Loading…
Loading…
Tender Value
₹1.4 L
EMD Value
₹4,320
Closing Date
28 Sept 2026, 6:00 pmDue today
Executive Engineer Irrigation Division Anantnag
Office of the EXEN ID Anantnag
Construction bifurcations of Panzath- Sronsoo and Shampora- Dardikoot ladi.
2026_IFC_325694_4
E-NIT No. 23 of 2026-27
Open Tender
Civil Works
Percentage
12 days
ID Anantnag
Please refer Tender documents.
2 documents required · 2 mandatory
₹200
Executive Engineer Irrigation Division Anantnag
₹4,320
22 Sept 2026
22 Sept 2026
29 Sept 2026
22 Sept 2026
28 Sept 2026
22 Sept 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earth work in bulk excavation by manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 m2 on plan) including disposal of excavated earth lead upto 50 meters and lift upto 1.5 m, as directed by Engineer-in-Charge. All kinds of soil. | 12 | Cum | 592.9 | ₹7,114.8 |
| 2 | Silt clearance from canals. Inclusive of initial lead and lift ( 50m & 1.5m respectively ) Wet | 81 | Cum | 184.95 | ₹14,980.95 |
| 3 | Dumping stone including cost of stones. In Horizontal on level | 2.3 | Cum | 1,133.9 | ₹2,607.97 |
| 4 | Providing and laying in position cement concrete of specified grade including curing but excluding the cost of centring and shuttering. All work upto plinth level with: 1:2:4 (1 cement : 2 coarse sand : 4 graded stone aggregate 20 mm nominal size) | 13.5 | Cum | 6,591.25 | ₹88,981.88 |
| 5 | Centering and shuttering including strutting, propping etc. and removal of form work for: Foundations, footings, bases for columns | 54 | Sqm | 286.35 | ₹15,462.9 |
| 6Carriage of materials from source upto Road site of work by M.T.and 102 mtrs H.L | |||||
| 6.1 | Cement by an average lead of 05 km. | 4.32 | M.T | 328.75 | ₹1,420.2 |
| 6.2 | Sand by an average lead of 30km. | 6.08 | cum | 808.39 | ₹4,915.01 |
| 6.3 | Stone aggregates 20mm by an average lead of 14km. | 12.15 | cum | 619.45 | ₹7,526.32 |
| 6.4 | Stones by an average lead of 05km. | 2.3 | Cum | 575.04 | ₹1,322.59 |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.35 MB
BOQ_1101123.xls
BOQ • 0.27 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .