| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹23.0 LAccepted-Finance | ₹23.0 L | L1 | Accepted-Finance accept this is L1 |
| 2 | L2₹23 LRejected-Finance | ₹23 L | L2 | Rejected-Finance reject being higher rate |
| 3 | L3₹24.1 LRejected-Finance | ₹24.1 L | L3 | Rejected-Finance reject being higher rate |
| 4 | L4₹25.0 LRejected-Finance | ₹25.0 L | L4 | Rejected-Finance reject being higher rate |
| 5 | L5₹25.5 LRejected-Finance | ₹25.5 L | L5 | Rejected-Finance reject being higher rate |
| Sl No | Description | Qty | Unit | M/S DEEPAK KUMAR L1 | M/s Sanika Construction L3 | SHRISHTI ASSOCIATE L4 | ANIL KUMAR L6 | SOM SINGH NIRANJAN L5 | M/S AWADH CONSTRUCTION L2 |
|---|---|---|---|---|---|---|---|---|---|
| 1.00 | Boring of 30cm dia piles of Double reamed of 75cm dia of bulb and 4.5m depth in black cotton soil with hand operated auger machine including all labour and T&P etc. for proper completion of work. As per IS Code 2911 ( Part-iii) 1980 | 40 | No | 350 ₹14,000 | 355 ₹14,200 | 400 ₹16,000 | 400 ₹16,000 | 370 ₹14,800 | 2,250 ₹90,000 |
| 2.00 | Earth work in foundation of walls, piers, abutments etc. with disposal within 30-m lead and 1.5 m. lift-In Mar, Kabar and Rankar soil. | 51.6 | Cum | 250 ₹12,900 | 190 ₹9,804 | 250 ₹12,900 | 260 ₹13,416 | 250 ₹12,900 | 217 ₹11,197.20 |
| 3.00 | Providing and laying damp-proof course 50mm thick with cement concrete 1:2:4 (1 cement : 2 coarse sand (zone-III) derived from natural sources : 4 graded stone aggregate 20mm nominal size derived from natural sources). | 27.55 | Cum | 400 ₹11,020 | 352 ₹9,697.60 | 400 ₹11,020 | 430 ₹11,846.50 | 400 ₹11,020 | 339 ₹9,339.45 |
| 4.00 | Laying C.C. 1:2:4 per Cum i/c laying, ramming, curing and including cost of material, labour , T&P for proper comletion of work. | 22.24 | Cum | 4,200 ₹93,408 | 3,809 ₹84,712.16 | 4,300 ₹95,632 | 4,300 ₹95,632 | 4,200 ₹93,408 | 4,050 ₹90,072 |
| 5.00 | Providing and injecting chemical emulsion for preconstructional antitermite treatment and creating a chemical barrier under and alround the column pits wall trenches basement excavation top surface. | 51 | sqm | 190 ₹9,690 | 104 ₹5,304 | 180 ₹9,180 | 200 ₹10,200 | 180 ₹9,180 | 153 ₹7,803 |
| 6.00 | Steel reinforcement for R.C.C. work including straightening, cutting,bending, placing in position and binding all complete.(Mild steel and Medium Tensile steel bars) | 6,525.52 | kg | 65 ₹4.2 L | 58 ₹3.8 L | 70 ₹4.6 L | 85 ₹5.5 L | 80 ₹5.2 L | 67 ₹4.4 L |
| 7.00 | Centering & shuttering for R.C.C. slabs, lintels & simple beams including all materials & T&P | 423.58 | sqm | 380 ₹1.6 L | 380 ₹1.6 L | 500 ₹2.1 L | 510 ₹2.2 L | 500 ₹2.1 L | 429 ₹1.8 L |
| 8.00 | R.C.C. work 1:1.5:3 per Cum i/c mixing laying and curing excluding centering,shuttering and reinforcement. and including cost of material, labour , T&P etc. With proper completion of work . | 98.25 | Cum | 5,000 ₹4.9 L | 5,800 ₹5.7 L | 5,300 ₹5.2 L | 5,700 ₹5.6 L | 5,600 ₹5.5 L | 4,865 ₹4.8 L |
| 9.00 | First class brick work in cement morter 1:4 (1cement: 4Sand) using 1st class building bricks i/c all cost of material,labour T&P etc.with proper ccompletion of work. | 90.87 | cum | 4,900 ₹4.5 L | 4,550 ₹4.1 L | 5,500 ₹5.0 L | 5,500 ₹5.0 L | 5,200 ₹4.7 L | 4,458 ₹4.1 L |
| 10.00 | 12.5 mm Thick cement Plaster in 1:4 cement mortar on brick masonry including cost of all material, labour & T&P required for completion of work . | 823.87 | sqm | 100 ₹82,387 | 140 ₹1.2 L | 120 ₹98,864.40 | 140 ₹1.2 L | 120 ₹98,864.40 | 117 ₹96,392.79 |
Tender Value
₹30.7 L
EMD Value
₹62,000
Closing Date
19 Jan 2026, 12:00 pmClosed
E.E. Tubewell Division first orai Jalaun
Office of E.E. Tubewell Division first orai Jalaun
CONSTRUCTION OF CAMP OFFICE CUM MEETING HALL AT TUBEWELL COLONY ORAI CAMPUS, DISTT- JALAUN
2026_UPIDM_1103896_1
1841/T.W.D.F.O./EE/25-26 date 24-12-2025
Open Tender
Civil Works
120 days
Orai
Please refer Tender documents.
2 documents required · 2 mandatory
₹854
₹62,000
30 Apr 2026
5 Jan 2026
19 Jan 2026
5 Jan 2026
19 Jan 2026
5 Jan 2026
Boring of 30cm dia piles of Double reamed of 75cm dia of bulb and 4.5m depth in black cotton soil with hand operated auger machine including all labour and T&P etc. for proper completion of work. As per IS Code 2911 ( Part-iii) 1980
Earth work in foundation of walls, piers, abutments etc. with disposal within 30-m lead and 1.5 m. lift-In Mar, Kabar and Rankar soil.
Providing and laying damp-proof course 50mm thick with cement concrete 1:2:4 (1 cement : 2 coarse sand (zone-III) derived from natural sources : 4 graded stone aggregate 20mm nominal size derived from natural sources).
Laying C.C. 1:2:4 per Cum i/c laying, ramming, curing and including cost of material, labour , T&P for proper comletion of work.
Providing and injecting chemical emulsion for preconstructional antitermite treatment and creating a chemical barrier under and alround the column pits wall trenches basement excavation top surface.
Steel reinforcement for R.C.C. work including straightening, cutting,bending, placing in position and binding all complete.(Mild steel and Medium Tensile steel bars)
Centering & shuttering for R.C.C. slabs, lintels & simple beams including all materials & T&P
R.C.C. work 1:1.5:3 per Cum i/c mixing laying and curing excluding centering,shuttering and reinforcement. and including cost of material, labour , T&P etc. With proper completion of work .
First class brick work in cement morter 1:4 (1cement: 4Sand) using 1st class building bricks i/c all cost of material,labour T&P etc.with proper ccompletion of work.
12.5 mm Thick cement Plaster in 1:4 cement mortar on brick masonry including cost of all material, labour & T&P required for completion of work .
Providing and fixing ISI marked flush door shutters conforming to IS :2202 (Part I) non-decorative type, core of block board construction with frame of 1st class hard wood and well matched teak 3 ply veneering with vertical grains or cross bands and face veneers on both faces of shutters.(35 mm thick including ISI marked Stainless Steel butt hinges with necessary screws)
Black Ganite( Polished) in big slab 20mm thick.
Supply of M.S. Angle iron door, windows ventilation frame made of approved M.S. angle iron wroght to required form including drilling hole, welding and recetting where necessary and also including supply of all material, such as steel hinges of required size, nut & bolts etc. and also including all taxes, wastage and one coat of red oxide paint complete in all respect as per direction of Engineer-in-charge for proper completion of work at site of work.
Supply & fixing fully glazed Aluminium frame window with all accessories & fittings/M2. with GI wire gauge mesh.
Providing and applying white cement based putty of average thickness 1 mm, of approved brand and manufacturer, over the plastered wall surface to prepare the surface even and smooth complete.
Wall Painting with Acrylic Interior emulsion paint in two coats of approved brand to give an even shade including priming coat of primer i/c all cost of material, labour and T&P etc.
Electrification Work with Havells Lifeline, Ploycab, finolex,Goldmedal etc Componet and wire etc. with Proper earthing.
Water supply & sanitary installation with Supereme,apollo,Vectus,Cera fitting etc.
Fabrication work for Hut Shape on roof with Clay tiles with Premium quality including Labour with all neccesary Material etc.
Please Enable Macros to View BoQ information
stage.html
html • 0.06 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 17.43 MB
tender08.pdf
Tender Documents • 17.41 MB
BOQ_2036256.xls
BOQ • 0.28 MB
Download all tender documents and submit your bid