Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹50.7 LAccepted-AOC 102 STREET NO 10 1 SHAKTI NAGAR DERABASSI PB | ₹50.7 L | L1 | Accepted-AOC Agency Quoted less than departments justify rates. |
Tender Value
₹53.1 L
EMD Value
₹1.1 L
Closing Date
20 Jul 2026, 12:00 pmClosed
Exe. Engineer Roads Division No 3 MC Chandigarh
Exe. Engineer Roads Division No 3 MC Chandigarh
DISMANTLING AND RECONSTRUCTION OF FLOORING OF BACKSERVICE LANES IN SECTOR 18 B, C, D and SECTOR -19 B CHANDIGARH
2026_MCC_93680_2
MCC/2026/ROADS-III/06-20
Open Tender
Civil Works - Others
Percentage
120 days
Work
Please refer tender document
8 documents required · 8 mandatory
₹3,000
₹1.1 L
8 Sept 2026
13 Jul 2026
20 Jul 2026
13 Jul 2026
20 Jul 2026
13 Jul 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Demolishing concrete manually/ by mechanical means and disposal of material within 50 metres lead as per direction of Engineer in charge.Nominal concrete 1:3:6 or richer mix ( i/c equivalent design mix) (DSR 15.2.1) | 449.85 | Cum | 1,736 | ₹7,80,939.6 |
| 2 | Demolishing cement concrete manually/ by mechanical means including disposal of material within 50 metres lead as per direction of Engineer in charge Nominal concrete 1:4:8 or leaner mix DSR (15.2.2) | 193.9 | cum | 1,071 | ₹2,07,666.9 |
| 3 | Demolishing brick work manually/ by mechanical means including stacking of serviceable material and disposal of unserviceable material within 50 metres lead as per direction of Engineer-in-charge. In lime mortar (15.7.3) | 18.59 | Cum | 607 | ₹11,284.13 |
| 4 | Carriage of building rubbish by Mechancial transport incl. loading, unloading and stacking for lead upto 5 kms | 643.75 | Cum | 200 | ₹1,28,750 |
| 5 | Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level :1:5:10 (1 cement : 5 manufactured sand derived from Recycled Concrete Aggregate (RCA) : 10 graded stone aggregate 40 mm nominal size Recycled Aggregate (RA) (DSR 4.1.10 A) | 256.09 | Cum | 4,227 | ₹10,82,492.43 |
| 6 | Cement concrete pavement with 1:2:4 (1 cement : 2 coarse sand : 4 graded stone aggregate 20 mm nominal size), including finishing complete. | 400.15 | Cum | 6,514 | ₹26,06,577.1 |
| 7 | Extra for using 1:1.5:3 (1 cement : 1.5 coarse sand : 3 graded stone aggregate 20 mm nominal size)instead of 1:2:4 (1 cement : 2 coarse sand : 4 graded stone aggregate 20 mm nominal size) | 400.15 | Cum | - | - |
| 8 | Providing and fixing 5mm thick Asbestos strip of 65 mm thick wide for providing joints in concrete at regular interval.Complete in all respect of the entire satisfaction of engineer-in-charge. | 4,307.05 | Rmt | 67 | ₹2,88,572.35 |
| 9 | Credit of Material (Bricks) | - | Sqm | -3 | - |
| 9.1 | Brick Bats | - | Sqm | -700 | - |
stage.html
html • 0.04 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 12.84 MB
BOQ_115185.xls
BOQ • 0.26 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .