| 1 | L1₹91.7 LAccepted-AOC 402 3RD FLOOR DEV PALACE M G ROAD KARUR 639 001 | KARUR | TAMIL NADU | 639001 | L1 | Accepted-AOC Agreement accepted | |
| 2 | L2₹1.0 Cr+₹1.9 L (1.95%)Rejected-Finance | L2 | Rejected-Finance 2nd Lowest | |
| 3 | L3₹1.1 Cr+₹6.4 L (6.43%)Rejected-Finance | L3 | Rejected-Finance 3rd Lowest |
| Sl No | Description | Qty | Unit | ALPHAA MINDS VENTURES L2 | M/S SAMRI INFRA DEVELOPERS L1 | MNM CONSTRUCTION L3 |
|---|---|---|---|---|---|---|
| 1.00 | Earth work excavation for foundation in all soils and sub-soils and to full depth as may be directed except in rock requiring blasting inclusive of shoring shuttering, baling out water wherever necessary and depositing the surplus earth within the compound in places shown by the departmental officers with an initial lead of 10 mts and initial lift of 2 mts. and clearing and levelling the site, etc., complete complying with standard specification. | 765 | M3 | 246 ₹1,88,190 | 235 ₹1,79,775 Lowest | 250 ₹1,91,250 |
| 2.00 | Supplying and filling in foundation and basement with Gravel in layers of not more than 15 cm. thick well rammed watered and compacted etc ., Complete complying with standard specification | 72 | M3 | 365 ₹26,280 | 350 ₹25,200 Lowest | 370 ₹26,640 |
| 3.00 | Supplying and filling in foundation and basement, etc with crushed stone sand in layers of not more than 15 cm thick well watered, rammed and consolidated etc. complete complying with standard specification and as directed by the departmental officers | 78 | M3 | 1,630 ₹1,27,140 | 1,600 ₹1,24,800 Lowest | 1,700 ₹1,32,600 |
| 4.00 | Cement Concrete 1:5:10 (One Cement, Five crushed stone sand and Ten hard broken stone jelly) using 40 mm gauge hard broken granite stone jelly for foundation including dewatering wherever necessary and laid in layers of not more than 15 cm thick well rammed, consolidated and curing etc. complete complying with standard specification | 29.6 | M3 | 5,450 ₹1,61,320 | 5,400 ₹1,59,840 Lowest | 5,500 ₹1,62,800 |
| 5.00 | Refilling with excavated earth other than crushed stone sand with an initial head load of 100 mts. and depositing the earth as shown by the departmental officers in layers of not more than 15 cm thick well rammed, watered and consolidated etc. complete complying with standard specification | 40 | M3 | 48 ₹1,920 | 45 ₹1,800 Lowest | 50 ₹2,000 |
| 6.00 | Cement Concrete 1:5:10 (One Cement, Five crushed stone sand and Ten hard broken stone jelly) using 40 mm gauge hard broken jelly for flooring including laying , consolidating, finishing, rendering the top surface rough to receive the floor finish, curing etc., complete complying with standard specification. (The rate is inclusive of necessary planking for panelling wherever necessary and as directed by the departmental officers ) | 10.1 | M3 | 5,450 ₹55,045 | 5,400 ₹54,540 Lowest | 5,500 ₹55,550 |
| 7.00Brick work in Cement Mortar 1:6 (One Cement and six crushed stone sand) using best quality Fly ash bricks of size 23x11x7cm including curing etc.,complete complying with standard specification | ||||||
| 7.01 | In Foundation and basement | 43.6 | M3 | 7,950 ₹3,46,620 | 7,780 ₹3,39,208 Lowest | 8,000 ₹3,48,800 |
| 7.02 | In ground floor | 60 | M3 | 8,050 ₹4,83,000 | 7,980 ₹4,78,800 Lowest | 8,100 ₹4,86,000 |
| 7.03 | In First floor | 77.3 | M3 | 8,250 ₹6,37,725 | 8,100 ₹6,26,130 Lowest | 8,300 ₹6,41,590 |
Tender Value
₹90.0 L
EMD Value
₹55,000
Closing Date
5 May 2025, 3:00 pmClosed
Superintending Engineer, P.W.D., Buildings (C and
Office of the Superintending Engineer, P.W.D., Buildings (C and M), Circle, Trichy-1
Construction of District Integrated Public Health Laboratory in Government Head Quarter Hospital at Perambalur in Perambalur District.
2025_PWD_549608_1
Tn.No.01/SE/Dt.07.04.2025
Open Tender
Civil Works - Buildings
Lump-sum
210 days
Perambalur
Please refer Tender documents.
