| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹99.9 LAdmitted-Finance | ₹99.9 L | L1 | Admitted-Finance |
| 2 | L2₹1.2 Cr+₹16.6 L (16.6%)Admitted-Finance 3 4 520 TO 526 FLAT NO 303 PRAGATHI PRIDE APARTMENT BARKATHPURA HYDERABAD 500027 | HYDERABAD | TELANGANA | 500027 | ₹1.2 Cr+₹16.6 L (16.6%) | L2 | Admitted-Finance |
| 3 | L3₹1.3 Cr+₹26.3 L (26.3%)Admitted-Finance | ₹1.3 Cr+₹26.3 L (26.3%) | L3 | Admitted-Finance |
| Sl No | Description | Qty | Unit | SAI CONSTRUCTIONS L2 | BEKKAM CONSTRUCTIONS L1 | Hi-Tech Infrastructure L3 |
|---|---|---|---|---|---|---|
| 1.00Earth work in surface excavation not exceeding 30 cm in depth but exceeding 1.5 m in width as well as 10 sqm on plan including getting out and disposal of excavated earth upto 50 m and lift upto 1.5 m, as directed by Engineer-in- Charge: | ||||||
| 1.01 | All kinds of soil | 3,060 | Sqm | 90 ₹2,75,400 | 50 ₹1,53,000 Lowest | 235 ₹7,19,100 |
| 2.00Supplying and stacking at site. | ||||||
| 2.01 | Good earth | 200 | Cum | 450 ₹90,000 | 350 ₹70,000 Lowest | 400 ₹80,000 |
| 3.00 | Filling available excavated earth (excluding rock) in trenches, plinth, sides of foundations etc. in layers not exceeding 20cm in depth, consolidating each deposited layer by ramming and watering, lead up to 50 m and lift upto 1.5 m. | 200 | Cum | 225 ₹45,000 | 100 ₹20,000 Lowest | 600 ₹1,20,000 |
| 4.00Providing and applying tack coat using hot straight run bitumen of grade VG - 10, including heating the bitumen, spraying the bitumen with mechanically operated spray unit fitted on bitumen boiler, cleaning and preparing the existing road surface as per specifications | ||||||
| 4.01 | On bituminous surface @ 0.50 Kg /sqm | 40,500 | Sqm | 30 ₹12,15,000 | 28 ₹11,34,000 Lowest | 40 ₹16,20,000 |
| 5.00Providing and laying semi- dense Bituminous concrete using crushed stone aggregates of specified grading, premixed with bituminous binder and filler, transporting the hot mix to work site by tippers, laying with paver finisher equiped with electronic sensor to the required grade, level and alignment and rolling with smooth wheeled, vibratory and tandem rollers to achieve the desired compaction and density as per specification, complete and as per directions of Engineer-in-Charge. | ||||||
| 5.01 | 25 mm compacted thickness with bitumen of grade VG-30 @ 5% (percentage by weight of total mix) and lime filler @ 2% (percentage by weight of Aggregate) prepared in Batch Type Hot Mix Plant of 100-120 TPH capacity. | 40,500 | Sqm | 245 ₹99,22,500 | 205 ₹83,02,500 Lowest | 240 ₹97,20,000 |
| 6.00Painting road surface marking with adequate nos of coats to give uniform finish with ready mixed road marking paint conforming to IS : 164, on bituminous surface in white/yellow shade, including cleaning the surface of all dirt, scales, oil, grease and foreign material etc., complete. | ||||||
Tender Value
Refer Docs
EMD Value
₹2.3 L
Closing Date
6 Jan 2021, 2:00 pmClosed
R. Ravichandran, CCE
CCE (RnD) Estates South Chandrayangutta Hyderabad - 05
RESURFACING OF ROAD BETWEEN MANDA MALLAMMA SQUARE AND BALAPUR X ROADS, HYDERABAD
2020_DRDO_603520_1
CCERnDEST/ENQ/CIV/HYD/52/20-21
Limited
Miscellaneous Works
Item Rate
365 days
Balapur
Please refer Tender documents.
4 documents required · 4 mandatory
₹1,000
Yes
CCE (RnD) Estates South
₹2.3 L
Yes
10 Feb 2021
16 Dec 2020
7 Jan 2021
16 Dec 2020
6 Jan 2021
16 Dec 2020
Amount
Earth work in surface excavation not exceeding 30 cm in depth but exceeding 1.5 m in width as well as 10 sqm on plan including getting out and disposal of excavated earth upto 50 m and lift upto 1.5 m, as directed by Engineer-in- Charge:
All kinds of soil
Supplying and stacking at site.
Good earth
Filling available excavated earth (excluding rock) in trenches, plinth, sides of foundations etc. in layers not exceeding 20cm in depth, consolidating each deposited layer by ramming and watering, lead up to 50 m and lift upto 1.5 m.
Providing and applying tack coat using hot straight run bitumen of grade VG - 10, including heating the bitumen, spraying the bitumen with mechanically operated spray unit fitted on bitumen boiler, cleaning and preparing the existing road surface as per specifications
On bituminous surface @ 0.50 Kg /sqm
Providing and laying semi- dense Bituminous concrete using crushed stone aggregates of specified grading, premixed with bituminous binder and filler, transporting the hot mix to work site by tippers, laying with paver finisher equiped with electronic sensor to the required grade, level and alignment and rolling with smooth wheeled, vibratory and tandem rollers to achieve the desired compaction and density as per specification, complete and as per directions of Engineer-in-Charge.
25 mm compacted thickness with bitumen of grade VG-30 @ 5% (percentage by weight of total mix) and lime filler @ 2% (percentage by weight of Aggregate) prepared in Batch Type Hot Mix Plant of 100-120 TPH capacity.
Painting road surface marking with adequate nos of coats to give uniform finish with ready mixed road marking paint conforming to IS : 164, on bituminous surface in white/yellow shade, including cleaning the surface of all dirt, scales, oil, grease and foreign material etc., complete.
New work (Two or more coats)
SAI CONSTRUCTIONS
Hi-Tech Infrastructure
stage.html
html • 0.03 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .