| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹21,001.33Admitted-Fee/PreQual/Technical/Finance | +0.00% | ₹21,001.33 | L1 | Admitted-Fee/PreQual/Technical/Finance |
| 2 | L2₹21,211.34+₹210.01 (1.00%)Admitted-Fee/PreQual/Technical/Finance | +1.00% | ₹21,211.34+₹210.01 (1.00%) | L2 | Admitted-Fee/PreQual/Technical/Finance |
| 3 | L3₹23,880.61+₹2,879.28 (13.7%)Admitted-Fee/PreQual/Technical/Finance | +13.71% | ₹23,880.61+₹2,879.28 (13.7%) | L3 | Admitted-Fee/PreQual/Technical/Finance |
| 4 | Not Admitted-Fee/PreQual/Technical/Finance | - | - | - | Not Admitted-Fee/PreQual/Technical/Finance Fee not submitted |
Tender Value
₹25.0 L
EMD Value
₹50,000
Closing Date
28 May 2026, 5:00 pmClosed
EO
NAGAR PALIKA LOSAL
WORK NO 03
2026_DLB_560731_3
462
Open Tender
Civil Works
Percentage
120 days
NP LOSAL
REGISTERED FIRM
2 documents required · 2 mandatory
₹500
AS PER TENDER DOCUMENT
₹50,000
Yes
24 Jul 2026
20 May 2026
1 Jun 2026
20 May 2026
28 May 2026
20 May 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1Work | |||||
| 1.01 | Dismantling of existing structures like culverts, bridges, retaining
walls, CC road and other structure comprising of masonry, cement
concrete, wood work, steel work, including T&P and scaffolding
wherever necessary, sorting the dismantled material disposal of
unserviceable material and stacking the serviceable material with alllifts and lead of 50 metres as directed by Engineer. Cement Concrete Grade M-15 and above and PCC blocks | 1 | cum | 678 | ₹678 |
| 1.02 | Lime Concrete, cement concrete grade M-10 (1:5:10) and below | 1 | cum | 393.5 | ₹393.5 |
| 1.03 | Carriage of Materials by mechanical transport including loading unloading and stacking Stone, boulders,gravelly material | 1 | cum | 197.03 | ₹197.03 |
| 1.04 | Providing and laying lean cement concrete 1:4:8 in Sub- base over prepared sub-grade with coarse and fine aggregateconforming to IS: 383, the size of coarse aggregate not exceeding 25 mm aggregate cement ratio not to exceed 15:1, aggregate gradation
after blending to be as per table 600-1, cement content not to be less than 150 kg/ cum, optimum moisture content to be determined during trial length construction, concrete strength not to be less than
10 Mpa at 7 days, mixed in concrete mixer, laid manually compacted with surface vibrator, finishing and curing complete as per clause 601, 112 of MoRT&H specification including all material labour, machinery, lighting, guarding and maintenance of diversion. | 1 | cum | 2,955 | ₹2,955 |
| 1.05 | Centring and shuttering with plywood or steel sheet upto two stories( each story of height upto 3.5 metre from floor level) includingstrutting, propping etc. and removal of form for :Foundations, footings, bases of columns, etc. for mass concrete. | 1 | sqm | 236.5 | ₹236.5 |
| 1.06 | Providing and laying in position cement concrete of specified gradeexcluding the cost of centring and shuttering - All work upto plinthlevel :1:2:4 (1 cement : 2 coarse sand : 4 graded stone aggregate 20 mmnominal size) | 1 | cum | 5,510 | ₹5,510 |
| 1.07 | Supplying and fixing in walls machine cut and polished stone shelves, tands and in CM 1:3 with machine cut edges : Sand or other approved stone 50mm thick. | 1 | sqm | 704 | ₹704 |
| 1.08 | Cement concrete flooring 1:2:4 (1 cement : 2 coarse sand : 4 graded 20mm nominal size stone aggregate) finished with a floating coat of neat cement including cement slurry, but excluding the cost of nosing of steps etc. complete. including Providing /mixing of synthetic fibers compulsorily complying with IS 16481:2022 of 06 mm/12 mm length to be mixed @ 0.25% by weight of Cement i.e. 125 gms per 50 kg Cement up to 900 gms per cum of Concrete/ mortar 40mm thick | 1 | sqm | 422.5 | ₹422.5 |
| 1.09 | Providing, laying and spreading of granular sub-base by providing
coarse graded Material (Table 400-2), spreading in uniform layers
with motor grader on prepared surface, mixing BY MIX IN PLACE
METHOD with rotavator at OMC, and compacting with vibratory
roller to achieve the desired density, complete as per MoRT&H
specification clause - 401 including all material, labour, machinery,
lighting, guarding and maintenance of diversion Grading - III Material | 1 | cum | 1,106 | ₹1,106 |
stage.html
html • 0.02 MB
finance_998044.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.02 MB
Tendernotice_2.pdf
PDF • 0.18 MB
BOQ_998044.xls
BOQ • 0.33 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .