| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | 1₹15.5 LAccepted-AOC | 1 | Accepted-AOC L1 BIDDER | |
| 2 | 2₹15.7 L+₹20,100 (1.30%)Rejected-AOC | 2 | Rejected-AOC OTHER THAN L1 BIDDER | |
| 3 | 3₹16.1 L+₹60,300 (3.90%)Rejected-AOC | 3 | Rejected-AOC OTHER THAN L1 BIDDER | |
| 4 | 3₹16.1 L+₹60,300 (3.90%)Rejected-AOC | 3 | Rejected-AOC OTHER THAN L1 BIDDER | |
| 5 | 4₹19.6 L+₹4.1 L (26.6%)Rejected-AOC | 4 | Rejected-AOC OTHER THAN L1 BIDDER |
Tender Value
Refer Docs
EMD Value
₹62,000
Closing Date
7 Jan 2021, 6:00 pmClosed
GE SATWARI
GE SATWARI
MANNING AND OPERATION THROUGH OUTSOURCING OF SERVICES FOR RUNNING OF 33/11 KV SUB STATION AT 166 MH AND 11 KV AT RAIPUR SATWARI UNDER GE SATWARI
2020_MES_402491_1
GEJM-69/20-21
Open Tender
Electrical and Maintenance Works
Item Rate
335 days
GE SATWARI
Please refer Tender documents.
9 documents required · 9 mandatory
₹500
GE SATWARI
₹62,000
Yes
27 Feb 2021
10 Dec 2020
9 Jan 2021
10 Dec 2020
7 Jan 2021
24 Dec 2020
Amount
Outsourcing of services for running 11 KV Receiving cum Sub station in MH daily round the clock in 3 shifts ( 8 hours for each shift) by employing Electrician- 01 No in each shift, in 166 MH. The trademen has to rectify the faults and attend complaints pertaining to Ext elect Supply. The installation consists of the following:- (a) VCB 600 Amps - 3 No (b) VCB 400 Amps - 3 No (c) RMU 600 Amps - 1 No (d) LT Panel with Accessories -1 No (d) Transformer 3 phase of various capacities 500 to 160 KVA -13 Nos (e) HT/ LT overhead line/ UG Cables - 08 KM (f) VCB 1250 Amp - 05 Nos (g) Main Incommer 33 KV-01 No (j) Station transformer-01 No
Outsourcing of services for running 11 KV Receiving cum Sub station in MH daily round the clock in 3 shifts ( 8 hours for each shift) by employing Helper - 1 No in each shift, in 166 MH. The trademen has to rectify the faults and attend complaints pertaining to Ext elect Supply. The installation consists of the following:- (a) VCB 600 Amps - 3 No (b) VCB 400 Amps - 3 No (c) RMU 600 Amps - 1 No (d) LT Panel with Accessories -1 No (d) Transformer 3 phase of various capacities 500 to 160 KVA -13 Nos (e) HT/ LT overhead line/ UG Cables - 08 KM (f) VCB 1250 Amp - 05 Nos (g) Main Incommer 33 KV-01 No (j) Station transformer-01 No
Outsourcing of services for running 11 KV Receiving station daily in Raipur Satwari round the clock in 3 shifts ( 8 hours for each shift) by employing Electrician- 01 No No in each shift, in 166 MH. The trademen has to rectify the faults and attend complaints pertaining to Ext elect Supply. The installation consists of the following:- (a) VCB 1250 Amps - 4 No (b) Battery bank - 01 No (c) LT Panel with Accessories -1 No (d) Transformer 3 phase of various capacities - 13 Nos (e) HT/ LT overhead line/ UG Cables - 08 KM
Outsourcing of services for running 11 KV Receiving station daily in Raipur Satwari round the clock in 3 shifts ( 8 hours for each shift) by employing Hepler - 01 No in each shift, in 166 MH. The trademen has to rectify the faults and attend complaints pertaining to Ext elect Supply. The installation consists of the following:- (a) VCB 1250 Amps - 4 No (b) Battery bank - 01 No (c) LT Panel with Accessories -1 No (d) Transformer 3 phase of various capacities - 13 Nos (e) HT/ LT overhead line/ UG Cables - 08 KM
Note.for Srl No 1 to 4 :- (i) The contractor shall employ qualified electrician having ITI diploma from the recognised institution with minimun 2 years experience or having 7 years experience in related field in operation. (ii) The cost of maintenance of document, installation chart, daily records i.e., log sheet as clarified under relevant PS shall deemed to be included in rates quoted for the above items. (iii) Any breakdown/fault of electric supply will be attended by the tradesman employed by the contractor. All tools and T&P required by tradesman will be provided by the contractor (Such as bamboo ladder, tourch, search light, Axe, Dha, HT Gloves and other T&P required for working in HT/LT line/under ground cable) (iv) Contractor shall replace blown out fuse wire, HT Jumper and lead as and when required. The aspect shall be deemed to be included in the quoted rates and nothing extra shall be admissible on this account. (v) All the complaints lodge in the substation of external electric supply and internal electrical supply will be attended by contractor and will keep record of complaint slip attended . (vi) Electrician shall attend the telephone while on duty and will keep the record of complaints.
(vii) In case of operator/helper found absent from duty to any reason a penal recovery of double the rate quoted by the contractor pershift per person shall be made from contractor dues. Decision of acepting officer in this regard shall be final and binding. (viii) Proper shutdown will be taken by the electrician while attending fault/rewiring fuse element on DO fuse assy at MRS, Sub Station and GOD on two/Four poles structure as directed by Engineer-in-Charge. (ix) All the shifts shall also be monitored properlly by the contractor to avoid any delay in attending faults occurred at MRS. (x) The contractor will be fully responsible for safety, security of the worker and upkeep of installations. (xi) The contractor is also generally responsible for cleanliness of equipments inside the sub station complex and cleaning/cutting of grass at the surrounding areas of sub station and MRS. (xii) the contractor will also be responsible to attend complaints of internal electrification nature. (xiii) Emergency light will be provided by the contractor during night hours without any extra cost.
ARORA ENTERPRISES
BMMJ TRADERS AND ENGINEERS
M/S S K Electricals Regd
M/S J N TRADERS
stage.html
html • 0.06 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .