 550 liters of fresh transformer oil in oil tank. Testing the continuity of each phase and secure all connection. Shifting back after carrying out repaired transformer to site. Replacement of HT fuse sets installed at 630 kva sub station of Nikowal new by way of providing and fitting of HT fuse set on three incoming HT phases. Job includes replacement of HT conductors between HT fuse set and HT bush rods of transformer. Complete job includes cost of material, installation charges and skilled labour charges ,loading and un-loading of transformer at LIS Nikowal new and workshop, carriage charges of vehicle (to & fro), testing on no load/ full load , tools & tackles, hire charges of crane.
Rebate on Old Parts
PERFECT ELECTRICAL WORKS
M/S FASTTRACK ENGINEERS
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .