Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹45.9 LAccepted-AOC NO 9 1ST FLOOR C J N HERITAGE PWD MAIN ROAD AKASH NAGAR B NARAYANAPURA DOORAVANI NAGAR BANGALORE 560016 | BANGALORE | BENGALURU URBAN | KARNATAKA | 560016 | ₹45.9 L Quoted ₹46.2 L | L1 | Accepted-AOC deduction of credit |
| 2 | L2₹47.1 L+₹83,384 (1.80%)Rejected-Finance | ₹47.1 L+₹83,384 (1.80%) | L2 | Rejected-Finance rejected being L2 |
| 3 | L3₹47.1 L+₹85,449 (1.85%)Rejected-Finance NO S 7 2ND CROSS 2ND MAIN KEB LAYOUT SANJAYANAGAR BANGALORE 560094 | BENGALURU URBAN | KARNATAKA | 560094 | ₹47.1 L+₹85,449 (1.85%) | L3 | Rejected-Finance rejected being L3 |
| 4 | L4₹48.0 L+₹1.7 L (3.76%)Rejected-Finance DOOR NO IV 400 NEAR RAMANTHALI GHSS RAMANTHALI PO KANNUR 670308 | KANNUR | KERALA | 670308 | ₹48.0 L+₹1.7 L (3.76%) | L4 | Rejected-Finance rejected being L4 |
| 5 | L5₹49.8 L+₹3.6 L (7.70%)Rejected-Finance BUILDING NO FLAT NO 19 6TH CROSS ROAD SANJEEVINI NAGAR MUDALAPALYA BANGALORE 560072 | BANGALORE | BANGALORE | KARNATAKA | 560072 | ₹49.8 L+₹3.6 L (7.70%) | L5 | Rejected-Finance rejected being L5 |
Tender Value
Refer Docs
EMD Value
₹95,000
Closing Date
9 Oct 2020, 6:00 pmClosed
GE I R AND D East Bangalore
GE RD East Bangalore 93
REPAIR MAINTENANCE CENTRAL AC PLANT CHILLER PLANT PACKAGE TYPE AC PLANT AT CABS STIR DARE UNDER GE I RD EAST BANGALORE
2020_MES_378614_1
8973
Open Tender
Electrical and Maintenance Works
Item Rate
270 days
GE I R AND D East Bangalore
D c (i)
9 documents required · 9 mandatory
₹500
Yes
GE I R AND D East Bangalore
₹95,000
Yes
22 Dec 2020
18 Sept 2020
14 Oct 2020
18 Sept 2020
9 Oct 2020
4 Oct 2020
19 Sept 2020 - 30 Sept 2020
Amount
Materail and labour for cleaning of AHU cooling coil/condenser of 10 to 20TRcapacity for package AC plants by taking out pre filter frame, cleaning of cooling coil and air cooled condenser coil by caustic soda, cleaning of AHU dampers and refrigerant pipe lines and cleaning of cooling/condenser coil with fresh water, refixing all removed parts, testing, commissioning etc by authorised service agent of installed system, all as directed by Engineer - in - Charge
Supply and Fixing of dual core internal oil filter suitable for 150 TR/250 TR capacity chiller unit of carrier Make. Filtration Level - 3 µ, No. 06NA660028S
Supply and Fixing of external oil filter suitable for 150 TR/250 TR capacity chiller unit of carrier Make. Filtration Level - 10 µ. No. 30GX417132E
Supply and Fixing of drier suitable for 250/150 TR capacity chiller liquid line. No. XW12EA003
S&F in Replacement of Carrier make HP transducer. No. OP12DA039EE
S&F in Replacement of Carrier make LP transducer. No. OP12DA040EE
S&F in Replacement of Carrier make Oil pressure transducer. No. OP12DA040EE
S&F in Replacement of Carrier make Temperature Sensor. No. 30RB 660 036
Dismantling of existing screw compressor of 250 TR capacity carefully with using hydraulic jack & chain pulley, putting dummy plates to suction & discharge line & transporting to authorized workshop for repair, etc., all as directed.
Dismantling of burnt out winding from stator of screw compressor of chiller of 250 /150TR capacity compressor body, cutting, opening of burnt out winding, rewinding with same gauge of copper conductor of F class oil proof insulation applying one coat of varnish and kept at electrical oven and heated for 48 hours and refixing the same in original place and all as directed.
Dismantanling & shifting to store 2 nos AHU unit located at 3rd& 4th floor, complete set electrical acessories & fitting, by disconnecting/ removing of inlet & out let pipe lines of any size with water connection by gas cutting/cutting tool and refitting the same 100 mm pipe & water pipe from tank to water cooler plant smoothly to Ground & first Floor at AWE & C bulding CABS , dismantaling the damaged RCC tank with replacing of new sintex tank of capacity of 200ltrs with all necessories fitting & fixtures for smooth running water coller plant, dismantled AHU / pipe lines/electrical & acessories to be handing over to AGE store yard safetly dismantaled AHU & acessories all as directed by engineer - in charge
Pressure Testing each circuit of carrier make 30XA / 30GX model chiller for refrigerant leak by evacuating refrigerant gas from the circuit into the empty cylinder, leak testing of the circuit with nitrogen (N2) pressure by separating the entire system like low side, high side compressor condensers and rectifying the leakage vacummising re-charging of evacuated refrigerant gas and testing complete all as directed. Note: Topping up of gas will be measured and paid separately for DARE/ STIR
Complete Overhauling of one Compressor in 250 TR chiller unit by opening the compressor end plate, removing the gear assembly with gear puller, removing the hydraulic chamber, removing the twin screws using puller, removing the bearing sets, O rings, rotor, terminal bolts and stator. Clean the entire mechanical parts with approved cleaning agent and oil the parts. Checks all the mechanical parts for wear & tear and replace if required. Reassemble the dismantled parts carefully by using required tools and tackles. Refix the twin screws and checks the alignment of screws for smooth operation. Refix the stator along with terminals, fix the gear assembly and hydraulic chamber. Checks the alignment of screws and gear assembly for smooth rotation. Refix the endplates and tightened the bolts and complete the overhauling all as per standard procedure.
Supply and replacement of internal bearings suitable for carrier screw compressor by opening the compressor end plate, removing the gear assembly with gear puller, removing the hydraulic chamber, removing the twin screws using puller, removing the bearing sets, O rings, rotor, terminal bolts and stator. Clean the entire mechanical parts with approved cleaning agent. Replace the bearing sets as per standard procedure. Reassemble the dismantled parts carefully by using required tools and tackles. Refix the twin screws and checks the alignment of screws for smooth operation. Refix the stator along with terminals, fix the gear assembly and hydraulic chamber. Checks the alignment of screws and gear assembly for smooth rotation. Refix the endplates and tightened the bolts all as per standard procedure.
Supply and topping up of compressor oil suitable for carrier make screw Chiller (SW 220 grade Synthetic Screw Compressor Oil) DARE / STIR
Supply and topping up of 134A refrigerant gas DARE / STIR
Replacement of defective contactor for the condenser fan motor. (Siemens make 3RT1016 Contactor, 3pole, 10 Amps) for Carrier GX model Chillers DARE / STIR
Replacement of defective bearings of the condenser fan motor. No. 6204, 6205 (DARE / STIR)
Dismantling of winding from defective condenser fan motor and rewinding, with the same gauge of copper conductor and kept at electrical oven and heated for 48 hours, as required., all as specified and as directed. (DARE /STIR)
General servicing and preventive maintenance of the 150 TR chiller unit. Pressure cleaning of condenser coil, leak testing of the entire refrigeration circuit, checking the operations of all safety devices, cleaning of electrical contacts, checking the electric circuits all as directed at STIR
General servicing and preventive maintenance of the 250 TR chiller unit. Pressure cleaning of condenser coil, leak testing of the entire refrigeration circuit, checking the operations of all safety devices, cleaning of electrical contacts, checking the electric circuits all as directed at DARE
Replacement of defective contactor with new contactor 160 A, 3 Pole . (Make: Siemens 3TF51)
Replacement of defective contactor with new contactor 100 A, 3 Pole . (Make: Siemens 3TF48)
Replacement of defective contactor up to 32 A, with new contactor. (Make: L&T,Siemens, ABB)
Replacement of defective 'V' Belt upto SPA2240
Supply and topping up of R22 refrigerant gas CABS & STIR
Replacement of defective condenser contactor with new contactor. Make SEIMENS 3RT1016 3pole, 10 Amps for Carrier XA model Chillers
Replacement of defective EXV board of 30 XA / 30GX model Carrier make screw chiller by Isolation the power to the Chiller unit, Remove the connections to the EXV board carefully, remove the EXV board from the chiller control panel, Fix the new EXV board carefully and reconnect the connections to the EXV board complete all as per standard procedure.NOTE: The chiller unit 150 x 3/ 250 x3 TR controled by latest software (BMS) with all connected accessories. DARE / STIR
Replacement of defective Flow Sensor of 30 XA / 30GX model Carrier make screw chiller by Isolating the Butterfly valve, Remove the electrical conection carefully, remove the Flow sensor from the chilled water pipe line, Fix the new flow sensor carefully and reconnect the electrical connections to the flow sensor complete all as per standard procedure.
Replacement of defective Electronic Expansion valve of 30XA/30GX modle carrier make chiller by isolation the power to the chiller unit, Removing the connections of Electronic expansion valve carefully, isolate the refrigerant by closing the services valve, de-braze and removing the valve from ckt, fixing of new valve in the ckt with brazing,pressure testing the ckt, reconnecting the connections to the valve complete all as per standard procedure
Replacing of defective 22kw VFD of chiller water pump by isolation the power to pump panel removing the connections to VDF carefully, fix with new VDF reconnect the connections and re-commission the VDF al as per standard procedure, Make:- SEIMENS, Modle -SED222/32B ,or equalent
Replacement of defective Differential pressure switch for AHUs installed in STIR and DARE buildings all as per standard procedure. Make : SEIMENS for DARE building and SAUTER for STIR building
Repairing of defective SEIMENS make PXC22 controller by removig the controller from DARE / STIR building AHU 4 DDC panel and taking to service centre, repairing the defect, taking back and fixing it to the DDC panel all as per standard procedure.
Supply and fix removable type factory made metallic pre-filter of 20 microns of standard size with GI frame both side including removing of unserviceable metallic pre-filters all as directed. Make: AEROSOL/MAF/DYNA/JOHNFLOWER
Supply and fix factory made High Performance Bag Filters of 95% down to 5 micron of standard size with multiple-pockets & self supporting filter bags with MS/ GI/Anodised Aluminium Frame suitable for central air conditioning plant including replacement of bolt nuts and taking out unserviceable Bag filters complete all as directed by Engineer-in-charge. Make: Aerosol/ John Flower/ Dyna/ Sri Sai
Disconnecting and removing of the induction motor/pump set from the existing position of the following capacity of any make checking of the motor for its serviceability and transporting to workshop, opening up, cutting and removing of the burnt out winding, rewinding with same gauge of copper conductor insulating, varnishing, greasing etc., complete, reassemble, testing at work shop bring back to site re-fixing back in the original position reconnecting, testing and commissioning complete all as directed.
Above 10 HP capacity
5/7.5 HP capacity induction motor
Supply and fixing of bearing of the following capacity induction motor including removing of unserviceable bearing all as specified and as directed.
Above 10 HP capacity
75 HP capacity induction motor
Supply and fix overload relay for following capacity including taking down unserviceable overload relay etc all as directed
Up to 32 amps
63 amps to 100 amps
Supply and fix shaft seal assembly for any make and model of compressor including removing of the unserviceable shaft seal assembly and testing all as directed. Make :- ACCEL SMC 4-100 model
Supply and charging of compressor oil Servo Friz F-68 of Indian Oil or equivalent oil of Bharath Petroleum or Hindustan Petroleum all as directed.
Evacuating of refrigerant gas from the system into the empty cylinder for up to 50 TR capacity air conditioning plants leak testing of the plant with nitrogen(N2) pressure by separating the entire system like low side, high side compressor condensers and rectifying of the leakage vacumising re-charging of evacuated refrigerant gas and testing complete all as directed. Note : Toping up of refrigerant gas will be measured and paid separately.
