| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | 1₹3.5 CrAccepted-AOC NAYA GAON CHANDPUR BULANDSHAHAR UP | GONDA | UTTAR PRADESH | 271001 | ₹3.5 Cr | 1 | Accepted-AOC 1ST LOWEST |
| 2 | 2₹3.8 CrRejected-Finance | ₹3.8 Cr | 2 | Rejected-Finance 2nd lowest |
| 3 | 3₹3.8 CrRejected-Finance | ₹3.8 Cr | 3 | Rejected-Finance 3rd lowest |
| 4 | 4₹4.1 CrRejected-Finance | ₹4.1 Cr | 4 | Rejected-Finance 4th lowest |
| 5 | 5₹4.2 CrRejected-Finance | ₹4.2 Cr | 5 | Rejected-Finance 5th lowest |
| Sl No | Description | Qty | Unit | M/S JAMEEL CONTRACTOR L2 | M/S VAISHNAVI CONSTRUCTION COMPANY L4 | ARUN CONSTRUCTION L5 | RAM NARAYAN YADAV L3 | M/S UNITE ENTERPRISES L1 |
|---|---|---|---|---|---|---|---|---|
| 1.00 | Cleaning thick Jungle and thorney bushes with uprooting from canal bank slope and counter berm and its proper disposal. | 91,040 | M² | 2.5 ₹2,27,600 Lowest | 7 ₹6,37,280 | 6.75 ₹6,14,520 | 5 ₹4,55,200 | 5.4 ₹4,91,616 |
| 2.00 | Earth In Filling work by power transport for a lead up to 3.0 Km. Including excavation, loading, unloading, Royalty, with mechnical compaction and dressing including all lift etc | 76,188 | M³ | 249 ₹1,89,70,812 | 232 ₹1,76,75,616 | 238 ₹1,81,32,744 | 180 ₹1,37,13,840 Lowest | 217 ₹1,65,32,796 |
| 3.00 | Providing and laying Geogrid Sheet Bi axial Extruded Geo gride of minimum tensile strength 15 KN/m in longitudinal and transeverse direction on slope of canal embankment for protection against soil erosion. | 1,53,398.75 | M² | 90 ₹1,38,05,887.5 Lowest | 110 ₹1,68,73,862.5 | 110 ₹1,68,73,862.5 | 120 ₹1,84,07,850 | 95 ₹1,45,72,881.25 |
| 4.00 | Earth work in construction rainchute manualy or by other means whereever possible and applicable for channels below 1.00 cumec discharge including hard clay charri bajri up to 5% lead up to 30m lift up to 1.50m excluding mechanical compaction but inclusive of manual compaction and dressing to profile all as specified and directed. | 495.38 | M³ | 53 ₹26,255.14 Lowest | 80 ₹39,630.4 | 80 ₹39,630.4 | 55 ₹27,245.9 | 75 ₹37,153.5 |
| 5.00 | Centering & Shuttering work for P.C.C. Incluiding rent of Shuttering material, labour and T&P required for proper completion of work. | 1,981.5 | M² | 365 ₹7,23,247.5 | 600 ₹11,88,900 | 600 ₹11,88,900 | 450 ₹8,91,675 | 345 ₹6,83,617.5 Lowest |
| 6.00 | Providing and laying in cement cocrete 1:3:6 with cement and coarse sand and 20-40mm stone grit. Including all material, labour and T&P etc. | 458.39 | M³ | 5,100 ₹23,37,789 | 6,500 ₹29,79,535 | 5,940 ₹27,22,836.6 | 5,000 ₹22,91,950 Lowest | 5,545 ₹25,41,772.55 |
| 7.00 | Turfing Doob Grass on Slope of Embankment including watering | 1,53,398.75 | M² | 9.8 ₹15,03,307.75 | 13 ₹19,94,183.75 | 16.35 ₹25,08,069.56 | 12 ₹18,40,785 | 3.4 ₹5,21,555.75 Lowest |
Tender Value
₹4.6 Cr
EMD Value
₹9.3 L
Closing Date
11 May 2026, 3:00 pmClosed
SE XII CIRCLE IRRIGATION WORKS LUCKNOW
GANGA SINCHAI BHAWAN TELIBAGH LUCKNOW
AS PER TENDER NOTICE LOT 7
2026_UPIDC_1145685_7
01/SE-XII/2026-27.
Open Tender
Civil Works
Fixed-rate
210 days
SITAPUR
Please refer Tender documents.
2 documents required · 2 mandatory
₹7,816
₹9.3 L
GANGA SINCHAI BHAWAN TELIBAGH LUCKNOW
1 Aug 2026
6 May 2026
11 May 2026
6 May 2026
11 May 2026
6 May 2026
8 May 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Cleaning thick Jungle and thorney bushes with uprooting from canal bank slope and counter berm and its proper disposal. | 91,040 | M² | - | - |
| 2 | Earth In Filling work by power transport for a lead up to 3.0 Km. Including excavation, loading, unloading, Royalty, with mechnical compaction and dressing including all lift etc | 76,188 | M³ | - | - |
| 3 | Providing and laying Geogrid Sheet Bi axial Extruded Geo gride of minimum tensile strength 15 KN/m in longitudinal and transeverse direction on slope of canal embankment for protection against soil erosion. | 1,53,398.75 | M² | - | - |
| 4 | Earth work in construction rainchute manualy or by other means whereever possible and applicable for channels below 1.00 cumec discharge including hard clay charri bajri up to 5% lead up to 30m lift up to 1.50m excluding mechanical compaction but inclusive of manual compaction and dressing to profile all as specified and directed. | 495.38 | M³ | - | - |
| 5 | Centering & Shuttering work for P.C.C. Incluiding rent of Shuttering material, labour and T&P required for proper completion of work. | 1,981.5 | M² | - | - |
| 6 | Providing and laying in cement cocrete 1:3:6 with cement and coarse sand and 20-40mm stone grit. Including all material, labour and T&P etc. | 458.39 | M³ | - | - |
| 7 | Turfing Doob Grass on Slope of Embankment including watering | 1,53,398.75 | M² | - | - |
stage.html
html • 0.07 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.04 MB
TD7.pdf
Tender Documents • 2.28 MB
BOQ_2141906.xls
BOQ • 0.28 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at [email protected].