9 documents required · 9 mandatory
₹0
₹55,000
30 Sept 2025
22 Apr 2025
6 May 2025
22 Apr 2025
5 May 2025
22 Apr 2025
Amount
Earth work excavation for foundation in all soils and sub-soils and to full depth as may be directed except in rock requiring blasting inclusive of shoring shuttering, baling out water wherever necessary and depositing the surplus earth within the compound in places shown by the departmental officers with an initial lead of 10 mts and initial lift of 2 mts. and clearing and levelling the site, etc., complete complying with standard specification.
Supplying and filling in foundation and basement with Gravel in layers of not more than 15 cm. thick well rammed watered and compacted etc ., Complete complying with standard specification
Supplying and filling in foundation and basement, etc with crushed stone sand in layers of not more than 15 cm thick well watered, rammed and consolidated etc. complete complying with standard specification and as directed by the departmental officers
Cement Concrete 1:5:10 (One Cement, Five crushed stone sand and Ten hard broken stone jelly) using 40 mm gauge hard broken granite stone jelly for foundation including dewatering wherever necessary and laid in layers of not more than 15 cm thick well rammed, consolidated and curing etc. complete complying with standard specification
Refilling with excavated earth other than crushed stone sand with an initial head load of 100 mts. and depositing the earth as shown by the departmental officers in layers of not more than 15 cm thick well rammed, watered and consolidated etc. complete complying with standard specification
Cement Concrete 1:5:10 (One Cement, Five crushed stone sand and Ten hard broken stone jelly) using 40 mm gauge hard broken jelly for flooring including laying , consolidating, finishing, rendering the top surface rough to receive the floor finish, curing etc., complete complying with standard specification. (The rate is inclusive of necessary planking for panelling wherever necessary and as directed by the departmental officers )
Brick work in Cement Mortar 1:6 (One Cement and six crushed stone sand) using best quality Fly ash bricks of size 23x11x7cm including curing etc.,complete complying with standard specification
In Foundation and basement
In ground floor
In First floor
Supplying and erecting steel centering including necessary supports for plane surfaces for Reinforced Cement Concrete works such as column footings, column pedestals, plinth beams, grade beams, staircase steps, etc. which require only nominal strutting using mild steel sheets of size 90cm x 60cm and 10 BG stiffened with welded mild steel angles of size 25mm x 25mm x 3 mm for boarding, laid over silver oak joists of size 10cm x 6.5cm spaced at about 75cm centre to centre or at suitable intervals etc. complete in all floors complying with standard specifcation. (Payment for centering shall be given after the concrete is laid)
Supplying and erecting centering for sides and soffits including necessary supports and strutting upto 3.29 M height for plane surfaces as detailed below in all floors with all cross bracings using Mild Steel sheets of size 90 x 60 cm and 10 BG stiffened with welded Mild Steel angle of size 25mm x 25mm x 3 mm for boarding laid over silver oak joists of size 10cm x 6.50 cm spaced at abote 90 cm centre to centre and supported by casurina props of 10cm to 13 cm dia spaced at not more than 75 cm centre to centre etc. complete complying with the standard specificaiton. (Payment for centering shall be given after the concrete is laid)
For plane surfaces such as RCC floor slab, roof slab, beams, lintels, bed blocks, landing slab, waist slab, portico slabs and beams, etc.
For plane surfaces such as rectangular or square RCC columns, sunshades, top and bottom slab of RCC boxing, etc.
Providing and laying in position, standardised concrete Mix M-20 Grade in accordance with IS 456 using 20mm and down graded hard broken granite stone jelly for all RCC items of works with minimum cement content of 325 kg/m3 and maximum water cement ratio of 0.55, including admixture (plasticiser / super plasticiser) in recommended proportions as per IS:9103 to accelerate, retard setting of concrete, improve workability without impairing strength and durability with about (5 cu.m.) 7730 kg. of 20mm machine crushed stone jelly and with about (3.3 cu.m.) 5156 kg. of 10-12mm machine crushed stone jelly and with about (4.79 cu.m) 7670 kg. of crushed stone sand, but excluding cost of reinforcement grill and fabricating charges, centering and shuttering and also including laying, vibrating with mechanical vibrators, finishing,curing, etc. and providing fixtures like fan clamps in the RCC floor/ roof slabs wherever necessary without claiming extra, etc., complete complying with standard specification and as directed by the departmental officers. The coarse and fine aggregates to be used should comply with the requirements of IS standards. (No separate payment will be made by the Department for the excess usage of materials).
In foundation and basement
In ground floor
In First floor
Supplying, fabricating and placing in position Mild Steel / Ribbed Tor Steel grills for all RCC works as per design given including cost of steel and G.I. binding wire in all floors etc. complete complying with standard specification. (Contractor has to make his own arrangements for the supply of steel and binding wire)
Paving the floor with best quality Vertified Tiles of size 600 x 600 x 8mm of approved colour, shade and quality laid in cement mortar 1:3 (one cement and three crushed stone sand) 20mm thick in all floors and the top pointed with the white cement mixed same colour pigments etc., complete complying with standard specification. (The make and brand of the tiles should be got approved by Executive Engineer before use on works)
Plastering with CM 1:5 (one cement, Five sand), 12 mm thick mixed with bonding agent cebex 112, zydex-zycrete 2X or other equivalent compound confirming to BIS at 200 ml of One cement bag (50Kg) for increased workability and air entrainment used finishing in all floors including curing etc.,complete complying with standard specifications and as directed by departmental officers.
Painting two coats of newly plastered wall surface with ready mixed plastic emulsion paint of first class quality and of approved colour over a priming coat including thorough scrapping, clean removal of dirt, and including necessary plaster of paris putty, wherever required etc., complete complying with standard specification.
Painting the wall two coats with approved weather proof Exterior Emulsion paint over one primer coat over cement plastered wall surface etc., complete complying with standard specification.
Supplying and fixing UPVC (Un-Plasticized Polyvinyl Chloride) Windows of casement type (open) from the profile the size of outer frame 60mm x 58mm and shutter profile are Reinforcement with GI/1mm 125GSM and 100% corrosion free, the profiles are multi chambered sections with wall thick of 2mm. The EPDM rubber (black colour) covered with over all the edges of frame and shutter the shutter will be provided with Espag multi power point locks and also it operates as handle. The corners and joints should be welded and cleaned. Radiations free pin headed plain or brown colour glass 4mm thick should be provided to the shutter and it should not allow leakage of water even at most ranging storms and should have key lockable action, security protective hinges, strong locking systems and as per size for arresting noise and energy loss.The connecting mechanism between sash and outer frame that enables opening of the window. The window should be fixed to the wall with 100% packing with screws and silicon packing all round the frames. The window should be got approved from the Executive Engineer before use on work
Supplying and fixing of M.S.grill of approved design for grill gate, grill work to doors and windows openings ramp etc., using necessary mild steel flats for inner and outer members which should be fixed on edges including priming coat of best approved quality red oxide primer etc., complete complying with standard specification.
Supplying ,fabricating and fixing in position of Stainless steel frame without bottom frame, of size 100X60mm rectangular section with necessary rebate 30mmX15mm, to host the shutter,using 1.00mm thick Stainless steel frame steel plate confirming to ISI specified ensured of right butt joint riveted hold assembly with nylon insert,not be welded with special purpose hard ware. Proclaimed including phopating as per ISI with rust preventive primer ready to assemble condition for easy installation at site including dismantling,making necessary chipping and holes in RCC columns, walls with power drills to the extent required ,including providing concrete 1:2:4 inside the box curing etc complete.The cost includes the cost of hold fast ,plastic bush, insert receiver,rubber bottom,shock absorber etc complete as directed by the departmental officers in all floors.
Supplying and fixing solid core particle board flush shutter of nominal thick of 35 mm with necessary T.W. internal lipping conforming to IS 2302 with both sides alround commercial ply 35mm thick including supplying and fixing cost of wind appliances and furniture fittings such as 1no .200x12mm aluminium tower bolt 2nos. 150x12mm aluminium tower bolts 1no. 250x16mm aluminium aldrops, 3 nos. 200mm ‘D’ type aluminium door handle and door stopper with bush etc., complete as directed by the departmental officers. Single Leaf
Painting new iron works such as steel doors, windows, ventilators, window bars, balustrades etc., with two coats of best approved first quality and colour of synthetic namel paint over the existing red oxide priming coat in all floors excluding cost of priming coat etc., complete complying with standard specification. (The make, quality and colour of paint should be got approved by the Executive Engineer before use on works.)
Painting new wood work with two finishing coats of synthetic enamel ready mixed paint of approved quality and colour over one coat priming coat in all floors including the cost of primer etc., complete complying with standard specification. (The make, quality and colour of paint should be got approved by the Executive Engineer before use on works.)
GST at 18%
ALPHAA MINDS VENTURES (BID ID -1329848)
MNM CONSTRUCTION (BID ID -1329745)
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .