Tender Value
₹8.6 L
EMD Value
₹11,000
Closing Date
29 Sept 2026, 12:00 pm2d left
General Manager Bankola Area
Office of The General Manager Bankola Area, PIN-713363
Installation of 3.3kV -550V UG Electrical substation at 21WL-20WD for SHCM packages belt, haulage, drill power circuit and 19EL-2ED for pump and drift drivage belt in RVIIA seam at Shyamsundarpur colliery under Bankola area.
2026_ECL_365465_1
ECL/GM/BA/E TENDER/26-27/ENM/65 Dt 15.09.2026
Open Tender
Electrical and Maintenance Works
Item Rate
45 days
Shyamsundarpur Colliery
Please refer Tender documents.
4 documents required · 4 mandatory
₹11,000
29 Sept 2026
15 Sept 2026
30 Sept 2026
15 Sept 2026
29 Sept 2026
15 Sept 2026
15 Sept 2026 - 20 Sept 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Discription of items | - | - | - | - |
| 2 | 315kVA, 3.3kV/550V FLP TSU No.1 Collection of trolleys and lifting to surface from RVIIA seam near bonbahal pump to workshop for loading of TSU and its breaker | 1 | LS | - | - |
| 3 | Dismantling of Primary breaker from TSU and loading the same on two sets of trolleys lifted from underground and transporting the same to pit top for lowering | 1 | LS | - | - |
| 4 | Dismantling of cage and lowering of transwitch unit and its breaker from pit top to pit bottom of pit no.3 (in RVII seam) and again refitting of cage after lowering. | 1 | LS | - | - |
| 5 | Transportation of transwitch unit and its breaker i) from pit bottom of pit no 3 to 4L/4WD (in RVII seam) over track line manually. Then from 4L/4WD (in RVII seam) to 9L/4WD (in RVII A seam)drift over track line and haulage (iv) then transportation from drift bottom at 9L/4WD to 16L/5WD over track line & haulage (v) transportation from 16L/5WD to 18EL/18WD over track line and haulage and to 21WL/20WD manually on floor. | 1 | LS | - | - |
| 6 | Assembling of TSU's primary breaker and placing it in position | 1 | LS | - | - |
| 7 | 315kVA, 3.3kV/550V FLP TSU No.2 Collection of trolleys and lifting to surface from RVIIA seam near bonbahal pump to workshop for loading of TSU and its breaker | 1 | LS | - | - |
| 8 | Dismantling of Primary breaker from TSU and loading the same on two sets of trolleys lifted from underground and | 1 | LS | - | - |
| 9 | Dismantling of cage and lowering of transwitch unit and its breaker from pit top to pit bottom of pit no.3 (in RVII seam) and again refitting of cage after lowering. | 1 | LS | - | - |
| 10 | Transportation of transwitch unit and its breaker i) from pit bottom of pit no 3 to 4L/4WD (in RVII seam) over track line manually. Then from 4L/4WD (in RVII seam) to 91/4WD (in RVII A seam)drift over track line and haulage (iv) then transportation from drift bottom at 9L/4WD to 18EL/1ED over track line & haulage and to 19EL/2ED manually on floor. | 1 | LS | - | - |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.05 MB
Tendernotice_1.pdf
PDF • 0.81 MB
Tendernotice_2.pdf
PDF • 1.27 MB
BOQ_378398.xls
BOQ • 0.27 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .