Loading…
Loading…
Tender Value
₹2.9 L
EMD Value
₹5,880
Closing Date
29 Aug 2026, 11:00 amDue tomorrow
RAJEEV KUMAR EXECUTIVE ENGINER
EXECUTIVE ENGINEER, MADHYA GANGA CANAL CONSTRUCTION DIVISION-9, SAMBHAL
CONSTRUCTION OF GUL CROSSING AT KM 10.000 OF KAILY DY.
2026_UPIDC_1178283_1
03/EE/2026-27
Open Tender
Civil Works - Canal
Item Rate
30 days
KAILY SAMBHAL
PLEASE REFER TENDER DOCUMENT
3 documents required · 3 mandatory
₹516
Yes
₹5,880
Yes
SAMBHAL
21 Aug 2026
21 Aug 2026
29 Aug 2026
21 Aug 2026
29 Aug 2026
21 Aug 2026
25 Aug 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earth work in foundation in wet soil including lift up to 1.50 m and lead up to 30 m and including back filling, watering and ramming of excavated earth into the trenches or into the space between the structure and the side of foundation trenches. | 0.6 | cum | - | - |
| - | Providing and Laying M-10 (C.C.1:3:6) cement concrete including cost of all materials, labour T & P, all lifts and leads etc. complete. | - | cum | - | - |
| - | Laying C.C. 1:2:4 Mix (M-15) cement, coarse sand & 20 mm down graded stone grit including cost of all material, labour and T&P etc. complete but excludiing cost of shuttering. | 1 | cum | - | - |
| - | Laying C.C. 1:1.5:3 Mix (M-20) cement, coarse sand & 20 mm down graded stone grit including cost of all material, labour and T&P etc. complete but excludiing cost of shuttering. | - | cum | - | - |
| - | Centering and shuttering (steel shuttering) for C.C. work up to 3.0 m height including cost of all labour, material and T&P etc. required for proper completion of work. | 0.8 | sqm | - | - |
| - | Providing steel reinforcement with straightening, Cutting, Bending, Binding and Placing etc with cost of steel and binding wire e.t.c complete Including cost of all material, labour, T & P complete required for proper completion of work. | - | M.T | - | - |
| - | Providing and laying non-pressure NP2 class (light duty) 300 MM diameter R.C.C. pipes with collars jointed with stiff mixture of cement mortar in the proportion of 1:2 (1 cement : 2 fine sand) including testing of joints etc. complete : | - | RM | - | - |
| - | Earth work in filling or in embankment in ordinary soil,excavation to be in the form of regular pits and earth work in embankment to be in 20cm layers including ramming and dressing the surface to be required level, slopes and also including 1.50 m lift and 30m lead including cost of earth,all T& P,labour,cartage beyond 600m but within 1 km distance,loading,unloading etc all complete for proper completion of work as directed by Engineer -in Charge | - | cum | - | - |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 2.20 MB
Tendernotice_2.pdf
PDF • 4.01 MB
BOQ_2214162.xls
BOQ • 0.24 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at [email protected].