Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹13.1 LAccepted-AOC | ₹13.1 L | L1 | Accepted-AOC L1 |
| 2 | L2₹13.2 LRejected-Finance | ₹13.2 L | L2 | Rejected-Finance L2 |
| Sl No | Description | Qty | Unit | VK CONSTRUCTION L2 | Kedar Traders L1 |
|---|---|---|---|---|---|
| 1.00 | Earth work in Excavation for Canal / foundation in dry soil ( loam clay or sand) including lift upto 3.0 mtr(Avg.) and lead upto 30 mtr and including back filling , watering and ramming of excavated earth into the plinth with removal and disposal of surplus earth as directed by Engineer - in - Charge. | 485 | Cum. | 156 ₹75,660 | 120 ₹58,200 |
| 2.00 | Laying cement concrete (M-15 grade) 1:2:4 in bed etc including all material labour T&P etc | 21 | Cum. | 6,395 ₹1.3 L | 6,490 ₹1.4 L |
| 3.00 | Laying R.C.C.in (M-25 grade) 1:1:2 in Abutment Pier ,Slab etc , including all material labour T&P etc | 27 | Cum. | 7,599 ₹2.1 L | 7,595 ₹2.1 L |
| 4.00 | Laying R.C.C.in (M-30 grade) in Wearing coat, etc including all material labour T&P etc | 4.3 | Cum. | 7,242 ₹31,140.60 | 7,242 ₹31,140.60 |
| 5.00 | Centring & Shuttering for C.C works in ,cc floor including cost of all mterials, labour and T&P for proper complition of work. | 25 | Sqm | 417 ₹10,425 | 417 ₹10,425 |
| 6.00 | Centring & Shuttering for R.C.C works in Slab etc cost of all mterials, labour and T&P for proper complition of work. | 45 | Sqm | 735 ₹33,075 | 689 ₹31,005 |
| 7.00 | Laying of Reinforcement in R.C.C. including cutting, bending, binding and placing in position including cost of all mterials, labour and T&P for proper complition of work. | 2.65 | M.T. | 83,109 ₹2.2 L | 83,109 ₹2.2 L |
| 8.00 | Brick work (M-100) in 1:4 cement mortar in Abutment wall,stopping traffic etc including cost of all mterials, labour and T&P for proper complition of work. | 64 | Cum. | 5,989 ₹3.8 L | 5,889 ₹3.8 L |
| 9.00 | S/Laying R.B.M in approach slab including cost of all mterials, labour and T&P for proper complition of work. | 15 | Cum. | 2,458 ₹36,870 | 2,259 ₹33,885 |
| 10.00 | Cement pointingin 1:2 Cment mortar i/c all cost of Material Labour T&P etc complete but excludding cost of Briks | 65 | Sqm | 106 ₹6,890 | 109 ₹7,085 |
Tender Value
Refer Docs
EMD Value
₹1.4 L
Closing Date
3 Sept 2025, 12:00 pmClosed
EXECUTIVE ENGINEER
Office Of EE MGCCD6, Meerut
04/EE/2025-26(LOT1)
2025_UPIDC_1068849_1
04/EE/2025-26
Open Tender
Civil Works
90 days
Meerut
Please refer Tender documents.
2 documents required · 2 mandatory
₹854
₹1.4 L
Yes
16 Jan 2026
27 Aug 2025
3 Sept 2025
27 Aug 2025
3 Sept 2025
27 Aug 2025
Amount
Earth work in Excavation for Canal / foundation in dry soil ( loam clay or sand) including lift upto 3.0 mtr(Avg.) and lead upto 30 mtr and including back filling , watering and ramming of excavated earth into the plinth with removal and disposal of surplus earth as directed by Engineer - in - Charge.
Laying cement concrete (M-15 grade) 1:2:4 in bed etc including all material labour T&P etc
Laying R.C.C.in (M-25 grade) 1:1:2 in Abutment Pier ,Slab etc , including all material labour T&P etc
Laying R.C.C.in (M-30 grade) in Wearing coat, etc including all material labour T&P etc
Centring & Shuttering for C.C works in ,cc floor including cost of all mterials, labour and T&P for proper complition of work.
Centring & Shuttering for R.C.C works in Slab etc cost of all mterials, labour and T&P for proper complition of work.
Laying of Reinforcement in R.C.C. including cutting, bending, binding and placing in position including cost of all mterials, labour and T&P for proper complition of work.
Brick work (M-100) in 1:4 cement mortar in Abutment wall,stopping traffic etc including cost of all mterials, labour and T&P for proper complition of work.
S/Laying R.B.M in approach slab including cost of all mterials, labour and T&P for proper complition of work.
Cement pointingin 1:2 Cment mortar i/c all cost of Material Labour T&P etc complete but excludding cost of Briks
S/F 60 cm long 100 mm dia G.I.pipe in draining spout including cost of all mterials, labour and T&P for proper complition of work.
Supplying & placing Tarfelt bearing two layer for slab i/c all cost of material T&P etc comlete
Supplying & fixing Angle iron 65x65x6 mm for Expension joint i/c all cost of material T&P etc complete
Laying Non cohesive / cohesion less (ordinary sand) back filling & in fill in approach slab ,in box portion including cost of all mterials, labour and T&P for proper complition of work.
Providing & Fixing wheel Guard of size 150x150x900 mm including cost of all mterials, labour and T&P for proper complition of work.
E/W in filling in all type of soil lead upto 1.00 km including cost of all mterials, labour and T&P for proper complition of work.
Providing & Laying B.O.E.soling joint filled with ordinary sand including cost of all mterials, labour and T&P for proper complition of work.
VK CONSTRUCTION (BID ID -5514367)
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid