Loading…
Loading…
Tender Value
₹9.7 L
EMD Value
₹19,300
Closing Date
28 Apr 2025, 3:00 pmClosed
No
No
Single Packet System
Normal Tender
No
Not Applicable
Lowest to Highest
60 days
Expenditure
Capital (Works)
TENDERCELL
13 conditions · 2 needing a document upload
N/A for this tender.
N/A for this tender
45 conditions · 1 needing a document upload
Please enter the percentage of local content in the material being offered. Please enter 0 for fully imported items, and 100 for fully indigenous items. The definition and calculation of local content shall be in accordance with the Make in India policy as incorporated in the tender conditions.
Consignee:
SSE/Tele/Exchange, N. E. Railway, Gorakhpur for Schedule A
SSE/Tele/S & T Lab, N. E. Railway, Gorakhpur for Schedule B
Site Engineer: ASTE/Tele/GKP
Inspection of Materials:
The material supplied shall be in strict accordance with the tender specifications and drawings.
Inspecting agency RDSO/RITES/Consignee for items to be supplied is given in schedule against each item.
As per Railway Board letter no. 2000/RS(G)/379/2 Dt. 06.09.2017, in case the total value of particular item having IRS/RDSO specification is Rs. Five (5.0) lakh or more, the item shall be inspected by RITES/RDSO. In case the total value of a particular item is less than Rs. Five (5.0) lakh, with/without having IRS specification the same shall be inspected by RITES/Consignee, subject to supplies being from sources approved by RDSO.
Materials to IRS Specification/drawing or to IS specification shall be inspected by the concerned inspecting officials of RDSO/ RITES. If equipment/material as per IRS Specification or IS specification in schedule, are to be inspected by authorized representative of the railways/consignee, the tenderer will require to furnish manufacturer's Guarantee certificate along with the test certificate. All other equipment /material, where neither IRS Specification nor IS specification is stipulated; shall be procured form reputed manufacture / their authorized dealers and shall be inspected by the authorized representative of concerned Dy. Chief Signal & Telecom Engineer, N.E. Railway, Gorakhpur, in the premises of manufacturer/tenderer before dispatch.
The equipment /material not possible to test by the consignee, the tenderer will require furnishing manufacturer's Guarantee certificate along with the test certificate.
The tenderer shall give a notice at least 10 days before, to the inspecting authority when the material is ready for inspection/ testing.
The authorized representative appointed to conduct inspection and tests of the material to be supplied, have full powers to reject if found complete material or part thereof, defective or of inferior workman ship or design and submit a report accordingly to concerned Dy. Chief Signal & Telecom Engineer, N. E. Railway, Gorakhpur
The tenderers shall provide all testing equipment/facilities necessary for conducting the required test.
If the product, upon arrival on destination, does not meet the requirement of the specifications, it may be rejected in spite of any inspection already conducted and the decision of concerned Dy. Chief Signal & Telecom Engineer, N. E. Railway, Gorakhpur, shall be final and binding in this regard and same shall not be called in question.
This inspection shall not be treated as final acceptance. The final acceptance of material and work shall be done by consignee (Authorized representative).
In case RDSO/RITES/ any other agency as specified in the schedule of quantity of each items, does not inspect an item on account of small value or show inability to inspect the materials for any reason, the same may be inspected by consignee or any other Railway representative nominated by contract signing authority.
Inspection charges for the items inspected by RDSO/RITES will be borne by Railway.
Completion of Entire Work: The entire work under the Scope of present tender shall be defined as completed after completion of following stages of work: -
All the items of schedule of work have been supplied, tested, inspected and accepted by consignee and a certificate issued for this purpose.
All the items supplied by the contractors or Railways as the case may be are Installed, tested, commissioned and put into service.
All the services have been successfully completed throughout the contractual period mentioned in schedule.
Mode of Payment:
For those items involving "Supply only":
90% of the accepted cost of material only, will be paid when the materials are supplied subject to furnishing of inspection 5.1.1 certificate and delivery challan/receipt order to the nominated Consignee and acceptance of the consignee.
Balance 10% of the accepted cost shall be paid only after successful commissioning of entire work.
For those items involving both "Supply and Installation":
80% of the accepted cost of material supplied will be paid when the materials are supplied subject to furnishing of inspection 5.2.1 certificate and delivery challan/receipt order to the nominated Consignee and acceptance of the consignee.
10% of the accepted cost shall be paid only after successful installation & testing of that item.
Balance 10% of the accepted cost shall be paid only after successful commissioning of entire work
For those items involving "Designing/Installation/Erection only":
90% of the accepted cost of work/services shall be paid after 5.3.1 successful execution of the item.
Balance10% of the accepted cost of work/services shall be paid only after successful commissioning of entire work/services.
Quoting of Rates:
Rates given in the schedule of the work for items in Annexure-VII are inclusive of all taxes (GST etc). Tenderer should also Quote their rates inclusive of all taxes (GST etc).
Supply, Installation, Testing & Commissioning of Various Telecom Material for Provision of Telecom facilities in Girls Inter Collage Gorakhpur, N. E. Railway.
N-235-62TeleTender03-2025
N-235-62TeleTender03-2025
Open
Works - General
3 Months
Gorakhpur, Uttar Pradesh
₹0
₹19,300
28 Apr 2025
19 Mar 2025
64 items across 2 schedules
| # | Description | Unit | Qty | Rate | Amount |
|---|---|---|---|---|---|
| — | — | — | 8,14,831.25 | ||
| — | 1.00 | — | — | ||
| Supply, Installation, Testing & commissioning of Layer-2 Managed 24 port PoE Switch having 4 uplink fiber ports along with supply of compatible SFPs. Min. switching capacity 128Gbps as per Sr. no. 1.0 of Technical Specification attached. Make- D-Link or Digisol or Cisco or Netgear or Zyxel or Equivalent or Higher. Inspection: Consignee | — | — | — | 38,081.98 | |
| — | 2.00 | — | — | ||
| Supply, Installation, Testing and Commissioning of Layer-2 , 8 Port POE based Switch having 8 Nos. 10/100/1000Base-T PoE port with 2 Nos. of SFP port. Minimum 120W PoE Budget with supply of 2 No's SFP Modules as per clause no. 14(III) of RDSO/SPN/TC/65/2021 Ver.6 with latest amendments, Version & as per Sr. no. 2.0 of Technical Specification attached . Make- D-Link or Digisol or Cisco or Netgear or Zyxel or Equivalent or Higher. Inspection: Consignee | — | — | — | 38,999.84 | |
| — | 1.00 | — | — | ||
| Supply and Installation of rack mountable 24 Port LIU with splicing and termination of OFC cables with all accessories as per Sr. no. 3.0 of Technical Specification attached. Pigtail and other materials required for work to be supplied by contractor. Make -Savitri Telecom or D-Link or Digisol or Raycom or Tyco or Equivalent or Higher. Inspection: Consignee | — | — | — | 5,971.49 | |
| — | 2.00 | — | — | ||
| Supply & Installation of FMS (12 F) rack mountable for termination of OFC cable with OFC patch cord & all other accessories including splicing work. It Shall comply with TEC GR No. TEC/GR/SLC- 01/02.AUG 05(TEC Standard Number: TEC52010:2005) with latest amendments, Version and as per Sr. no. 4.0 of Technical Specification attached. Make -Savitri Telecom or D-Link or Digisol or Raycom or Tyco or or Equivalent or Higher. Inspection: Consignee | — | — | — | 12,054.14 | |
| — | 10.00 | — | — | ||
| Supply of Single Mode OFC Patch Cord (LC-SC/SC-SC/LC-LC/FC-LC) as per site requirement. Inspection: Consignee | — | — | — | 3,146.2 | |
| — | 20.00 | — | — | ||
| Supply of CAT-6 UTP Patch Cord, 2 meter long. It Shall comply with TEC GR No. TEC/GR/SLC-01/02.AUG 05 (TEC Standard Number: TEC52010:2005) with latest amendments, Version and as per Sr. no. 5.0 of Technical Specification attached. Make: D-Link or Digisol or Equivalent or Higher Inspection: Consignee | — | — | — | 2,410.6 | |
| — | 4.00 | — | — | ||
| Supply & Installation of wall mounted 19 inch 6U networking rack having Power distribution board, Fan, cable manager and front lockable door with glass as per Sr. no. 6.0 of Technical Specification attached. Make-D-Link or Comrack or Valrack or Equivalent or Higher. Inspection: Consignee | — | — | — | 15,877.16 | |
| — | 15.00 | — | — | ||
| Supply of Info Outlet Box (I/O Box) suitable for termination of CAT-6 UTP cable including back mount box, faceplate & Modular jack. It Shall comply to TEC GR No. TEC/GR/SLC- 01/02.AUG 05 (TEC Standard Number: TEC52010:2005) with latest amendments, Version and as per Sr. no. 7.0 of Technical Specification attached. Make: Legrand / dlink or Equivalent or Higher. Inspection: Consignee | — | — | — | 3,142.95 | |
| — | 15.00 | — | — | ||
| Fixing of I/O Box as per direction of site in charge. All fixing material shall be supplied by contractor. | — | — | — | 564.9 | |
| — | 1525.00 | — | — | ||
| Supply of UTP Enhanced CAT-6 Cable as per Para 8.0 of Technical Specification attached. Make: D-link or Equivalent or Higher. Inspection: Consignee | — | — | — | 33,626.25 | |
| — | 100.00 | — | — | ||
| Supply of RJ-45 Connector. Make: D-link or similar Inspection: Consignee | — | — | — | 493 | |
| — | 500.00 | — | — | ||
| Supply of 24 Fibre Armoured optic fibre cable as per RDSO Spec. No. IRS:TC 55-2006, Rev. 1 with Amendment 1.1 and Amndt.2 Amndt. 3 or latest as per Para 9.0 of Technical Specification attached. Inspection: Consignee | — | — | — | 50,535 | |
| — | 500.00 | — | — | ||
| Boring & Trenchless cabling at depth of min. 1.5 meter from ground level by Horizontal direction drilling (HDD).This includes supply & insertion of HDPE duct of size 40/33 mm with socket as per RDSO Specs. No. RDSO/SPN/TC/45/2013- Rev 2.0 with latest amendments of suitable color & accessories. The work shall be done as per instruction/extant practice of cable laying & direction of Rly Engineer in charge of the work and site in charge. Inspection: Consignee | — | — | — | 2,79,145 | |
| — | 500.00 | — | — | ||
| Blowing/Drawing of OFC Cable in HDPE duct, as per instruction/extant practice of cable laying & direction of engineer in charge of work and site in charge. | — | — | — | 4,440 | |
| — | 1.00 | — | — | ||
| Supply of Layer-2 Managed Switch having 24 Nos. 10/100/1000 Base-X (Fiber) ports along with supply of 24 nos. SFP module (Optical/Copper) & connecting patch cords as per Para 10.0 of Technical Specification attached. Make: Cisco or D-Link or Digisol or Netgear or Zyxel or Equivalent or Higher Inspection: Consignee | — | — | — | 1,37,850 | |
| — | 300.00 | — | — | ||
| Supply of armoured single mode optical Fiber Cable having min.6 optical fibers as per Para 11.0 of Technical Specification attached. Inspection: Consignee | — | — | — | 6,312 | |
| — | 2000.00 | — | — | ||
| Supply of 25mm. dia PVC Conduit Pipe (MMS) ISI marked as per: IS 9537 part-3 as per Para 12.0 of Technical Specification attached with all required accessories (metal clamping, Bends etc. shall be use) as per instructions of Site in charge. Inspection: Consignee | — | — | — | 59,500 | |
| — | 2000.00 | — | — | ||
| Fixing & Laying of PVC Conduit Pipe of Size 25 mm dia on wall including all fixing materials as per instruction of site in charge for fixing of pipe. All fixing material like- 3way/4wayjunction box, T-joint, L-joint etc. will be supplied by the contractor as per site requirement. | — | — | — | 19,800 | |
| — | 50.00 | — | — | ||
| Chase cutting in floor / wall and restoring of floor / wall with cement: sand plaster after laying/fixing of conduit pipe in floor /wall as per instruction of site in charge. | — | — | — | 1,803.5 | |
| — | 1800.00 | — | — | ||
| Laying/Drawing of CAT-6/OFC cable through PVC casing caping/PVC Conduit Pipe. | — | — | — | 8,118 | |
| — | 1.00 | — | — |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
HTML
nit.pdf
NIT
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .