| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | 1₹3.5 CrAccepted-Finance NAYA GAON CHANDPUR BULANDSHAHAR UP | GONDA | UTTAR PRADESH | 271001 | ₹3.5 Cr | 1 | Accepted-Finance 1st lowest |
| 2 | 2₹3.8 CrRejected-Finance | ₹3.8 Cr | 2 | Rejected-Finance 2nd lowest |
| 3 | 3₹3.8 CrRejected-Finance | ₹3.8 Cr | 3 | Rejected-Finance 3rd lowest |
| 4 | 4₹4.1 CrRejected-Finance | ₹4.1 Cr | 4 | Rejected-Finance 4th lowest |
| 5 | 5₹4.2 CrRejected-Finance | ₹4.2 Cr | 5 | Rejected-Finance 5th lowest |
| Sl No | Description | Qty | Unit | M/S JAMEEL CONTRACTOR L2 | M/S VAISHNAVI CONSTRUCTION COMPANY L4 | ARUN CONSTRUCTION L5 | RAM NARAYAN YADAV L3 | M/S UNITE ENTERPRISES L1 |
|---|---|---|---|---|---|---|---|---|
| 1.00 | Cleaning thick Jungle and thorney bushes with uprooting from canal bank slope and counter berm and its proper disposal. | 91,040 | M² | 2.5 ₹2.3 L | 7 ₹6.4 L | 6.75 ₹6.1 L | 5 ₹4.6 L | 5.4 ₹4.9 L |
| 2.00 | Earth In Filling work by power transport for a lead up to 3.0 Km. Including excavation, loading, unloading, Royalty, with mechnical compaction and dressing including all lift etc | 76,188 | M³ | 249 ₹1.9 Cr | 232 ₹1.8 Cr | 238 ₹1.8 Cr | 180 ₹1.4 Cr | 217 ₹1.7 Cr |
| 3.00 | Providing and laying Geogrid Sheet Bi axial Extruded Geo gride of minimum tensile strength 15 KN/m in longitudinal and transeverse direction on slope of canal embankment for protection against soil erosion. | 1,53,398.75 | M² | 90 ₹1.4 Cr | 110 ₹1.7 Cr | 110 ₹1.7 Cr | 120 ₹1.8 Cr | 95 ₹1.5 Cr |
| 4.00 | Earth work in construction rainchute manualy or by other means whereever possible and applicable for channels below 1.00 cumec discharge including hard clay charri bajri up to 5% lead up to 30m lift up to 1.50m excluding mechanical compaction but inclusive of manual compaction and dressing to profile all as specified and directed. | 495.38 | M³ | 53 ₹26,255.14 | 80 ₹39,630.40 | 80 ₹39,630.40 | 55 ₹27,245.90 | 75 ₹37,153.50 |
| 5.00 | Centering & Shuttering work for P.C.C. Incluiding rent of Shuttering material, labour and T&P required for proper completion of work. | 1,981.5 | M² | 365 ₹7.2 L | 600 ₹11.9 L | 600 ₹11.9 L | 450 ₹8.9 L | 345 ₹6.8 L |
| 6.00 | Providing and laying in cement cocrete 1:3:6 with cement and coarse sand and 20-40mm stone grit. Including all material, labour and T&P etc. | 458.39 | M³ | 5,100 ₹23.4 L | 6,500 ₹29.8 L | 5,940 ₹27.2 L | 5,000 ₹22.9 L | 5,545 ₹25.4 L |
| 7.00 | Turfing Doob Grass on Slope of Embankment including watering | 1,53,398.75 | M² | 9.8 ₹15.0 L | 13 ₹19.9 L | 16.35 ₹25.1 L | 12 ₹18.4 L | 3.4 ₹5.2 L |
Tender Value
₹4.6 Cr
EMD Value
₹9.3 L
Closing Date
11 May 2026, 3:00 pmClosed
SE XII CIRCLE IRRIGATION WORKS LUCKNOW
GANGA SINCHAI BHAWAN TELIBAGH LUCKNOW
AS PER TENDER NOTICE LOT 7
2026_UPIDC_1145685_7
01/SE-XII/2026-27.
Open Tender
Civil Works
210 days
SITAPUR
Please refer Tender documents.
2 documents required · 2 mandatory
₹7,816
₹9.3 L
GANGA SINCHAI BHAWAN TELIBAGH LUCKNOW
20 Jun 2026
6 May 2026
11 May 2026
6 May 2026
11 May 2026
6 May 2026
8 May 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount | Item Code |
|---|---|---|---|---|---|---|
| 1 | Cleaning thick Jungle and thorney bushes with uprooting from canal bank slope and counter berm and its proper disposal. | 91,040 | M² | - | - | BI01010001010000000000000515BI0100001113 |
| 2 | Earth In Filling work by power transport for a lead up to 3.0 Km. Including excavation, loading, unloading, Royalty, with mechnical compaction and dressing including all lift etc | 76,188 | M³ | - | - | BI01010001010000000000000515BI0100001114 |
| 3 | Providing and laying Geogrid Sheet Bi axial Extruded Geo gride of minimum tensile strength 15 KN/m in longitudinal and transeverse direction on slope of canal embankment for protection against soil erosion. | 1,53,398.75 | M² | - | - | BI01010001010000000000000515BI0100001114 |
| 4 | Earth work in construction rainchute manualy or by other means whereever possible and applicable for channels below 1.00 cumec discharge including hard clay charri bajri up to 5% lead up to 30m lift up to 1.50m excluding mechanical compaction but inclusive of manual compaction and dressing to profile all as specified and directed. | 495.38 | M³ | - | - | - |
| 5 | Centering & Shuttering work for P.C.C. Incluiding rent of Shuttering material, labour and T&P required for proper completion of work. | 1,981.5 | M² | - | - | - |
| 6 | Providing and laying in cement cocrete 1:3:6 with cement and coarse sand and 20-40mm stone grit. Including all material, labour and T&P etc. | 458.39 | M³ | - | - | - |
| 7 | Turfing Doob Grass on Slope of Embankment including watering | 1,53,398.75 | M² | - | - | BI01010001010000000000000515BI0100001115 |
stage.html
html • 0.06 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.04 MB
TD7.pdf
Tender Documents • 2.28 MB
BOQ_2141906.xls
BOQ • 0.28 MB
Download all tender documents and submit your bid