| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹1.3 LAdmitted-Finance | +0.00% | ₹1.3 L | L1 | Admitted-Finance |
Tender Value
₹1.3 L
EMD Value
₹2,580
Closing Date
16 Aug 2026, 6:00 pmClosed
Executive Engineer (Electric)
PWD CAMPUS BHARATPUR
Repair and Maintance of 8 ton air Conditioner Fixed at MCH Building Distt.-Sawai Madhopur
2026_CEPWD_589255_1
NIT-10-2026-27
Open Tender
Electrical Works
Percentage
90 days
Sawai Madhopur
Please refer Tender documents.
2 documents required · 2 mandatory
₹500
As per NIT
₹2,580
Yes
13 Sept 2026
16 Aug 2026
17 Aug 2026
16 Aug 2026
16 Aug 2026
16 Aug 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Replacement of defective compressor by company repaired compressor as per OEM recommendations of following gadgets including testing etc. as required. Replacement of material or components shall be use as per guidelines of OEM of original product. All the scrap material should be retained by the contractor. | - | - | - | - |
| 2 | 4.0 TR A.C. | 2 | Each | - | - |
| 3 | SITC of Interconnecting refrigerant copper pipe for split/Ductable/ Casseette AC of DHE Grade C12200- ASTM B68, B75, chemical composition of copper %- 99.0 Min and Phosphorus %- 0.015 to 0.040 . For Annealed copper tube :- Tensile strength = 210 Mpa wih elongation % = 40 Min . Ink Mark Brand Printing on Hard Tubes should be present. Piping between each set of indoor & outdoor units of different sizes as per OEM requirement & specifications including class 'O' Nitrile rubber sleeves, chase cutting, supports, making good the same with sand cement plaster etc. as required. All as per pre approved by Engineer in charge. For additional technical parameters of products/ work , refer Annexure "A" attached with this BSR . | 8 | Kg | - | - |
| 4 | Gas charging of VRF/VRV system with R410A refrigerant gas. Before gas charging system shall be flushed with high purity Nitrogen Gas to remove carbon content, dirt particles to make sure that there is no chance of mixing any impurity with Refrigerant Gas. Thereafter System shall be tested with Nitrogen Gas at 1.5 Times of working pressure of R410 Refrigerant Gas to ensure leakproof system. Whole system shall be Vacuumed up to 500-micron level which ensures the zero-moisture content level in piping to ensure better cooling efficiency and long life of the system. All as per pre approved by Engineer in charge. For additional technical parameters of products/ work , refer Annexure "A" attached with this BSR . | 8 | Kg | - | - |
stage.html
html • 0.03 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 13.72 MB
06Month.pdf
Other Document • 1.21 MB
Annexure.pdf
Other Document • 1.72 MB
BOQ_1046391.xls
BOQ • 0.28 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .