Loading…
Loading…
| # | Company | Status |
|---|---|---|
| 1 | Admitted-Finance AMTALA MAMUDPUR PAL PARA KANYANAGAR NIBARAN DUTTA ROAD SOUTH 24 PARGANAS WEST BENGAL 743398 | 743398 | Admitted-Finance |
| 2 | Admitted-Finance AURI MOR ANPARA SONEBHADRA ANPARA SONBHADRA UTTAR PRADESH 231225 | SONBHADRA | UTTAR PRADESH | 231225 | Admitted-Finance |
| 3 | Rejected-Technical 18 309 LAL MANI DEVI MARG AGRAWAL NAGAR OBRA OBRA SONBHADRA UTTAR PRADESH 231219 INDIA | SONBHADRA | UTTAR PRADESH | 231219 | Rejected-Technical Documents not Submitted as per PQC |
Tender Value
₹18.9 L
EMD Value
₹19,000
Closing Date
22 Dec 2022, 6:00 pmClosed
SE, OMC-II, BTPS, ATP, Anpara
Office of SE, OMC-II, BTPS, Anpara
Routine Maintenance of Main Boiler Unit 4,5 2X500 MW BTPS Anpara
2022_RVUNL_756827_1
08/BMD-I/BTPS/2022-23
Open Tender
Miscellaneous Works
Fixed-rate
365 days
Unit 4, 5 BTPS, Anpara
Please refer Tender documents.
2 documents required · 2 mandatory
₹1,180
Dy. CAO, CFA BO, BTPS, Anpara
₹19,000
9 Jan 2023
7 Dec 2022
24 Dec 2022
7 Dec 2022
22 Dec 2022
7 Dec 2022
Amount
Preventive maintenance work of Scanner/TV cooling fans,Oil/Coal burner, Igniter guide pipes, BCP inlet/outlet valve and other associated equipment, keeping watch on abnormal sound of boiler first pass, second pass of pressure parts, attending coal dust leakage from Mill outlet Elbow to fuel inlet Elbow by applying sodium silicate & asbestos powder round the clock of boiler unit No. 4&5 of 2x500 MW, BTPS, Anpara. Transportation of consumable such as sodium silicate & asbestos powder etc. from central stores/site store up to work site and their proper stacking shall be maintained.
Preventive maintenance of all Flushing apparatus of economizer ash pan system, removal of chocking, their regular cleaning and disposal of ash in three shifts (each of 08 hrs.)
Removal of choking of interconnecting Ash/ slurry pipe from Ash Pan to central disposal pipe of Eco. Hopper Ash disposal system.
Servicing/ replacement of Plate Valve of Eco. Ash pan System.
Repairing of eroded section of Eco. Ash Pan System/ pipe line by removal of worn out portion and providing patch of 6-10 mm thick M.S. Plate.
Servicing of Butter Fly Valve/ Flushing water nozzles of Eco. Ash pan System.
Removal, disposal and cleaning of Ash/ Slurry, foreign materials accumulated due to overflow of Eco. Ash Disposal System from the Top of the Hot Secondary Interconnecting Duct of Boiler and cleaning the area by compressed air.
Removal, disposal and cleaning of Ash/ Slurry, foreign materials accumulated due to overflow of Eco. Ash Disposal System from the Complete Platform at Economizer Ash Hopper Area of Boiler and cleaning the area by compressed air.
Removal, disposal and cleaning of Ash/ Slurry, foreign materials accumulated due to overflow of Eco. Ash Disposal System from the Complete Platform below Economizer Ash Hopper. Area/ Duct across Guide bearing area of Sec. APH - A & B of Boiler and cleaning the area by compressed air.
System line up for filling of Feed water through Boiler Feed Pump for Hydraulic Test of Boiler, normalization of the same after Hydraulic Test and making the System ready for Boiler Light up.
Replacement of Ash Disposal drain line of Dia. 200-320 mm of Economizer Ash disposal system by cutting & removal of damaged pipes and fitting and Welding of repaired /new pipes by suitable welding electrode.
Operation and running maintenance of flue conditioning system of ESP.
Break Down maintenance of Flue Gas Conditioning system by Attending leakage of welding Joint up to 25 NB
Break Down maintenance of Flue Gas Conditioning system by Attending leakage of welding Joint 26 to 40 NB
Break Down maintenance of Flue Gas Conditioning system by Attending leakage of welding Joint 40 to 100 NB
Break Down maintenance of Flue Gas Conditioning system by Replacement of Needle Valve of 15 mm
Break Down maintenance of Flue Gas Conditioning system by Servicing/ replacement of Valve of 15 to 40 mm
Break Down maintenance of Flue Gas Conditioning system by Servicing/ replacement of Valve/NRV of 40 to 100 mm
Break Down maintenance of Flue Gas Conditioning system by Cleaning/replacement and refixing of Nozzle Fitting
Break Down maintenance of Flue Gas Conditioning system by Replacement of Seal Plate
Break Down maintenance of Flue Gas Conditioning system by Replacement of Bend & 'T'
Complete replacement of old & used economizer ash pan assembly by repaired/new assembly.
Fabrication of economizer ash pan body, liners and bends as required at site for complete assembly of ash pan system.
Fabrication, Erection, commissioning and alignment of one no. chute "0" meter to "70" meter of Boiler unit no.4, 2x500 MW, BTPS, Anpara.
SHAKSHI ENGINEERING CO.
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .