Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹13.1 LAccepted-AOC | L1 | Accepted-AOC L1 | |
| 2 | L2₹13.2 L+₹12,648 (0.97%)Rejected-Finance | L2 | Rejected-Finance L2 |
| Sl No | Description | Qty | Unit | VK CONSTRUCTION L2 | Kedar Traders L1 |
|---|---|---|---|---|---|
| 1.00 | Earth work in Excavation for Canal / foundation in dry soil ( loam clay or sand) including lift upto 3.0 mtr(Avg.) and lead upto 30 mtr and including back filling , watering and ramming of excavated earth into the plinth with removal and disposal of surplus earth as directed by Engineer - in - Charge. | 485 | Cum. | 156 ₹75,660 | 120 ₹58,200 Lowest |
| 2.00 | Laying cement concrete (M-15 grade) 1:2:4 in bed etc including all material labour T&P etc | 21 | Cum. | 6,395 ₹1,34,295 Lowest | 6,490 ₹1,36,290 |
| 3.00 | Laying R.C.C.in (M-25 grade) 1:1:2 in Abutment Pier ,Slab etc , including all material labour T&P etc | 27 | Cum. | 7,599 ₹2,05,173 | 7,595 ₹2,05,065 Lowest |
| 4.00 | Laying R.C.C.in (M-30 grade) in Wearing coat, etc including all material labour T&P etc | 4.3 | Cum. | 7,242 ₹31,140.6 Lowest | 7,242 ₹31,140.6 Lowest |
| 5.00 | Centring & Shuttering for C.C works in ,cc floor including cost of all mterials, labour and T&P for proper complition of work. | 25 | Sqm | 417 ₹10,425 Lowest | 417 ₹10,425 Lowest |
| 6.00 | Centring & Shuttering for R.C.C works in Slab etc cost of all mterials, labour and T&P for proper complition of work. | 45 | Sqm | 735 ₹33,075 | 689 ₹31,005 Lowest |
| 7.00 | Laying of Reinforcement in R.C.C. including cutting, bending, binding and placing in position including cost of all mterials, labour and T&P for proper complition of work. | 2.65 | M.T. | 83,109 ₹2,20,238.85 Lowest | 83,109 ₹2,20,238.85 Lowest |
| 8.00 | Brick work (M-100) in 1:4 cement mortar in Abutment wall,stopping traffic etc including cost of all mterials, labour and T&P for proper complition of work. | 64 | Cum. | 5,989 ₹3,83,296 | 5,889 ₹3,76,896 Lowest |
| 9.00 | S/Laying R.B.M in approach slab including cost of all mterials, labour and T&P for proper complition of work. | 15 | Cum. | 2,458 ₹36,870 | 2,259 ₹33,885 Lowest |
| 10.00 | Cement pointingin 1:2 Cment mortar i/c all cost of Material Labour T&P etc complete but excludding cost of Briks | 65 | Sqm | 106 ₹6,890 Lowest | 109 ₹7,085 |
Tender Value
Refer Docs
EMD Value
₹1.4 L
Closing Date
3 Sept 2025, 12:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
EXECUTIVE ENGINEER
Office Of EE MGCCD6, Meerut
04/EE/2025-26(LOT1)
2025_UPIDC_1068849_1
04/EE/2025-26
Open Tender
Civil Works
Item Rate
90 days
Meerut
Please refer Tender documents.
2 documents required · 2 mandatory
₹854
₹1.4 L
Yes
16 Jan 2026
27 Aug 2025
3 Sept 2025
27 Aug 2025
3 Sept 2025
27 Aug 2025
Amount
Earth work in Excavation for Canal / foundation in dry soil ( loam clay or sand) including lift upto 3.0 mtr(Avg.) and lead upto 30 mtr and including back filling , watering and ramming of excavated earth into the plinth with removal and disposal of surplus earth as directed by Engineer - in - Charge.
Laying cement concrete (M-15 grade) 1:2:4 in bed etc including all material labour T&P etc
Laying R.C.C.in (M-25 grade) 1:1:2 in Abutment Pier ,Slab etc , including all material labour T&P etc
Laying R.C.C.in (M-30 grade) in Wearing coat, etc including all material labour T&P etc
Centring & Shuttering for C.C works in ,cc floor including cost of all mterials, labour and T&P for proper complition of work.
Centring & Shuttering for R.C.C works in Slab etc cost of all mterials, labour and T&P for proper complition of work.
Laying of Reinforcement in R.C.C. including cutting, bending, binding and placing in position including cost of all mterials, labour and T&P for proper complition of work.
Brick work (M-100) in 1:4 cement mortar in Abutment wall,stopping traffic etc including cost of all mterials, labour and T&P for proper complition of work.
S/Laying R.B.M in approach slab including cost of all mterials, labour and T&P for proper complition of work.
Cement pointingin 1:2 Cment mortar i/c all cost of Material Labour T&P etc complete but excludding cost of Briks
S/F 60 cm long 100 mm dia G.I.pipe in draining spout including cost of all mterials, labour and T&P for proper complition of work.
Supplying & placing Tarfelt bearing two layer for slab i/c all cost of material T&P etc comlete
Supplying & fixing Angle iron 65x65x6 mm for Expension joint i/c all cost of material T&P etc complete
Laying Non cohesive / cohesion less (ordinary sand) back filling & in fill in approach slab ,in box portion including cost of all mterials, labour and T&P for proper complition of work.
Providing & Fixing wheel Guard of size 150x150x900 mm including cost of all mterials, labour and T&P for proper complition of work.
E/W in filling in all type of soil lead upto 1.00 km including cost of all mterials, labour and T&P for proper complition of work.
Providing & Laying B.O.E.soling joint filled with ordinary sand including cost of all mterials, labour and T&P for proper complition of work.
VK CONSTRUCTION (BID ID -5514367)
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .