| 1 | L1₹27.1 LAdmitted-Fee/PreQual/Technical/Finance | -6.11% | ₹27.1 L | L1 | Admitted-Fee/PreQual/Technical/Finance |
| 2 | L2₹28.9 LAdmitted-Fee/PreQual/Technical/Finance ADD 5 SARDAR PATEL MARG CIVIL LINES PRAYAGRAJ | PRAYAGRAJ | PRAYAGRAJ | UTTAR PRADESH | +0.10% | ₹28.9 L | L2 | Admitted-Fee/PreQual/Technical/Finance |
Tender Value
₹29.1 L
EMD Value
₹58,000
Closing Date
4 Aug 2026, 3:00 pmClosed
Executive Engineer
C.D. Prayagraj-02, U.P.A.V.P. Pratapgarh
CONSTRUCTION WORK OF SERVICE BLOCK (G PLUS 1) IN THE UNDER CONSTRUCTION THANA DILEEPPUR, DISTRICT PRATAPGARH.
2026_UPHDB_1171052_1
1377/L-11/167 Date 18.07.2026
Open Tender
Civil Works - Buildings
Percentage
120 days
Dileeppur
Please refer Tender documents.
2 documents required · 2 mandatory
₹1,770
Executive Engineer, C.D. Prayagraj-02, UPAVP.
₹58,000
4 Aug 2026
20 Jul 2026
4 Aug 2026
20 Jul 2026
4 Aug 2026
20 Jul 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Excavation in foundation in ordinary soil (loam clay or sand) including lift upto 1.50 meter and lead upto 30 meter and including filling, watering and ramming of excavated earth into the trenches or into the space between the building and sides of foundation trenches or into the plinth and removal and disposal of sur-plus earth as directed by the Engineer incharge up to a distance of 30 meters from the foundation trenches. | 1 | CUM | 140 | ₹139.86 |
| 2 | Providing and laying cement concrete 1:4:8 (1 cement :4 coarse sand :8 graded Stone aggregate 40 mm nominal size) including supply of all materials, labour T & P etc required for proper completion of the work and curing complete also including cost of formwork in foundation & floors. | - | CUM | 5,700 | - |
| - | Providing and injecting chemical emulsion for pre constructional antitermite treatment and creating a chemical barrier under and alround the column pits wall trenches basement excavation top surface if plinth filling junction of wall and floor, along the the external perimeter of binding expansion joints, surrounding of pipes and conduits etc, complete.(plinth area of the building at ground floor only shall be measured as per I.S.6313 (PartII 1981) Alderine emulsifiable concentrate or any other approved material such as Heptrachlor or Chlordane will be used. The rate of application of chemical emulsion shall be as follows : (1) Treatment for masonary & foundation 5 liters per sqm. (2) Back fill in immediate contact with foundation 7.5 liters/sqm (3) Treatment of top surface of plinth filling 5 liters/sqm (4) Treatment junction of wall and the floor 7.5 liters /sqm (5) Treatment of soil along external perimeter of building 7.5 liters/sqm (6) Treatment of soil under apron along external perimter 5 liters/sqm. (As per manufacturer's standard dilution) | - | SQM | 210 | - |
| - | R.C.C. work with cement approved coarse sand and 2 cm. guage approved stone grit in the proportion of 1:1.5:3 in lintels of doors and windows excluding supply of reinforcement and its fixing and binding the same with 24 BWG binding wire and including necessary centering and shuttering etc.and also including supply of all materials, labour and tools and plants etc, required for proper completion of the works. including cost of binding wire. The rate excludes making of drip course which shall be paid extra.
(a) Ground Floor | - | CUM | 8,300 | - |
| 4.01 | Same as above Item No. 4 but for First Floor. | - | CUM | 8,300 | - |
| - | As in item no. 4 above but for slabs (Using 1:1.5:3 Mix concrete)
(a) Ground Floor | - | CUM | 8,550 | - |
| 5.01 | Same as above Item No. 05 but for First Floor. | 1 | CUM | 8,550 | ₹8,541.45 |
| - | As in item NO 4 but for the lighter beams i.e. having spans upto 6 m. (Using 1:1.5:3 Mix concrete) (a) Ground Floor | - | CUM | 8,450 | - |
| 6.01 | Same as above Item-6 but for First Floor. | - | CUM | 8,450 | - |
| - | As in item-4 above but in R.C.C. Raft foundation and footing with approved stone ballast.(Using 1:1.5:3 Mix concrete) | - | CUM | 7,000 | - |
stage.html
html • 0.02 MB
finance_2197956.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 2.58 MB
BOQ_2197956.xls
BOQ • 0.43 MB
BID.pdf
Tender Documents • 24.32 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at [email protected].