Supply and fix loading / unloading solenoid valve 3 way type with 200V coil suitable for Kirloskar / Accel type model compressor including making of necessary flare connection replacement of adopters flare Nuts + connectors & including removing of unserviceable solenoid valve etc all as directed. Make :- Rotex/avcon
Supply and fixing the freezing thermostat (Chiller) 2 Deg to 12 Deg C and 5 Deg to 25 Deg C including removing of the unserviceable all as directed. Make :- Honeywell
Supply and fix suction discharging, oil pressure and water pressure gauges of 4/2” dia of the following range with necessary flare nuts, adopter including removing of the unserviceable all as directed. Make: KI/FEIBIG/H GURU. 0-150 / 0-300 PSI or equivalent in Kg/cm2
Supply and fix V-belts of the following sizes all as directed including removing unserviceable belt. Make : FENNER/DUNLOP/ VITTON/PIX
Up to B-120
Up to C-120
Up to A-36
Supply and fix pilot solenoid valve 3 way type with coil voltage 230 volts model S-180 including removing of unserviceable solenoid valve including testing all as directed.
Supply and fix syphon connection 15 mm dia made out of GI pipe with SS coating suitable for fixing of pressure gauge including ½ an inches dia stop valve and taking down unserviceable syphon connection etc all as directed.
Supply and fix water pressure cut out 0-8 kg pressures 15 mm dia including taking out unserviceable water pressure gauge etc all as directed.
Descaling of condensing unit upto 50 TR capacity AC plants by circulating descaling agent (HCL) acid through the condensers by forced feed method removing of the end covers of the condenser cleaning of each tube of condenser thoroughly by the bushing refixing back the end covers of the condensers by removing of the rubber gasket bolt nuts, cleaning of spray nozzles testing working pressure including arresting of water leakiges/ replacing of 25 mm pipe including fitting and fixture my welding / thirding etc all as directed.
Dismantling the existing unserviceable scroll compressor of capacity 5.5 TR carefully without disturbing the cooling coil with using gas cutting, supply and fix new scroll compressor of 5.5 TR capacity suitable for 5.5TR capacity package unit making necessary brazing including leak testing of package unit through dry Nitrogen Gas after charging the Nitrogen Gas pressure to be hold for 48 hours and vaccumizing the system including charging of Refrigerant gas R-22 of testing, commissioning etc., all as directed by Engineer-in-Charge. NOTE: Charging of refrigerant gas will be measured and paid separately under relevant item of schedule A.
Repairs to micro processor unit for 5.5 TR capacity package type AC plant by dismantling complete set of micro processor, checking thoroughly and replacing unserviceable parts like chip, capacitor, IC transform, display board unit as necessary, testing and re-fixing at original position, commissioning etc complete all as directed.
Supply and fix following pressure cut outs including taking out unserviceable cut outs etc all as directed.
LP/HP cut out
Oil pressure cut out
Water pressure cut out
Painting with one coat of enamel paint for complete package type AC plant of capacity 150TR completely to all connected items of the plant with different tent colour including motor of blowers/pipes lines/panels with different colour as existing colour yard at stir complex all as directed by Engr-in-Charge
Painting with one coat of enamel paint for complete package type AC plant of capacity 5.5TR completely to all connected items of the plant with different tent colour including motor of blowers/pipes lines/panels with different colour as existing colour yard at CABS all as directed by Engr-in-Charge
Painting with one coat of enamel paint for complete package type AC plant of capacity 3x50TR completely to all connected items of the plant with different tent colour including motor of blowers/pipes lines/panels/ water coller plant/ removing old fungi /dirty water in the tank with different colour as existing colour yard at CABS all as directed by Engr-in-Charge
Supply Digital Temperature Thermometer range -50 degree to + 150degree centigrade, all as directed by Engr- in- Charge , Make :-ISI Marked
Sahara Engineers
UNIVERSAL ENGINEERING
Sreekrupa Enterprises
RAHUL ENTERPRISES
stage.html
html • 0.06 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .